Loading...
HomeMy WebLinkAbout30 day power releasePlanning tk Development Services 01 building & Code -Regulation Division 2300 Virginia Ave Fort Pierce,, FL. 34982 772462-2165 Fax 772462W6443 Request for 3o�Da7 porary Poorer Release Date: 10-26-2020 Project Address: Permit Number: Zoos-oo16 Lot 15 - 5166 Armina Place THE UNDERSIGNED HERBY REQUEST RELEASE OF ELECTRICAL POWER l"0 THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL. INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This fiemporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2, As: witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement, Including Building Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed In the attached document entitled "Requirements for 30 Day Power for Testing" have been fulfilled and ,the premise is ready for compliance Inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order Issued if the Final Inspection has not been approved:within 30 days. A fee of $100.00 will be required to lift the. Stop Work Order, WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH. MAY ARISE. NOW OR ZN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. OWNER I N �tE �'�`DATE Joseph Spalt 10-26-2020 GENERA RACTOR SIGNATURE DATE 10-26-2020 ELECT . ICAL CONTRACTOR SIGNATURE DATE