Loading...
HomeMy WebLinkAboutHVAC Design for Fieldstone Construction Inc�. Digitally signed by CaIcsa Thomas V Platania �. 'We arethe missing piece' wE bat CAC1815254 ProCalcs, LLC "201 9'1 0'24 07:45`09-04'00' FIELDSTONE C ONSTRUCTICIN I NCI • • • 1. CONTRACTOR SHALL PROVIDE A tCOMPLE FE AND OPERABLE MECHANICAL SYSTEM. 2. THESE DRAWINGS ARE DIAGRAMMATIC IN MATURE. CAREFUL ATTENTION SHALL BE PAID TO PRECISE LOCATION AND COORDINATION OF DIFFUSERS, REGISTERS, AND GRILLES WITH STRUCTURAL FRAMING AND ELECTRICAL FIXTURES AT CEILING LOCATIONS. ELECTRICAL FIXTURES AT CEILING TAKE PRIORITY OVER DUCT LAYOUT. ELECTRICAL FIXTURES AT CEILING ARE NOT TO BE MOVED FROM THEIR PROPOSED LOCATIONS. SEE THE REFLECTED CEILING PLANS, WHERE AVAILABLE, FOR EXACT LOCATIONS OF CEILING FIXTURES. NO STRUCTURAL MEMBER SHALL BE CUT WITHOUT PERMISSION FROM STRUCTURAI ENGINEER. 3, THE CONTRACTOR SHALL OBTAIN.. A:. HIS EXPENSE, ALL NECESSARY FEES, PERMITS, AND TESTS. 4, ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, ORDINANCES AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. NO CONTRACTOR SHALL BID UNLESS FAMILIAR WITH THESE CODES. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND SHALL PRESENT A NEAT, PROFESSIONAL APPEARANCE WHEN COMPLETED. ALL MATERIALS AND EQUIPMENT SHALL BE NEW. STORE AND INSTALL MATERIALS AND EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE HVAC SYSTEM(S) TO BE INSTALLED (REFRIGERANT LINES, EQUIPMENT, DUCTWORK, GRILLES, ETC.) ADDITIONAL OFFSETS, TRANSITIONS, ETC. MAY BE REQUIRED TO PROVIDE A COMPLETE SYSTEM. NO ABRUPT TRANSITIONS SHALL BE PERMITTED, THE MECHANICAL WORK HEREIN INCLUDES COMPLETE SYSTEMS OF HEATING.. AIR CONDITIONING (TEMPERATURE AND HUMIDITY CONTROL), VENTILATION, BATHROOM EXHAUST, KITCHEN EXHAUST, AND ALL DUCTWORK. THE CONTRACTOR SHALL PROVIDE EACH ELEMENT THEREOF, AS INDICATED HEREIN, OR REASONABLY INFERRED (WHETHER OR NOT SPECIFICALLY CALLED FOR BY ITEM), REASONABLY NECESSARY TO FACILITATE EACH SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND EQUIPMENT SPECIFIED. CONTRACTOR SHALL VERIFY SPACE CONDITIONS PRIOR TO THE FABRICATION OR INSTALLATION OF ANY WORK. 6. THE CONDENSING UNIT AND AIR HANDLING UNIT EQUIPMENT SHALL BE AS SPECIFIED OR ARCHITECT APPROVED SUBSTITUTE. 7. PRIOR TO START OF THE HVAC WORK, THE CONTRACTOR SHALL SUBMIT, TO THE ARCHITECT, AN UPDATED MANUAL J LOAD ANALYSIS, BASED ON THE FINAL CONTRACTOR DOCUMENTS AND ACTUAL MATERIALS AND PRODUCTS SELECTED (ie: BUILDING ENVELOPE INSULATION, EXTERIOR DOOR GLAZING, AND ANY OTHER APPLICABLE FACTORS THAT WOULD AFFECT THE UPDATED MANUAL J LOAD ANALYSIS). THE SIZING OF THE ACTUAL HVAC SYSTEMS TO BE UTILIZED (REFRIGERANT LINES, EQUIPMENT, DUCTWORK.. GRILLES, ETC.) SHALL BE BASED ON THE UPDATED MANUAL J LOAD ANALYSIS. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR PROPERLY SIZING THE HVAC SYSTEM, 8. THE CONTRACTOR SHALL COORDINATE A "MECHANICAL WALK-THROUGH" MEETING, WHICH IS TO OCCUR PRIOR TO THE START OF THE MECHANICAL ROUGH -IN. THE PURPOSE FOR THIS MEETING IS TO ALLOW THE OWNER, ARCHITECT, AND CONTRACTOR TO REVIEW AND COORDINATE FINAL DUCT AND AIR DEVICE LOCATIONS. THE MECHANICAL SUBCONTRACTOR'S FOREMAN IS TO ATTEND THIS MEETING AS WELL. 9. NO CHANGES TO THE HVAC PLANS OR NOTES SHALL BE PERMITTED WITHOUT PROCALCS, LLC. PRIOR APPROVAL. 10. REFRIGERANT PIPING SHALL BE TYPE "L" SOFT DRAN COPPER, ASTM B280, AND SHALL BE MILL CLEANED, DRIED AND CAPPED. INSULATE REFRIGERANT i SUCTION LINE WITH " WALL FOAMED PLASTIC INSULATION SLIPPED OVER TUBING AND ALL JOINTS THOROUGHLY SEALED. PAINT REFRIGERANT PIPING 2 INSULATION WITH TWO (2) COATS OF ACRYLIC PROTECTIVE PAINT WHERE INSULATION IS EXPOSED TO WEATHER. 11, ALL FIBERGLASS DUCTWORK SHALL_ BE 1-1/2" FIBROUS GLASS ANTI-MICROBIA�DUCTBOARD INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF S.M.A.C.N.A. FIBROUS GLASS DUCT CONSTRUC ION STANDARDS. 1" FIBROUS GLASS ANTI -MICROBIAL DUCTBOARD MAY BE USED IN THOSE LOCATIONS WHERE ALLOWED BY CODE. NO ABRUPT TRANSITIONS SHALL BE PERMITTED. PROVIDE AIR TURNING VEINS IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. 12. FLEXIBLE DUCTWORK SHALL BE THERMAFLEX M-KA TYPE WITH 1-1/2" ONE -PO ND DENSITY INSULATION AND VINYL VAPOR BARRIER OR ARCHITECT APPROVED SUBSTITUTE. NO ABRUPT TRANSITIONS $HALL BE PERMITTED. 13. DUCT SIZES SHOWN ARE INSIDE NET DIMENSIONS. 14. ALL AIR DEVICES SHALL BE MANUFACTURED BY TITUE, 250 SERIES, OR APPIRVED SUBSTITUTE. COLOR TO BE APPROVED BY THE PROFESSIONAL OF RECORD PRIOR TO PAINTING GRILLES BUT ASSUMED TO BE WHITE FOR BID/BUDGET PURPOSES. SUPPLY AIR REGISTERS SHALL BE DOUBLE DEFLECTION TYPE WITH OPPOSED BLADE DAMPERS. ALL SIZES AND PATTERNS ARE NOTED ON THE MECHANICAL PLANS. 15, FOP EACH RETURN AIR GRILLE, PROVIDE 3M FILTRETE 1000 MICRO ALLERGEN PLEATED AIR FILTERS (3M, 800-49403552, www.s`"trete.com, MERV RATING: 11, PRESSURE DROP: .2 @ 300 FPM, OR APPROVED SUBSTITUTE). PRIOR TO INSTALLATION, THE CONTRACTOR SHALL VERIFY THAT THE AIR VELOCITY NOICE ACROSS EACH RETURN AIR FILTER WILL. BE LOW, BASED ON rHE PRESSURE DROP FOR PROPOSED FILTER TYPE AND THE PROPOSED, RETURN AIR GRILLE SIZE(S). ANY RETURN AIR FILTER GRILLES THAT ARE REQUIRED TO BE RESIZED BY THE CONTRACTOR, ARE TO BE SIZED FOR FILTER SIZES THAT ARE READILY AVAILABLE AT HOME SUPPLY STORES. CUSTOM SIZES ARE NOT PERMITTED. 16. ALL. BATH, KITCHEN, AND DRYER EXHAUST(S) SHALL BE VENTED TO THE EXTIERIOR. 17. ALL. BATH EXHAUST FANS SHALL BE DUCTED WITH 4" R-FIN. SLOPE AND FULLY SUPPORT ALL BATHROOM EXHAUST DUCTS TO AVOID ANY SNAGS IN THE DUCT AND TO ALLOW FOR PROPER DRAINAGE. TERMINATE AT SOFFIT WITH SCREENED GRILLE, UNLESS OTHERWISE NOTED. 