CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: �>rno<-f- of 61-( JOB ADDRESS: �5g63 w keY
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR: EVICT-A-BLIG TERMITE&PEST CONTROL INC.
PEST CONTROL LICENSE #,J8175775
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association,
Square feet if area treated: Chemicals used. DOMINiON2L
Percentage of solution: .u5°i° Total gallons used:
Date of Treatment: Time of Treatment: T
Footing Slab
1st Treatment I"Treatment
Re-Treat Re-Treat
Driveway Pools
15t Treatment 15t reatment
f Re-Treat -Treat
Qther P er for Final Inspection
15t Treatment
Re-Treat
Sign ure of Extermin Date
Note_ There must be a completed form for each required treatment or re-treatment and this farm must be on the job
site to be picked up by the inspector at tJme of each inspection or the scheduled Inspection will fall and a re-inspection
fee charged
FBC104.2.6 Certificate ofProtective Treatment for prevention of termites A weather res/stantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit Is issued to and another copy for the building permit flies The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location,area
treated,chemical used,percent concentration and number ofgallons used, to establish a verifiable record of
protective treatment If the soll chemical barrier method for termite prevention Is used,final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/2412014