Loading...
HomeMy WebLinkAboutFinal Inspection 999 Passed 12.11.20GF Universal Engineering Sciences Company �HfNATONP INSPECTION RESULTS Inspection Date: 12-11-2020 Permit No. 1910-0659 Project: Century Complete Address: 5711 Eastwood Drive Check one: ® Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment I Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection I Re -inspection Final Building K Final Electrical Final Plumbing I Final Mechanical X Other Inspection Type: Final Area Inspected/Code 999 Inspection Results: ® AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments:PL(Amg;�g,2�--fwx-0 /;leek-4,uiAL-EloA—Ls /Ak&aod 1. 2. 3. 4. S. 6. Inspector's Name:(oo Lic. #: BN-4688 Don Determan OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com