18. PROVIDE BACKDRAFT DAMPERS FOR ALL EXHAUST FANS. 19. ALL. EXHAUST AIR DUCTS SHALL BE GALVANIZED SHEET METAL CONSTRUCTED AND INSTALLED IN ACCCPD,ANCE WITH AS RAE AND SMACNA STANDARDS.D 20. TESTING, ADJUSTING, AND BALANCING: THE CONTRACTOR SHALL BALANCE THE AIRFLOW DISTRIBUTION SYSTEMS, INCLUDING SUB MAINS, BRANCHES, AND TERMINALS TO QUANTITIES INDICATED ON THE UPDATED MANUAL J LOAD ANALYSIS (FOR RESIDENTIAL PROPERTIES) AND MANUAL J (COMMERCIAL PROPERTIES). 21, PROVIDE DRAW -THROUGH CONDENSATE TRAP AT EACH UNIT CONDENSATE (DRAIN. DEPTH SHALL BE AT LEAST 1-1/2 TIMES TH TOTAL S.P DROP OF THE UNIT. 22. PR VIDE PROGRAMMABLE SERIES 7-DAY THERMOSTAT. PRIOR TO ORDERING THE THERMOSTAT, THE CONTRACTOR SHALL VE IFY THAT THE SPECIFIED THERMOSTAT WILL OPERATE PROPERLY WITH THE PROPOSED AIR CONDITIONING EQUIPMENT. IF 'SUBSTITUTE IS REQUIRED, CONTRACTOR MUST SUBMIT PRODUCT INFORMATION TO ARCHITECT FOR PRODUCT APPROVAL. COORDINATE THERMOSTAT LOCATION WITH FURNITURE/EQUIPMENT LAYOUTS, WINDOWS AND DOOR SWINGS. THERMOSTAT MUST BE LOCATED AT 54" A.F.F AND NOT LOCATED ON AN OUTSIDE WALL. 23 SUPPLY AND RETURN AIR GRILLES SHALL MAINTAIN A MINIMUM DISTANCE OF S-0" FROM CEILINGS FANS. 24. ALL DUCT BRANCHES, PER ACCA MANUAL D, SHOULD INCLUDE DAMPERS FOR PROPER AIR FLOW AND BALANCING. 25. NO EQUIPMENT SHALL BE PURCHASED UNTIL REVIEW BY THE PROFESSIONAL_ OF RECORD, EVEN IF EQUIPMENT HAS BEEN SPECIFIED. 26. ANY VARIATION FROM THE DESIGN PRESENTED COULD AFFECT SYSTEM PERFORMANCE. 27, EQUIPMENT SHALL BEAR A U.L. OR OTHER RECOGNIZED LABEL, NAMEPLATES, WIRING DIAGRAMS, AND ENERGY RATINGS, AS APPLICABLE. 28. CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND ACCESSORIES SO THAT IT IS READILY ACCESSIBLE FOR SERVICING, TESTING, BALANCING AND REPLACEMENT. 29. CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE AGAINST DEFECTS INALL MATERIALS AND WORKMANSHIP FOR ONE (1) YEAR FROM ACCEPTANCE WITH FOUR ADDITIONAL YEARS OF WARRANTY ON COMPRESSORS. 30. PRIOR TO ACCEPTANCE BY THE OWNER, THE SYSTEMS SHALL BE TESTED AND BALANCED BY A AABC OR NEBB CERTIFIED T&B CONTRACTOR EXPERIENCED WITH THIS SYSTEM. THE CONTRACTOR SHALL CERTIFY THE TESTING AND BALANCING WITHIN +/- 10% OF DESIGN CFMS AND PROVIDE BALANCE TEST SHEETS. 31. ALL OUTSIDE DUCTWORK SHALL BE SHEET METAL. AND WRAPPED WITH 1-1/2" INSULATION. 32, AIR BALANCE TO BE PERFORMED BY THE AIR CONDITIONING CONTRACTOR TO THE OWNER'S COMFORT. ALL SUPPLY AND RETURN DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS AND LOCAL BUILDING CODES. 33, PROVIDE ALL CONTROLS, STARTERS, CONTROL WIRING, DISCONNECTS, AND OTHER ELECTRICAL EQUIPMENT AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. MECHANICAL CONTRACTOR IS TO COORDINATE WITH OTHER CONTRACTORS TO ENSURE THAT ALL ITEMS REQUIRED ARE INCLUDED IN 34. COORDINATE ALL POWER AND CONTROL WIRING WITH ELECTRICIAN. 35. FLEXIBLE DUCT, WHERE SHOWN, SHALL BE U L. CLASS 1 WITH 1-1/2" INSULATION WITH VAPOR; BARRIER. 