HomeMy WebLinkAboutHVAC Design for Fieldstone Construction Inc�. Digitally signed by
CaIcsa
Thomas V Platania
�. 'We arethe missing piece' wE
bat
CAC1815254 ProCalcs, LLC "201 9'1 0'24
07:45`09-04'00'
FIELDSTONE C ONSTRUCTICIN I NCI
• • •
1. CONTRACTOR SHALL PROVIDE A tCOMPLE FE AND OPERABLE MECHANICAL SYSTEM.
2. THESE DRAWINGS ARE DIAGRAMMATIC IN MATURE. CAREFUL ATTENTION SHALL BE PAID TO PRECISE LOCATION AND
COORDINATION OF DIFFUSERS, REGISTERS, AND GRILLES WITH STRUCTURAL FRAMING AND ELECTRICAL FIXTURES AT
CEILING LOCATIONS. ELECTRICAL FIXTURES AT CEILING TAKE PRIORITY OVER DUCT LAYOUT. ELECTRICAL FIXTURES AT
CEILING ARE NOT TO BE MOVED FROM THEIR PROPOSED LOCATIONS. SEE THE REFLECTED CEILING PLANS, WHERE
AVAILABLE, FOR EXACT LOCATIONS OF CEILING FIXTURES. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT PERMISSION
FROM STRUCTURAI ENGINEER.
3, THE CONTRACTOR SHALL OBTAIN.. A:. HIS EXPENSE, ALL NECESSARY FEES, PERMITS, AND TESTS.
4, ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, ORDINANCES AND REQUIREMENTS OF AUTHORITIES
HAVING JURISDICTION. NO CONTRACTOR SHALL BID UNLESS FAMILIAR WITH THESE CODES. ALL WORK SHALL BE
EXECUTED IN A WORKMANLIKE MANNER AND SHALL PRESENT A NEAT, PROFESSIONAL APPEARANCE WHEN COMPLETED.
ALL MATERIALS AND EQUIPMENT SHALL BE NEW. STORE AND INSTALL MATERIALS AND EQUIPMENT IN ACCORDANCE WITH
THE MANUFACTURER'S INSTRUCTIONS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE HVAC SYSTEM(S) TO BE INSTALLED (REFRIGERANT LINES, EQUIPMENT,
DUCTWORK, GRILLES, ETC.) ADDITIONAL OFFSETS, TRANSITIONS, ETC. MAY BE REQUIRED TO PROVIDE A COMPLETE
SYSTEM. NO ABRUPT TRANSITIONS SHALL BE PERMITTED, THE MECHANICAL WORK HEREIN INCLUDES COMPLETE
SYSTEMS OF HEATING.. AIR CONDITIONING (TEMPERATURE AND HUMIDITY CONTROL), VENTILATION, BATHROOM EXHAUST,
KITCHEN EXHAUST, AND ALL DUCTWORK. THE CONTRACTOR SHALL PROVIDE EACH ELEMENT THEREOF, AS INDICATED
HEREIN, OR REASONABLY INFERRED (WHETHER OR NOT SPECIFICALLY CALLED FOR BY ITEM), REASONABLY NECESSARY TO
FACILITATE EACH SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND EQUIPMENT SPECIFIED. CONTRACTOR SHALL
VERIFY SPACE CONDITIONS PRIOR TO THE FABRICATION OR INSTALLATION OF ANY WORK.
6. THE CONDENSING UNIT AND AIR HANDLING UNIT EQUIPMENT SHALL BE AS SPECIFIED OR ARCHITECT APPROVED
SUBSTITUTE.
