Loading...
HomeMy WebLinkAboutLetter; Subsurface InvestigationTr C 19 A KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 January 30, 2019 Spencer Gould Fieldstone Construction Inc. 1391 NE St. Lucie West Blvd., #306 Rscftzeo Port St. Lucie, FL 34986 APR 13 Re: 15371 Sky King Drive i. 7070 Pe t. L117 eDepart,,e county nr Fort Pierce, Florida KSM Project #: 190423-b Dear Mr. Gould: As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced site. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. A. Site Description: At the time of drilling, the site was fairly flat and heavily wooded with thick vegetation. Trails were cleared for our crew to access boring locations, � which were staked prior to our arrival. B. Project Description: A two-story single family residence (ICF construction), a hangar, a pool, and retaining wall are planned to be constructed on the site in three (3) phases. Loads from the structures will be transferred to the ground by conventional spread footings as required by grading. We estimate, based on information provided to us, that the maximum loads will be less than 3,000 pounds per linear foot along the wall foundations. Some additional site fill will be required to reach the desired grades. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 UP elk t KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO. BOX 78-1377 SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (661) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM®KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 15371 Sky King Drive -2- January 30, 2019 Port St. Lucie, Florida C. The scope of our study consisted of the following: 1. Performed Standard Penetration Test Borings in the proposed construction areas to estimate the subsoil relative density. 2. Measured the groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. D. Site Investigation: The site investigation program consisted of performing four (4) Standard Penetration Test borings (SPT), in the proposed construction area. The SPT borings were terminated at. depths of 2d feet below grade. The locations of the borings are indicated on the attached boring logs. The SPT borings were completed in accordance with procedures described in ASTM D- 1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 Tip OIL A16 IJ A KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND.TESTING, INC. MARTIN (772) 337-7755 RO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineedng.net MELBOURNE (321) 768-8468 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 15371 Sky King Drive -3- January 30, 2019 Port St. Lucie, Florida E. Engineering Evaluation and Conclusions: Based on the information obtained from this site investigation, we are pleased to offer the following evaluation: The boring logs indicate the subsurface soils consist mostly of fine-grained sand and fine-grained clayed sand. Shell fragments were also found in the borings at a depth of 9 to 13 feet below grade. "N" values recorded during the boring operation indicate the soil density is generally medium dense to very dense. Please refer to the soil boring logs for specific information relative to the soil description. Based on the existing soil conditions, the proposed structures can be supported on a shallow foundation system provided that the site is properly prepared. The following sections provide recommendations for the site preparation and foundation design. F. Site Preparation: The proposed construction areas and areas to be paved, plus a minimum margin of five feet beyond the proposed construction shall be stripped and grubbed of surface debris, including vegetation, roots and organic matter. Stumps shall be, removed entirely. Due to the heavy vegetation and trees on the site, over -excavation will be necessary in some areas to remove all roots and debris The building area should be graded level and proofrolled. Any soft yielding areas shall be excavated and replaced with clean compacted fill in 12 inch lifts. Sufficient passes should be made during compaction operations to produce a density no less than 95 percent of itsmodified dry Proctor value (ASTM D 1557) to a depth of two feet. After the exposed surface has been proofrolled, the building and pavement areas may be filled to the desired grades. The fill material shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Place structural fill in loose layers of 12 inches in thickness and compact each lift to at least 95 percent of its modified dry Proctor value. After excavating for the footings, the disturbed footing subgrade should be recompacted to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by making several passes with a relatively light -weight walk -behind vibratory sled or roller. