Loading...
HomeMy WebLinkAboutInspection Docs � TruECENEI) DECO 151010 artr PertnlrtMO ceounty nt GALE INSULATION st. S/O#406339811 CERTIFICATE OF INSULATION — INSTALLATION BUILDING PERMIT# — 0(tCj(f JOB ADDRESS: 2990 JOHNSTON RD, FORT PIERCE, FLORIDA STATEMENT OF COMPLIANCE: We, the undersigned, hereby certify that the thermal insulation has been installed in the referenced building in compliance with the Florida Building Code- Energy Conservation and the approved plans and specifications, and in accordance with good construction practice. The insulation furnished is of the type, thickness and R- value as set forth below ------ ---- ---- --- AREA TYPE THICKNESS R-VALUE _ MANUFACTURER ROOF AREA SPRAY FOAM 5.5 R-22 BASF ENERTITE G I GARAGE ROOF AREA ---�- --..— -_—._� INSULATION CGC1512179 ERTIFICATION DATE: SEPTEMBER 4, 2020. INSULATION CONTRACTOR'S SIGNATURE BUILDER: PEACO BUILDERS: SIGNATURE: 1 PERSONALLY KNOW THE AFFIANT, JEROME SCHIMMELPFENNING. Sworn to and subscribed before me this of , 2020. Notary Public, State of Florida a9 , Notary oubbc State or Honda Yennitza Frtrnandez M;Commisszon GG 22UD40 �ha�� E+D.ra505�2'.�2U22 Planning and Development Services Building and Codeode Regulations ations 2300 Virginia Avenue Fort Pierce,FL 34983 RECEIVED • s - ' 772-462-1553 DEC 151010 Fax 772-462-W3 Permitting Depaamen, St, Lucie County TEMPORARY EARLY POWER RELEASE �uw�i ynJ '►-:,q4,J 1U— (Name of Tenant or Owner) The Tenant or Owner requests St Lucie County Development Services Department to release the electrical power at Z,G90 c1Ohn)S4:%2& 20 (address, including suite number, as posted on the electric meter and the building) for building permit #ZOOZ-0499, for the purpose of construction and testing building systems, including air conditioning, refrigeration, lighting,power and control circuits with the following stipulations: 1. Incomplete or untested circuits are NOT to be energized without properly licensed electrical personnel on the jobsite and no systems are to remain energized beyond the testing/temporary purpose without proper inspection by the St Lucie County Building Department appropriately licensed person(s). 2.All panels and disconnects riot in use must be locked in the"OFF"position or fuses removed. 3.Proper procedures for Iockout/tagout must be in place. 4.The electrical equipment mom(where applicable)will remain locked at all times with the key in the possession of the electrical contractor. 5. All final inspections relative to the closeout of this project must be requested and passed in a timely manner as determined by the Electrical Inspector and/or the Building Official. 6. The building may not be occupied before a Certificate of Occupancy(C.O.)is issued. 7.No stocking of materials,other than those required for construction is permitted by this agreement 8.No on-site occupancy or training of personnel employed by the occupant,business entity or owner is permitted by this agreement 9.No furniture,racks,furnishings or other personal or corporate property is permitted on site by this agreement. 10. Construction power remains covered by the requirements for GFCI protection and all other requirements of the governing Codes,see National Electrical Code(NEC)Article 590. Violation of this agreement may result in the immediate termination of the electrical power without prior notice or warning to the affected parties. This form requires all of the following signatures prior to power being released.The undersigned acknowledge that the operation of air conditioning equipment while constriction is in progress may create or increase the risk of contamination or premature failure of the equipment. The undersigned acknowledges the above listed stipulations,agrees to the terms of this agreement and agrees to hold St Lucie County harmless from any damages that may arise as a result of the release of power to the premises. The undersigned hereby requests power to be released for this project.This fort does not guarantee power,which is at the discretion and control of the electrical utility. 1 U It RECEIVED L' '1- vV 7--•=- DEC 151010 Permitting Department St. Lucie County Important: The occupant of the property (or other appropriate party) shall have made proper application to the electric utility, paid any applicable fees or deposits, and requested power in a timely and informed manner. St Lucie County is not responsible for any delays in the receipt of electric power. We acknowledge and accept the terms of this permission. We further acknowledge that violation of this agreement or a finding of unsafe conditions and/or practices found on the site or occupancy of the site may result in immediate disconnection of this temporary power without warning and Y P �' P 8 hereby release St Lucie County and all representatives of any and all liability resulting from us not abiding with this agreement. Goldstar Electric Print Name-Electrical Contractor Company Name 12/14/2020 zo co Signa_uue-E(ctrical Contractor Date Signatu - Date John Cavnar us JL f-('�^� 104 ,,, ;C-( Print Name-Electrical Contractor Print Name-Owner 7c 72> 380 _5913 ( j�_ � Phone Number-Electrical Contractor Phone Number-Owner 23575 Lice #Electrical Contractor rz- I S-2uzo J os +l pis g Prime Contractor Date Print Name-Prime Contractor Company Name 'F`�si 3 ys . oLl 83 Print Name-Prime Contractor Phone Number-Prime Contractor GlaG OSdO�(� License#Prime Contractor Approved for St.Lucie County by: Signature-Electrical Inspector/BO Insp ID# Date Inspector comments,limitations and restrictions: 2