7. PRIOR TO START OF THE HVAC WORK, THE CONTRACTOR SHALL SUBMIT, TO THE ARCHITECT, AN UPDATED MANUAL J LOAD
ANALYSIS, BASED ON THE FINAL CONTRACTOR DOCUMENTS AND ACTUAL MATERIALS AND PRODUCTS SELECTED (ie:
BUILDING ENVELOPE INSULATION, EXTERIOR DOOR GLAZING, AND ANY OTHER APPLICABLE FACTORS THAT WOULD AFFECT
THE UPDATED MANUAL J LOAD ANALYSIS). THE SIZING OF THE ACTUAL HVAC SYSTEMS TO BE UTILIZED (REFRIGERANT
LINES, EQUIPMENT, DUCTWORK.. GRILLES, ETC.) SHALL BE BASED ON THE UPDATED MANUAL J LOAD ANALYSIS. THE
CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR PROPERLY SIZING THE HVAC SYSTEM,
8. THE CONTRACTOR SHALL COORDINATE A "MECHANICAL WALK-THROUGH" MEETING, WHICH IS TO OCCUR PRIOR TO THE
START OF THE MECHANICAL ROUGH -IN. THE PURPOSE FOR THIS MEETING IS TO ALLOW THE OWNER, ARCHITECT, AND
CONTRACTOR TO REVIEW AND COORDINATE FINAL DUCT AND AIR DEVICE LOCATIONS. THE MECHANICAL
SUBCONTRACTOR'S FOREMAN IS TO ATTEND THIS MEETING AS WELL.
9. NO CHANGES TO THE HVAC PLANS OR NOTES SHALL BE PERMITTED WITHOUT PROCALCS, LLC. PRIOR APPROVAL.
10. REFRIGERANT PIPING SHALL BE TYPE "L" SOFT DRAN COPPER, ASTM B280, AND SHALL BE MILL CLEANED, DRIED AND
CAPPED. INSULATE REFRIGERANT i SUCTION LINE WITH " WALL FOAMED PLASTIC INSULATION SLIPPED OVER TUBING AND
ALL JOINTS THOROUGHLY SEALED. PAINT REFRIGERANT PIPING 2 INSULATION WITH TWO (2) COATS OF ACRYLIC
PROTECTIVE PAINT WHERE INSULATION IS EXPOSED TO WEATHER.
11, ALL FIBERGLASS DUCTWORK SHALL_ BE 1-1/2" FIBROUS GLASS ANTI-MICROBIA�DUCTBOARD INSTALLED IN ACCORDANCE
WITH THE LATEST EDITION OF S.M.A.C.N.A. FIBROUS GLASS DUCT CONSTRUC ION STANDARDS. 1" FIBROUS GLASS
ANTI -MICROBIAL DUCTBOARD MAY BE USED IN THOSE LOCATIONS WHERE ALLOWED BY CODE. NO ABRUPT TRANSITIONS
SHALL BE PERMITTED. PROVIDE AIR TURNING VEINS IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.
12. FLEXIBLE DUCTWORK SHALL BE THERMAFLEX M-KA TYPE WITH 1-1/2" ONE -PO ND DENSITY INSULATION AND VINYL VAPOR
BARRIER OR ARCHITECT APPROVED SUBSTITUTE. NO ABRUPT TRANSITIONS $HALL BE PERMITTED.
13. DUCT SIZES SHOWN ARE INSIDE NET DIMENSIONS.
14. ALL AIR DEVICES SHALL BE MANUFACTURED BY TITUE, 250 SERIES, OR APPIRVED SUBSTITUTE. COLOR TO BE APPROVED
BY THE PROFESSIONAL OF RECORD PRIOR TO PAINTING GRILLES BUT ASSUMED TO BE WHITE FOR BID/BUDGET PURPOSES.
SUPPLY AIR REGISTERS SHALL BE DOUBLE DEFLECTION TYPE WITH OPPOSED BLADE DAMPERS. ALL SIZES AND PATTERNS
ARE NOTED ON THE MECHANICAL PLANS.
