HomeMy WebLinkAboutTermite Cert 8/12/2020 8:29 PM FROM: Staples TO: +17724626443 P. 1
_ Planning &Development Services
Building &Code Regulation Division
2300 Virginia Ave
Fort Pierce,FL 34982
772-462-217'2 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: /9 09- 056k JOB ADDRESS: v
BUILDER/CONTRACTOR: -9c,; AefS S
PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC.
PEST CONTROL LICENSE #:JB175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: Chemicals used: DOMINION 2L
Percentage of solution: .05% Total gallons used: Z o (-->
Date of Treatment: O 1 Time of Treatment:
�oting
Slab
_Kist Treatment p-iet Treatment
Re-Treat Re-Treat
Driveway Poois
1st Treatment 1st Treatment
Re-Treat Re-Treat
Other Pg'meter for final Inspect' n
1st Treatmen /
Re-Treat
PAUL GARA JR O.,i= ,,PALL,,a00 JR
Signature of Exterminator Date
Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job
site to be picked up by the inspector at time of each inspectlon or the scheduled Inspection will fall and a re-Inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weatherres/stantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit Is issued to and another copy for the building permit files The Treatment
Certificate shall pro vide the product used,Identity of the applicator, time and date of the treatment,site location,area
treated,chemical used,percent crPcentration and number of gallons used, to establish a venriable record of
protective treatment. If the soli chemical barn/er method for termite prevention is used,final exterior treatment shall
be completed prior to final building approval.
5t Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014