36. SUPPLY AND RETURN DUCTWORK IS TO BE FIBERGLASS DUCTWORK, R-6, UNLESS SHOWN OTHERWISE. a ro m U PO Box 882032 Port Saint Lucie, FL 34988 Phone: 772-882-5700 www.ProCalcs.Net tom@procalcs.net License CAC1815254 i db No. Revision/Issue Date 1 Issue 10/21/19 For: Fieldstone Construction Inc PO BOX 20001 Palm Beach Gardens, FL 33420 Drawn BY: Sheet ZWM Checked By: TP Date: M— 1 10/21/19 Scale: As Shown IX O i a GENERAL NOTES: 1. All supply ducts are designed per ACCA Manual D. 2. All supply branches are designed according to ACCA Manual D for the highest CFM's required Heating or Cooling, for the room load per ACCA Manual J. 3. It is the installing HVAC Contractor's responsibility to install air volume dampers to adjust appropriate air flow accordingly. First Floor HVAC Plan PO Box 882032 Port Saint Lucie, FL 34988 Phone: 772-882-5700 www.ProCalcs.Net tom@procalcs.net License CAC 1815254 No. Revision/Issue Date 1 Issue 10/21/19 For: Fieldstone Construction Inc PO BOX 20001 Palm Beach Gardens, FL 33420 Drawn By: Sheet ZWM Checked By: TP L M_^ Date: 10/2I/19 Scale: As Shown A 0 F w Second Floor HVAC Plan 1 /4"=1'-01, GENERAL NOTES: 1. All supply ducts are designed per ACCA Manual D. 2. All supply branches are designed according to ACCA Manual D for the highest CFM's required Heating or Cooling, for the room load per ACCA Manual J. 3. It is the installing HVAC Contractor's responsibility to install air volume dampers to adjust appropriate air flow accordingly. a) w tf a) U fl 'We are the missing piece' PO Box 882032 Port Saint Lucie, FL 34988 Phone: 772-882-5700 www.ProCalcs.Net tom@procalcs.net License CAC 1815254 No. Revision/Issue Date 1 Issue 6/25/19 For: Fieldstone Construction Inc PO BOX 20001 Palm Beach Gardens, FL 33420 Drawn By: Sheet ZWM Checked By: TP M-3 Date: 10/21/19 Scale: As Shown F Ll CONDENSING UNIT BOLTED TO CONCRETE PAD TO WITHSTAND HURRICANE FORCE WINDS. AS PER FBCM 301.12 2" CONCRETE SLAB. TOP SLAB. PAD (TYPICAL) COND. UNIT ISOMODE PAD- 2" CONIC. PAD ................. 16 GA. HURRICANE STRAP 114" X 2" SELF -DRILLING SHEET METAL SCREW 3/8" X21/2" QUICK -BOLT' EXPANSION ANCHOR. (TYPICAL OF 4 ONE PER CORNER OF UNIT) NOTE: CONDENSING UNITS TO BE INSTALLED ABOVE FLOOD LEVEL CRITERIA. CONDENSING UNIT MOUNTING DETAIL NTS FLEXIBLE DUCT SAG NOT TO EXCEED 1/2" PER FOOT MAX.—., FLEX DUCT I I MAINTAIN RADIUS OF BEND TO NOT LESS THAN ONE DUCT DIAMETER Legend Please note not all symbols may apply. T T Supply grille y y ® Linear supply grille Sidewall supply grille y y ->N<- Return grille T T Linear return grille -m- Sidewall return grille ® Riser duct up/down SDD Smoke Duct Detector 0 Thermostat 0' Thermostat (for zoned systems) N Exhaust fan LZone damper .�\11Condensing I FLEX * PLACE AIR HANDLING UNIT IN THE ROOM SO THAT SERVICE TO THE UNIT & FILTER CAN BE ACCOMPLISHED. 