15, FOP EACH RETURN AIR GRILLE, PROVIDE 3M FILTRETE 1000 MICRO ALLERGEN PLEATED AIR FILTERS (3M, 800-49403552,
www.s`"trete.com, MERV RATING: 11, PRESSURE DROP: .2 @ 300 FPM, OR APPROVED SUBSTITUTE). PRIOR TO INSTALLATION,
THE CONTRACTOR SHALL VERIFY THAT THE AIR VELOCITY NOICE ACROSS EACH RETURN AIR FILTER WILL. BE LOW, BASED
ON rHE PRESSURE DROP FOR PROPOSED FILTER TYPE AND THE PROPOSED, RETURN AIR GRILLE SIZE(S). ANY RETURN AIR
FILTER GRILLES THAT ARE REQUIRED TO BE RESIZED BY THE CONTRACTOR, ARE TO BE SIZED FOR FILTER SIZES THAT ARE
READILY AVAILABLE AT HOME SUPPLY STORES. CUSTOM SIZES ARE NOT PERMITTED.
16. ALL. BATH, KITCHEN, AND DRYER EXHAUST(S) SHALL BE VENTED TO THE EXTIERIOR.
17. ALL. BATH EXHAUST FANS SHALL BE DUCTED WITH 4" R-FIN. SLOPE AND FULLY SUPPORT ALL BATHROOM EXHAUST DUCTS
TO AVOID ANY SNAGS IN THE DUCT AND TO ALLOW FOR PROPER DRAINAGE. TERMINATE AT SOFFIT WITH SCREENED
GRILLE, UNLESS OTHERWISE NOTED.
18. PROVIDE BACKDRAFT DAMPERS FOR ALL EXHAUST FANS.
19. ALL. EXHAUST AIR DUCTS SHALL BE GALVANIZED SHEET METAL CONSTRUCTED AND INSTALLED IN ACCCPD,ANCE WITH
AS RAE AND SMACNA STANDARDS.D
20. TESTING, ADJUSTING, AND BALANCING: THE CONTRACTOR SHALL BALANCE THE AIRFLOW DISTRIBUTION SYSTEMS,
INCLUDING SUB MAINS, BRANCHES, AND TERMINALS TO QUANTITIES INDICATED ON THE UPDATED MANUAL J LOAD
ANALYSIS (FOR RESIDENTIAL PROPERTIES) AND MANUAL J (COMMERCIAL PROPERTIES).
21, PROVIDE DRAW -THROUGH CONDENSATE TRAP AT EACH UNIT CONDENSATE (DRAIN. DEPTH SHALL BE AT LEAST 1-1/2 TIMES
TH TOTAL S.P DROP OF THE UNIT.
22. PR VIDE PROGRAMMABLE SERIES 7-DAY THERMOSTAT. PRIOR TO ORDERING THE THERMOSTAT, THE CONTRACTOR SHALL
VE IFY THAT THE SPECIFIED THERMOSTAT WILL OPERATE PROPERLY WITH THE PROPOSED AIR CONDITIONING EQUIPMENT.
IF 'SUBSTITUTE IS REQUIRED, CONTRACTOR MUST SUBMIT PRODUCT INFORMATION TO ARCHITECT FOR PRODUCT
APPROVAL. COORDINATE THERMOSTAT LOCATION WITH FURNITURE/EQUIPMENT LAYOUTS, WINDOWS AND DOOR SWINGS.
THERMOSTAT MUST BE LOCATED AT 54" A.F.F AND NOT LOCATED ON AN OUTSIDE WALL.
23 SUPPLY AND RETURN AIR GRILLES SHALL MAINTAIN A MINIMUM DISTANCE OF S-0" FROM CEILINGS FANS.
24. ALL DUCT BRANCHES, PER ACCA MANUAL D, SHOULD INCLUDE DAMPERS FOR PROPER AIR FLOW AND BALANCING.
25. NO EQUIPMENT SHALL BE PURCHASED UNTIL REVIEW BY THE PROFESSIONAL_ OF RECORD, EVEN IF EQUIPMENT HAS BEEN
SPECIFIED.