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineedng.net MELBOURNE (321) 768-8486 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589=6469 15371 Sky King Drive -4- January 30, 2019 Port St. Lucie, Florida G.. Foundation: Provided that our recommendations for site preparation are followed, the proposed structure may be supported on conventional concrete slab, steel reinforced spread footings designed for an allowable soil bearing pressure of 2,500 pounds per square foot, or less. With the foundation properly designed and the site properly prepared, we anticipate total settlements less than % of an inch and differential settlement of less than % of an inch. The majority of the settlement should occur during construction. H. Retaining Walls: For retaining wall backfill that is not compacted the following soil parameters may be used in the retaining wall design: Backfill Soil Internal Angle of friction = 28 deg Coefficient of active earth pressure, Ka = 0.36 Coefficient of at rest earth pressure, Ko = 0.53 Coefficient of passive earth pressure, Kp = 2.77 For retaining wall backfill that is compacted to at least 95% of the modified Proctor maximum dry density, the following parameters may be used in the retaining wall design. Backfill Soil Internal Angle of friction = 32 deg Coefficient of active earth pressure, Ka = 0.31 Coefficient of at rest earth pressure, Ko = 0.47 Coefficient of passive earth pressure, Kp = 3.25 Note that an appropriate factor of safety should be applied to these parameters. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 1 Julie E. Keller, P.E.: 68366 U" c 1 l AYL KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 15371 Sky King Drive -5- January 30, 2019 Port St. Lucie, Florida I. Floor Slabs: A conventional slab -on -grade can be used in the "at grade" portion of the buildings. We recommend the disturbed subgrade below the floor slab be re -compacted to 95 percent of the modified Proctor maximum dry density (ASTM D 1557) prior to placement of the concrete. An estimated modulus of subgrade reaction of 150 pounds per cubic inch (pci) can be used for design of the slab -on -grade. We recommend that expansion or control joints be incorporated between the floor slab and column or wall footings in order to control settlement cracks. Control joints should also be incorporated in the slab at frequent intervals to control shrinkage cracks. A moisture barrier is recommended beneath the floor slab to prevent moisture migration from the underlying soil resulting in dampness of the slab. J. In -Place Density Tests: Make tests in randomly selected location in accordance with ASTM D 1557 as follows: MATERIALS a. Fill and Backfill b. Subgrade c. Continuous Wall Footings d. Individual Column Footings e. Floor Slabs TEST FREQUENCY 1 per lift per 2,000 sq. 1 per lift per 2,000 sq. 1 test every 50 lin. ft. 1 test at each footing 1 test per 500 sq. ft. ft. (1 foot lifts) ft. Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 TIP OIL t KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. ,r MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561).845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 15371 Sky King Drive -6- January 30, 2019 Port St. Lucie, Florida K. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. Environmental conditions, wetland delineation, water quality, and municipal requirements are not a part of this report. We are pleased to be of assistance to you on this phase of your project. When we may be q1tialftsforsgrvice to you or should you have any questions, please feel free to ., "� JEKIjtFos E-mail to: sg.fieldstone@gmaii.com Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 KSM Engineering & Testing BORING NUMBER SBA KSMP.O. Box 78-1377 PAGE 1 OF 1 Sebastian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Fieldstone Construction Inc. PROJECT NAME 15371 Sky King Drive PROJECT NUMBER 190423-b PROJECT LOCATION Port St. Lucie, Florida DATE STARTED 1/29/19 COMPLETED 1/29119 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Q AT TIME OF DRILLING 2.25 ft LOGGED BY SF/MH CHECKED BY JEK AT END OF DRILLING — NOTES North Section (Proposed House) AFTER DRILLING w o z A SPT N VALUE c� � r w Lu 20 40 60 80 CLO MATERIAL DESCRIPTION J z j p? Q a- uj y z Q PL 0 o a.Z �� m0z 20 40 60 80 �� uj a 0 ❑ FINES CONTENT (%) ❑ 0 20 40 60 80 Brown Sand with Traces of Roots Brown Sand 3-3-4 SS Brown Clayed Sand 3-5-8 :.......:.......:.......:....... :.. ;...: SS (13) :.......:....... :...... .:....... 