HomeMy WebLinkAboutPower Release 07-24-'20 11 :17 FROM- 7728787658 T-116 P0003/0004 F-369
Al
10
F . 44462
Proms Addrem C� �THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCPJBED
PROPERTY,FOR A PMOD NOTTO%EED.-THIRTY;(30)pAYS, FOR THE PURPOSE OP TESTING SYSTEMS
AND EQUJPMENT'IN PREPARATION FOR A FiNk:INSPEWON. IN OONSTOERAMON OF APPROVAL OF THE
ili WE'HEREBY ACMOWLEDGE AND A l~-PS FOLLOWS:
I. 7131S turrporary power-r ase is requested for the abov4e sWW purpo' only,and there WM be no
accuparccy of any type,Other t ian that parrrifted by totWirucbon Owing this Idme period.
2. As'v mess by our 49rrai<itres,we heresy,age th wide by'V1 terms and coWitlons of this agreement,
indgdi3ig Building Division Policy,which is iricor.'potafetl hereln by reference.
3. All cond'rtfbris'an-d regLftMerts lied In the attadied document enured"Requirements for 30 Day
Power*for TeZng"have.been fulfilted'and the premise is ready for compliance.inspection.
4. All r.kluesiS for ar►exftnsion beyond 3b days rr'nsst be made in w►'itfrtg toe'Btriie:iing Official-stating
the reasott't`or tt rMgcrest. Power may be removed from,the site.andfor a-Stop WbrkOrder issued.if
the tirrat Inspection has not b' en approved within 30-days. A fee of$100.60 wilt be mgijired to lfit
the Stop Work Order.
WE HEREBY RELEASE AND.AGREETO HOLD iiAk4 ,sT LuCIE COUNTY,AND THEIR EMPLOYEES FROM
ALL LL4BILI'1 lES ANf).CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE.FU 11M OUT
OF`CEt>;5 3RAN ACTItJiy,INCLUDING ANY T A{tA E Uti F FC,H MAY BE IL! WG f>UE TA'THE
,DISCONNECrM N OF E EC JCAL'POD IN THE'S0gT�OF WOLA-170N OF THM AGRMM
t71N►VERSI�i�IATiI DATE
7KCO» DATE
CTRI{Al 7-
CONAAC-MR SIG1*ffiRE DATE