26. ANY VARIATION FROM THE DESIGN PRESENTED COULD AFFECT SYSTEM PERFORMANCE.
27, EQUIPMENT SHALL BEAR A U.L. OR OTHER RECOGNIZED LABEL, NAMEPLATES, WIRING DIAGRAMS, AND ENERGY RATINGS,
AS APPLICABLE.
28. CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND ACCESSORIES SO THAT IT IS READILY ACCESSIBLE FOR SERVICING,
TESTING, BALANCING AND REPLACEMENT.
29. CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE AGAINST DEFECTS INALL MATERIALS AND WORKMANSHIP FOR ONE
(1) YEAR FROM ACCEPTANCE WITH FOUR ADDITIONAL YEARS OF WARRANTY ON COMPRESSORS.
30. PRIOR TO ACCEPTANCE BY THE OWNER, THE SYSTEMS SHALL BE TESTED AND BALANCED BY A AABC OR NEBB CERTIFIED
T&B CONTRACTOR EXPERIENCED WITH THIS SYSTEM. THE CONTRACTOR SHALL CERTIFY THE TESTING AND BALANCING
WITHIN +/- 10% OF DESIGN CFMS AND PROVIDE BALANCE TEST SHEETS.
31. ALL OUTSIDE DUCTWORK SHALL BE SHEET METAL. AND WRAPPED WITH 1-1/2" INSULATION.
32, AIR BALANCE TO BE PERFORMED BY THE AIR CONDITIONING CONTRACTOR TO THE OWNER'S COMFORT. ALL SUPPLY AND
RETURN DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS AND LOCAL BUILDING CODES.
33, PROVIDE ALL CONTROLS, STARTERS, CONTROL WIRING, DISCONNECTS, AND OTHER ELECTRICAL EQUIPMENT AS REQUIRED
FOR A COMPLETE AND OPERATIONAL SYSTEM. MECHANICAL CONTRACTOR IS TO COORDINATE WITH OTHER
CONTRACTORS TO ENSURE THAT ALL ITEMS REQUIRED ARE INCLUDED IN
34. COORDINATE ALL POWER AND CONTROL WIRING WITH ELECTRICIAN.
35. FLEXIBLE DUCT, WHERE SHOWN, SHALL BE U L. CLASS 1 WITH 1-1/2" INSULATION WITH VAPOR; BARRIER.
36. SUPPLY AND RETURN DUCTWORK IS TO BE FIBERGLASS DUCTWORK, R-6, UNLESS SHOWN OTHERWISE.
a
ro
m
U
PO Box 882032
Port Saint Lucie, FL 34988
Phone: 772-882-5700
www.ProCalcs.Net
tom@procalcs.net
License CAC1815254
i
db
No. Revision/Issue Date
1 Issue 10/21/19
For:
Fieldstone Construction Inc
PO BOX 20001
Palm Beach Gardens, FL 33420
Drawn BY: Sheet
ZWM
Checked By:
TP
Date: M— 1
10/21/19
Scale:
As Shown
IX
O
i
a
GENERAL NOTES:
1. All supply ducts are designed per ACCA Manual D.
2. All supply branches are designed according to ACCA Manual D for
the highest CFM's required Heating or Cooling, for the room load
per ACCA Manual J.
3. It is the installing HVAC Contractor's responsibility to install air
volume dampers to adjust appropriate air flow accordingly.
First Floor HVAC Plan
PO Box 882032
Port Saint Lucie, FL 34988
Phone: 772-882-5700
www.ProCalcs.Net
tom@procalcs.net
License CAC 1815254
No. Revision/Issue Date
1 Issue 10/21/19
For:
Fieldstone Construction Inc
PO BOX 20001
Palm Beach Gardens, FL 33420
Drawn By: Sheet
ZWM
Checked By:
TP L
M_^
Date:
10/2I/19
Scale:
As Shown
A
0
F
w
Second Floor HVAC Plan
1 /4"=1'-01,
GENERAL NOTES:
1. All supply ducts are designed per ACCA Manual D.
2. All supply branches are designed according to ACCA Manual D for
the highest CFM's required Heating or Cooling, for the room load
per ACCA Manual J.