20 GAUGE GALVANIZED DROP PAN UNDER ENTIRE UNIT W/ MOISTURE SENSOR DUCT SUPPORT VERTICAL AHU DETAIL NTS LOCKING ANT GALA STEEL ROD OR HANGER (TYP.) TO BEEXPOSED STRAP SUPPORTS PER SMACNASTANDARDS FLEXIBLE DUCT WITH SIDE TAKE -OFF FITTING INSULATION 8 WITH DAMPER, BELL MOUTH VAPOR BARRIER OR SHOETAP TYPE (SEE NOTE) 2" MIN. SUPPORT STRAP MAIN SUPPLY AIR 18" MAX. FROM DEVICE AND TIE TO DUCT, SEE PLANS FOR 5'-0" ON CENTER STRUCTURAL TYPE AND I SULATION SUPPORTS _ — 2" WIDE METAL BAND SUPPORT MAXIMUM ALLOWABLE LENGTH OF FLEX. DUCT 8 —0 I / 1-1/2" X 1-1/2" X 1/8" GALV. SQUARE TO ANGLE OR STRAP PER SMACNA ROUND CONNECT INNER DUCT WITH DRAWBAND ADAPTER AND SEAL WITH TAPE/MASTIC OUTERDUCT �r AT NECK CONNECTION PROVIDE THERMAL INSULATION BLANKET IF INSTALLED IN UNCONDITIONED SPACE FLEX DUCT SUSPENDED TYPE LOUVERED FACE CEILING DIFFUSER CEILING SYSTEM DUCTWORK SUPPORT DETAILS NITS TYPICAL DIFFIJSER DETAIL NTS EQUIPMENT SCHEDULE CU NUMBER CU-1 CU-2 NOMINAL TONNAGE 1 ton(s) 4 ton(s) MODEL 25VNA813AO030 25VNA848AO030 Z SEER/EER/HSPF 17.00/13.00/9.5 18.00/11.00/11.00 o9 CAPACITY TOTAL/SENS. 12334/9779 44214/33321 Z STAGES Variable Variable Z W G Z p RLA Voltage Phase MCA/MOP 10.3 208/230 460 L 23.9 208/230 JXJ 460 Single 1XIThree Single Three 13.5/20 31.4/50 v WEIGHT 139 218 AHU NUMBER AHU-1 AHU-1 AHU-MODEL FE4ANF002L++UI FE4ANF005L++UI STATIC PRESSURE 0.60 0.60 REFRIGERANT R-410A R-410A LOCATION Mech Room Mech Closet CFM 525 1225 FAN MOTOR HP - FLA 0/0 - 0.0 1 /2 - 4.3 cc J Z ELECTRIC HEATER Voltage Phase kW Model Number MCA/MOP DIMENSIONS H x W x D 208 Xj 230 Xj 4601 208 230 460 Single X1 Three I I Single JXJ Three 11.9 (208V) - 14.3 (230V) 6 (208V) - 8 (230V) KFCEH2401C05 KFCEH2501C08 XX/XX 208V - XX/XX 230V 00-0/0 x 00-0/0 x 00-0/0 45/50 208V - 59/60 230V 53-7/16 x 21-1/8 x 22-1/16 Q XREF a WEIGHT LINES SIZES NOTES: Carrier 000 0/0, 0/0 AHRI #: 9892838 128 7/8, 3/8 AHRI #: 9893287 GRILLE SCHEDULE Titus Series 250 Size Velocity FPM) 400 500 8 x 4 CFM 50 60 Throw (ft) 4-way 3-way 2-way 1-way 12 14 13 15 14 17 17 121 6 x 6 CFM 80 N/A Throw (ft) 4-way 3-way 2-way 1-way 13 N/A 14 N/A 15 N/A 18 N/A 8 x 6 CFM 105 N/A Throw (ft) 4-way 3-way 2-way 1 -way 14 N/A 15 N/A 12 N/A 15 N/A 10 x 6 8 x 8 CFM 1140 N/A Throw (ft) 4-way 3-way 2-way I -way 15 N/A 15 N/A 13 N/A 17 N/A CFM 250 N/A 10 x 10 Throw (ft) 4-way 3-way 2-way 1-way 17 N/A 18 N/A 20 N/A 120 1 N/A a) a) U a PO Box 882032 Port Saint Lucie, FL 34988 Phone: 772-882-5700 www.ProCalcs.Net tom@procalcs.net License CAC 1815254 No. Revision/Issue Date 1 Issue 10/21/19 For: Fieldstone Construction Inc PO BOX 20001 Palm Beach Gardens, FL 33420 Drawn By: ZWM Sheet Checked By: TIP m-4 Date: 10/21/19 Scale. As Shown rn 0 N U _J U m U 0 o_ L T 0- 0 Ar L Notes: {-xx.xx} Drop dimentions listed from Finished 1st floor elevation to top of pipe Nominal Drop angle 1/4" per V C = Cold Water Supply (Blue PEX) H = Hot Water Supply (Red PEX) V = Vent Route ALL pressurized water lines thru 2nd floor system Black Water / Foundath Pass Through, sleeved with 5" Sch 80 P Master Bath Drains to tl System Cleanout Port Black Water / Foundatic Pass Through, sleeved with 5" Sch 80 P Tie in for Future Pool Cabana Sink & Clean out port 43'-5" [. septic & drainfeld print ns to this point t` 00 ch � a •v QI oa � d "gz 7 G .: Uwr LN C� M Page: 20 Scale: 1' =1/4" (1:48) Notes: {-xx.xx} Drop dimentions listed from Finished 2nd floor elevation to top of pipe Nominal Drop angle 1/4" : V C = Cold Water Supply (Blue PEX) H = Hot Water Supply (Red PEX) V = Vent Route ALL pressurized water lines through 2nd floor system MI = Manifold distribution to Kitchen, Bathroom 2, Laundry, Garage Sink, Bar Sink, SW & NW Decks, Lanai M2 = Manifold distribution to Master Bath, Master, Bathroom 3, SE Deck & Equipment Pad Master Bath Draii(s f point to Lower lev9l r 4% MAY .uy Cd G u C a � Q � � H O a O i• '�' � of x .� Uwe 1�1 H r" en kn v-4 Page: 21. Scale: V =1/4" (1:48) Notes: 1) {-xx.xx} Drop dimentions listed from Finished 1st floor elevation to top of pipe 2) Benchmark Referance point 5.00" Below exisiting elevation Benchmark Approx 29.00" Below Str 3) Wet season water table 8.00" Below e: 4) Soil texture / Loading rate for system 5) Floor l finished elevation 48.00" abov 6) Dative elevation — 24.00" below street t�- 00 CT M C� � r Qa y � V� u C` M lf� .—r KR N CC3 1..4 Page: 22 Scale: 1' =114" (1:48) Notes: OF :Motion Sensor Security Light GFCI = Ground Fault indicator Circuit = Recessed Can Light (Screw In Bulbs) = Wall Sconce Light G = Smoke Detector = Heavy Light Fixture Q = Coax BNC & 12V = Carbon Monoxide Detector �— Cat 5 Data = Phone Jack GDO = Garage Door Opener Use code approved metal electrical boxes attached to concrete directly with a minimum of 2 concrete rated screws Trench ICF foam to a minimum of 2" deep for wireing routing, use expanding foam or code rated glue to attach wires with in the trench Conduit Routing to Pool equipment (Future expansion) w F ci G y U00 Qr Page: 23 Scale: V =114" (1:48) 40 Gal Water Open Deck { \ \ \ 1 1 I Master Bedroom ' / i (W1j M / f Master Bathroom 1 l ! l , f a 1 i \ a , 5 e / t Mai ® Libary fif rt , Elevator Rough in only Removable Floor Installed `♦ 1 1 cw `. u �`N Stairway Open to below,/ F -'):� ------------ 1 1 ' , - , r t \ I I— r 1 t 1 i r r / t -- _- Fa Room ; I 1 fill ` 1 I,/1 ) t 1 r r SD I 1 1 t I r 1 { { HVAC #1 Entry Air Handler t 24Wo t i Covered Deck Open Deck —� Pantry r ' r 1 40 Gal Water Heat / r 1- 1 1 " ` 1 \ t / 1 / j, Kittchen r/' Sink Oven ttr / �+ (� tON 7 / 24W i 1 bti t 1 I b♦ / r- \ / Bedroom Z Dining J Drver •1 24M L44mdry 1 I I Bedroom 3 -I-,_L---a_--- Open Deck I'` 00 ON �a C} o C CCi � rn 0 JC 4 U(10 CJ y OQ ) 5-i Page: 24 Scale: 1' =1/4" (1:48)