5 • SS 8-11-15 Gray Clayed Sand (26) ............... SS 9-18-16 ( ) .......... .................:....... a 10 &: •:' Brown Sand with Some Shell Fragments ::.:• SS 11-14-17 (31) SS 16-18-21 r (39) (� Brown Sand with Lots of Shell 11-16-15 lu SS (31) ........... 03 Ss 21-29-27 $ °..; Gray Sand with Lots of Shell (56 ) W `�.. J:, : 4: SS 19-28-34 ....... :................ ..... :....... • (62) Y .0:.'ej SS 21-30-41 ...................................... 20 (71) Bottom of borehole at 20.0 feet. W Y to O Ql F C7 i m 5 0 r y H _Z W F O J a x m x V W H O w C7 KSM Engineering & Testing BORING NUMBER SB-2 Box 78-1377 KSMP.O. Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Fieldstone Construction Inc. PROJECT NAME 15371 Sky King Drive PROJECT NUMBER 190423-b PROJECT LOCATION Port St. Lucie, Florida DATE STARTED 1129119 COMPLETED 1/29/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample Z AT TIME OF DRILLING 2.33 ft LOGGED BY SF/MH CHECKED BY JEK AT END OF DRILLING NOTES East Section (Proposed Poop AFTER DRILLING - ° >- w 1 SPT N VALUE A Q W �w � w CL 20 40 60 80 PL MC LL I—r—� H� jj =C9 a. O MATERIAL DESCRIPTION g W > C f 'yE"D O¢ w y Z� o -' a� O 1r m O z } v 20 40 60 80 O < �` a 0 ❑ FINES CONTENT (%) 0 0 20 40 60 80 Dark Brown Sand with Traces of Roots Brown Sand 3-44 .:.... •.� • SZ (8) ...:...............:.......:....... Brown Clayed Sand 3-5-6 SS (11) 5 . •� �•• Gray Clayed Sand 12-18-19 SS (37) SS 13-15-15 : 10 Brown Sand with Shell Fragments 11-15-17 ......:......:......:.............. :d .b SS (32) ... ....... m .. .......:.......:. .....:.: .....:....... :. .{ Gray Sand with Lots of Shell :. SS 11-15-40 ... I? W 15 �'' ' (55) .................... .........:.... ..... ... ... ... W .................................. d: .. V-SS 27-36-50 :.......:.......:.......:...... 20 .. • : (86) Bottom of borehole at 20.0 feet. w m N H Q CmQ7 J y D r to 0 J a x m x v w r O w o r KSM Engineering & Testing BORING NUMBER SB-3 A ,� 1V1 Sebasti an, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax:(772)-589-6469 CLIENT Fieldstone Construction Inc. PROJECT NAME 15371 Sky King Drive PROJECT NUMBER 190423-b PROJECT LOCATION Port St. Lucie Florida DATE STARTED ' 1129/19 COMPLETED 1/29/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD _Split Spoon Sample Q AT TIME OF DRILLING 2.6711 LOGGED BY SF/MH CHECKED BY JEK AT ENO OF DRILLING -- NOTES South Section (Proposed Parking and Retaining Wall) AFTER DRILLING -- w a. o w A SPT N VALUE J W >- rn w n 20 40 60 80 n~ v =0 O MATERIAL DESCRIPTION try > 0 'yE'� 0 q w N z a PL MC LL }-- �--I p n 0 m 0> v" }" 20 40 60 80 c� z d L) w 0 z 0 W 0 FINES CONTENT (%) ❑ 0 o 20 40 60 80 Dark Gray Sand with Traces of Roots 1 Gray Sand 3-4-5 ......:............................... �FSS Brown Clayed Sand 4-6-8 :. : SS (14) :.......:.......:.......:....... 5 9SS 9-11-16 Gray Clayed Sand (27) ......:. SS 14-15-14 :.. (29) ...:.......:.......:....... 10 `• SS 11-18-15 (33) ....... :.. ..:.. n pV • y :.: •;: Brown Sand with Lots of Shell 21-32-30 n " o. SS (62) ....... :.. .. .. ; ...... i : •:. Gray Sand with Lots of Shell :• : �' SS 18-28-46 . Bottom of borehole at KSM Engineering & Testing BORING NUMBER SB-4 P.O. Box 78-1377 KSM Sebastian, FL 32978 PAGE 1 OF 1 Tel: (772)-589-0712 Fax: (772)-589-6469 CLIENT Fieldstone Construction Inc. PROJECT NAME 15371 Sky King Drive PROJECT NUMBER 190423-b PROJECT LOCATION Port St. Lucie, Florida DATE STARTED 1/29/19 COMPLETED 1/29119 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample :Z AT TIME OF DRILLING 2.50 ft LOGGED BY SF/MH CHECKED BY JEK AT END OF DRILLING — NOTES West Section (Proposed Hangar) AFTER DRILLING -- w o z A SPT N VALUE �..o:o U } u) W �~� w o- �� 20 40 60 80 PL MC LL a O MATERIAL DESCRIPTION -j M j d O�¢ m0z W N o'J OJ IL O� �" }" 20 40 60 80 W d o Q FINES CONTENT (%) ❑ rd Gray Sand with Traces of Roots ;'.•'IC7 Brown Clayed Sand Gray Clayed Sand with Traces of Shell Fragments ;a';.. • Gray Sand with Lots of Shell Bottom of t SS 4-5-5 ....................................... (10) ... ... :....... :....... .......:...... . SS 4-7-6 ....................................... (13) :.......:.......:......:....... SS 7-9-11 ....................................... :..............:....... (20) SS 8-8-9 ...................................... (17) ..............:......X--. SS 11-14-17 ...................................... :.... (31) ....... ..:..............:...... . ...................................... :....... :..:...... SS 21-28-37 (65) ....... .... . .......:.......:........... ...... ... .......:.......:.............. 29 41-39