Loading...
HomeMy WebLinkAboutREV 2 12 15 2020 COMMENT RESPONSE HGI PSL  PERMIT NUMBER 2011-0374 REVISION 2 - 12 15 2020 BLDG DEPT COMMENTS/RESPONSE NARRATIVE HILTON GARDEN INN PORT ST LUCIE - 8540 Commerce Centre Drive Port St. Lucir, Fl. ADA SITE/FACILITIES SURVEY & CERTIFICATION / PERMIT CD's C/O Joanne Lee - J.LEE INTERIORS LLC 4805 NW 58 Ave. Coral Springs F. 33067 Architect: Thomas Brown Architect (TBA) Thomas H. Brown, Jr., Architect Fl, LA, SC, NC, GA. VA, OH, AR, NJ, MD, TX, NM, MI &NCARB 5266 Pinto Way, Orlando, Fl. 32810 G.C: Ron Janis - Janis Services Inc. 209 S 3rd St Lantana fl. 561-582-3988 Project Name: ADA SITE/FACILITIES SURVEY & PERMIT CD's per J.LEE INTERIORS - HILTON GARDEN INN PORT ST. LUCIE, FL. Proj No. / Date : TBA- 01 24 2020 - Jan. 24, 2020, May 01, 2020 REVISION 2: IDENTIFIED DELTA 2 12 15 2020 BLDG DEPT COMMENTS NARRATIVE To Whom It My Concern, Delta 2, 12 15 2020 BLDG DEPT COMMENTS PLANS EXAMINER REVIEW INCOMPLETE Jpi, Inc-Andrew 12/2/2020 12/2/2020 Comment: 1) A0.01- TYPE IV CONSTRUCTION IS INCORRECT. "HOTEL" OCCUPANCY IS INCORRECT. (301.1, 601.1) RESPONSE: A.001 CORRECTED TO TYPE OF CONSTRUCTION: TYPE IV PROTECTED. OCCUPANCY: MIXED USE R-2 HOTEL / A-2 SMALL ASSEMBLY. THE BUILDING IS FULLY SPRINKLERED. 12/2/2020 Comment: 2) A-100, A-101- SHOW ACCESSIBILITY ON PLANS, CLEAR FLOOR SPACE AT DESK & SERVING AREAS. ([A]107.2) RESPONSE: ACCESSIBILTY INDICATED ON SHEET A-200, A-201 & A-202 FOR ADA COMPLIANCE OF ALL ELEMENTS ELEMENTS. 12/2/2020 Comment: 3) A-001- PROVIDE THE LEVEL OF ALTERATION AND COMPLIANCE METHOD. (301.1) RESPONSE: A0.01 ADDED LEVEL 2 ALTERATION AND COMPLIANCE METHOD. 12/2/2020 Comment: 4) PROVIDE A LIFE SAFETY PLAN. ([A]107.2.1) RESPONSE: A-200 LIFE SAFETY PLAN INDICATING MAX. DISTANCE TO AN EXIT, FIRE ALARM DEVICES AND OCCUPANCY LOAD. 12/2/2020 Comment: 5) PROVIDE CONSTRUCTION DETAILS FOR ALL WORK- I.E. WALL TYPES, CEILING ASSEMBLIES, PATCHING FLOOR FOR REMOVED PLUMBING, ECT. ([A]107.2.1) RESPONSE: WALL TYPES; THERE IS ONLY ONE NON BEARING WALL BEING REMOVED AT THE "SHOP". CEILING ASSEMBLIES: THERE IS ONLY A SMALL PORTION OF SUSPENDED ACOUSTIC TILE CEILING (LESS THAN 100 SQ. FT.) BEING REMOVED OR ADDED. PATCHING FLOOR; THIS IS THE GROUND FLOOR. ANY PENETRATIONS AT THE SECOND FLOOR ARE COVERED BY ADDED SHEETS A8.01 & A8.02. 12/2/2020 Comment: 6) A-202- PROVIDE DIMENSIONS, SHOW ACCESSIBILITY STALLS, ACCESSORY MOUNTING HEIGHTS, & CLEAR FLOOR SPACE FOR DIAPER CHANGING TABLES. ([A]107.2.1) RESPONSE: A-201 & A-202 ADDED ALL MOUNTING HEIGHTS AND CLEAR FLOOR SPACE @ FIXTURES. 12/2/2020 Comment: 7) PROVIDE FLAME & SMOKE SPREAD REQUIREMENTS FOR INTERIOR FINISHES. (801.1) RESPONSE: A0.01 ADDED CLASS C FLAME AND SMOKE SPREAD REQUIREMENTS FOR FULLY AUTO SPRINKLERED BUILDING. 12/2/2020 Comment: 8) IDENTIFY FIRE SEPARATION (FIRE WALLS & PARTITIONS). PROVIDE UL ASSEMBLY (501.1). RESPONSE: THERE ARE NO FIRE SEPERATIONS ON THE GROUND FLOOR. TBA – ThomasBrownArchitect LIC AR 7661 - DATE: 12 15 2020 - Thomas H. Brown Jr. ______________________________________________________________________