3. It is the installing HVAC Contractor's responsibility to install air
volume dampers to adjust appropriate air flow accordingly.
a)
w
tf
a)
U
fl
'We are the missing piece'
PO Box 882032
Port Saint Lucie, FL 34988
Phone: 772-882-5700
www.ProCalcs.Net
tom@procalcs.net
License CAC 1815254
No. Revision/Issue Date
1 Issue 6/25/19
For:
Fieldstone Construction Inc
PO BOX 20001
Palm Beach Gardens, FL 33420
Drawn By: Sheet
ZWM
Checked By:
TP M-3
Date:
10/21/19
Scale:
As Shown
F
Ll
CONDENSING UNIT BOLTED TO
CONCRETE PAD TO WITHSTAND
HURRICANE FORCE WINDS. AS
PER FBCM 301.12
2" CONCRETE SLAB. TOP
SLAB.
PAD (TYPICAL)
COND. UNIT
ISOMODE PAD-
2" CONIC. PAD
.................
16 GA. HURRICANE
STRAP
114" X 2" SELF -DRILLING
SHEET METAL SCREW
3/8" X21/2" QUICK -BOLT'
EXPANSION ANCHOR.
(TYPICAL OF 4 ONE PER
CORNER OF UNIT)
NOTE:
CONDENSING UNITS TO BE INSTALLED ABOVE FLOOD LEVEL CRITERIA.
CONDENSING UNIT MOUNTING DETAIL NTS
FLEXIBLE DUCT SAG
NOT TO EXCEED 1/2"
PER FOOT MAX.—.,
FLEX DUCT
I I MAINTAIN RADIUS OF BEND
TO NOT LESS THAN ONE
DUCT DIAMETER
Legend
Please note not all symbols may apply.
T T
Supply grille
y y
® Linear supply grille
Sidewall supply grille
y y
->N<- Return grille
T T
Linear return grille
-m- Sidewall return grille
®
Riser duct up/down
SDD
Smoke Duct Detector
0
Thermostat
0'
Thermostat (for zoned systems)
N
Exhaust fan
LZone
damper
.�\11Condensing
I
FLEX
* PLACE AIR HANDLING UNIT IN THE ROOM SO THAT
SERVICE TO THE UNIT & FILTER CAN BE
ACCOMPLISHED.
20 GAUGE GALVANIZED DROP PAN
UNDER ENTIRE UNIT W/ MOISTURE
SENSOR
DUCT
SUPPORT
VERTICAL AHU DETAIL NTS
LOCKING ANT GALA STEEL ROD OR
HANGER (TYP.) TO BEEXPOSED
STRAP SUPPORTS PER
SMACNASTANDARDS
FLEXIBLE DUCT WITH SIDE TAKE -OFF FITTING
INSULATION 8 WITH DAMPER, BELL MOUTH
VAPOR BARRIER OR SHOETAP TYPE (SEE NOTE)
2" MIN. SUPPORT STRAP MAIN SUPPLY AIR
18" MAX. FROM DEVICE AND TIE TO DUCT, SEE PLANS FOR
5'-0" ON CENTER STRUCTURAL TYPE AND I SULATION
SUPPORTS
_ —
2" WIDE METAL BAND
SUPPORT
MAXIMUM ALLOWABLE
LENGTH OF FLEX. DUCT
8 —0 I /
1-1/2" X 1-1/2" X 1/8" GALV.
SQUARE TO ANGLE OR STRAP PER SMACNA
ROUND CONNECT INNER DUCT WITH DRAWBAND
ADAPTER
AND SEAL WITH TAPE/MASTIC OUTERDUCT
�r AT NECK CONNECTION
PROVIDE THERMAL INSULATION BLANKET
IF INSTALLED IN UNCONDITIONED SPACE
FLEX DUCT
SUSPENDED TYPE LOUVERED FACE CEILING DIFFUSER
CEILING SYSTEM
DUCTWORK SUPPORT DETAILS NITS TYPICAL DIFFIJSER DETAIL NTS
EQUIPMENT SCHEDULE
CU NUMBER
CU-1
CU-2
NOMINAL TONNAGE
1 ton(s)
4 ton(s)
MODEL
25VNA813AO030
25VNA848AO030
Z
SEER/EER/HSPF
17.00/13.00/9.5
18.00/11.00/11.00
o9
CAPACITY TOTAL/SENS.
12334/9779
44214/33321
Z
STAGES
Variable
Variable
Z
W
G
Z
p
RLA
Voltage
Phase
MCA/MOP
10.3
208/230 460 L
23.9
208/230 JXJ 460
Single 1XIThree
Single
Three
13.5/20
31.4/50
v
WEIGHT
139
218
AHU NUMBER
AHU-1
AHU-1
AHU-MODEL
FE4ANF002L++UI
FE4ANF005L++UI
STATIC PRESSURE
0.60
0.60
REFRIGERANT
R-410A
R-410A
LOCATION
Mech Room
Mech Closet
CFM
525
1225
FAN MOTOR HP - FLA
0/0 - 0.0
1 /2 - 4.3
cc
J
Z
ELECTRIC HEATER Voltage
Phase
kW
Model Number
MCA/MOP
DIMENSIONS H x W x D
208
Xj
230
Xj
4601
208
230
460
Single
X1
Three
I
I
Single JXJ
Three
11.9 (208V) - 14.3 (230V)
6 (208V) - 8 (230V)
KFCEH2401C05
KFCEH2501C08
XX/XX 208V - XX/XX 230V
00-0/0 x 00-0/0 x 00-0/0
45/50 208V - 59/60 230V
53-7/16 x 21-1/8 x 22-1/16
Q
XREF
a
WEIGHT
LINES SIZES
NOTES: Carrier
000
0/0, 0/0
AHRI #: 9892838
128
7/8, 3/8
AHRI #: 9893287
GRILLE SCHEDULE
Titus Series 250
Size
Velocity FPM)
400
500
8 x 4
CFM
50
60
Throw (ft)
4-way
3-way
2-way
1-way
12
14
13
15
14
17
17
121
6 x 6
CFM
80
N/A
Throw (ft)
4-way
3-way
2-way
1-way
13
N/A
14
N/A
15
N/A
18
N/A
8 x 6
CFM
105
N/A
Throw (ft)
4-way
3-way
2-way
1 -way
14
N/A
15
N/A
12
N/A
15
N/A
10 x 6
8 x 8
CFM
1140
N/A
Throw (ft)
4-way
3-way
2-way
I -way
15
N/A
15
N/A
13
N/A
17
N/A
CFM
250
N/A
10 x 10
Throw (ft)
4-way
3-way
2-way
1-way
17
N/A
18
N/A
20
N/A
120
1 N/A
a)
a)
U
a
PO Box 882032
Port Saint Lucie, FL 34988
Phone: 772-882-5700
www.ProCalcs.Net
tom@procalcs.net
License CAC 1815254
No. Revision/Issue Date
1 Issue 10/21/19
For:
Fieldstone Construction Inc
PO BOX 20001
Palm Beach Gardens, FL 33420
Drawn By: ZWM Sheet
Checked By:
TIP m-4
Date:
10/21/19
Scale.
As Shown
rn
0
N
U
_J
U
m
U
0
o_
L
T
0-
0
Ar
L
Notes:
{-xx.xx} Drop dimentions listed from Finished 1st floor elevation
to top of pipe
Nominal Drop angle 1/4" per V
C = Cold Water Supply (Blue PEX)
H = Hot Water Supply (Red PEX)
V = Vent
Route ALL pressurized water lines thru 2nd floor system
Black Water / Foundath
Pass Through,
sleeved with 5" Sch 80 P
Master Bath Drains to tl
System Cleanout Port
Black Water / Foundatic
Pass Through,
sleeved with 5" Sch 80 P
Tie in for Future Pool Cabana Sink &
Clean out port
43'-5" [.
septic & drainfeld print
ns to this point
t`
00
ch
�
a
•v
QI
oa
�
d
"gz
7
G .:
Uwr
LN
C�
M
Page: 20
Scale:
1' =1/4" (1:48)
Notes:
{-xx.xx} Drop dimentions listed from Finished 2nd floor elevation to top of pipe
Nominal Drop angle 1/4" : V
C = Cold Water Supply (Blue PEX)
H = Hot Water Supply (Red PEX)
V = Vent
Route ALL pressurized water lines through 2nd floor system
MI = Manifold distribution to Kitchen, Bathroom 2, Laundry, Garage Sink,
Bar Sink, SW & NW Decks, Lanai
M2 = Manifold distribution to Master Bath, Master, Bathroom 3,
SE Deck & Equipment Pad
Master Bath Draii(s f
point to Lower lev9l
r
4%
MAY
.uy
Cd
G
u
C
a
�
Q
� �
H
O
a
O
i•
'�' �
of
x
.�
Uwe
1�1
H
r"
en
kn
v-4
Page: 21.
Scale:
V =1/4" (1:48)
Notes:
1) {-xx.xx} Drop dimentions listed from Finished 1st floor elevation
to top of pipe
2) Benchmark Referance point 5.00" Below exisiting elevation
Benchmark Approx 29.00" Below Str
3) Wet season water table 8.00" Below e:
4) Soil texture / Loading rate for system
5) Floor l finished elevation 48.00" abov
6) Dative elevation — 24.00" below street
t�-
00
CT
M
C�
�
r
Qa
y
�
V�
u
C`
M
lf�
.—r
KR
N
CC3
1..4
Page: 22
Scale:
1' =114" (1:48)
Notes:
OF :Motion Sensor Security Light
GFCI = Ground Fault indicator Circuit
= Recessed Can Light (Screw In Bulbs)
= Wall Sconce Light
G = Smoke Detector
= Heavy Light Fixture
Q = Coax
BNC & 12V
= Carbon Monoxide Detector
�— Cat 5 Data
= Phone Jack
GDO = Garage Door Opener
Use code approved metal electrical boxes attached to concrete directly with
a minimum of 2 concrete rated screws
Trench ICF foam to a minimum of 2" deep for wireing routing, use expanding
foam or code rated glue to attach wires with in the trench
Conduit Routing to Pool equipment
(Future expansion)
w
F
ci
G y
U00
Qr
Page: 23
Scale:
V =114" (1:48)
40 Gal
Water
Open Deck
{
\
\
\
1
1
I
Master Bedroom '
/
i
(W1j
M
/
f Master Bathroom
1 l !
l , f
a 1
i \
a , 5
e / t
Mai
® Libary
fif rt
,
Elevator
Rough in only
Removable
Floor Installed `♦ 1
1
cw `.
u
�`N
Stairway
Open to below,/
F -'):�
------------
1 1 '
,
- , r
t \ I
I—
r
1
t
1
i
r
r
/
t --
_-
Fa
Room
;
I
1
fill
`
1
I,/1
)
t
1
r
r
SD
I
1
1
t
I
r
1
{
{
HVAC #1
Entry Air Handler
t 24Wo
t
i
Covered Deck
Open Deck
—� Pantry
r '
r 1
40 Gal
Water Heat
/
r
1- 1
1 " `
1 \ t
/ 1 /
j, Kittchen
r/' Sink Oven ttr / �+
(� tON
7 /
24W i 1 bti
t 1
I
b♦
/
r-
\ /
Bedroom Z
Dining
J Drver
•1 24M
L44mdry
1
I
I
Bedroom 3
-I-,_L---a_---
Open Deck
I'`
00
ON
�a
C}
o
C CCi
� rn
0
JC
4 U(10
CJ
y OQ
)
5-i
Page: 24
Scale:
1' =1/4" (1:48)