Loading...
HomeMy WebLinkAboutProduct Approval (3) 7/8/2016 Florida Building Code Online i-�iy pariiivent'-e BCIS Home Log In % user Registration Hot Topl6 I Submit Surcharge i Stats&Fads Publications FBC Staff I BCIS Site Map ` Unks i Search `• pp Uu 'nes ` j`7 Professial Product Approval 1 W C. J (((��� USER:Public User Regulation, • t M product Aooroval Menu>Product or Aooliwticn Search>Application List>AppReation Detail � -• �•�---�- FL# FL7006-119 Application Type Revision Code Version 2014 Application Status Approved *Approved by DBPR,Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. Comments Archived ._ Product Manufacturer IKO Industries, Ltd Address/Phone/Small 40 Hansen Road South Brampton, NON-US L6W 3H4 (70B)496-2800 Ext 200 rmetz00 iota m pabay.rr,com Authorized Signature Robert Metz rmetzOD1@tampabay.rr.com Technical Representative Bob Metz Address/Phone/Email REMCO of Pinellas 456 Avila Circle NE Saint Petersburg,FL 33703 (727.) 776-5261 rmetz0010tampabay.rr.com Quality Assurance Representative Don Shaw Address/Phone/Email TKO Industries LTD 120 Hay Rd. Wilmington, DE 19808 (717) 579-6706 don.shaw@iko.com Category Roofing Subcategory Asphalt Shingles Compliance Method Certification Mark or Listing Certification Agency FM Approvals-CER Validated By Locke Bowden Validation Checklist- Hardcopy Received Referenced Standard and Year(of Standard) Standard Year ASTM D3161 modified to 110 mph. 2009 ASTM D3462 2009 ASTM D7158 Class H 2O08 ASTM E108 2007 Equivalence of Product Standards Certified By httpsYAvww.feridabdlding.org/pr/pr_app dtl.aspx?param=wGEVXQwtDgse7mYBd2b3KBmXtoZLhN\Xl22Npl70JlEp/o3d 913 7WO16 Florida Building Code Online Product Approval Method Method 1 Option A Date Submitted 06/28/2015 Date Validated 06/30/2015 Date Pending FBC Approval Date Approved 07/06/2015 Summary of Products FL# Model,Number or Name Description 70D6.1 Cambridge, Cambridge HD and CRC Laminated architectural fiberglass asphalt shingle Biltmore AR manufactured at IKO's Kankakee, IL; Hawkesbury, On Wilmington, DE;Sylacauga,AL and Toronto,Ont. plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM 0161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .i2df Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter-5 6 r Design Pressure:N/A 15.pdf Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 •odf f Quality Assurance Contract Expiration Date f� 12/31/2020 ! Installation Instructions FL7006 R9 tI IKO-133-02-01 Letter-Installation i I Instructions for FBC FL7006.odf I!I Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No A Evaluation Reports Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap fiberglass This is a 12"x 12"fiberglass asphalt shingle used to cover shingles the hip and/or ridge of an asphalt shingle roof system manufactured in Toronto,Ont. and Brampton,Ontario I Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- i Approved for use outside HVHZ:Yes 2015 .odf i Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter- 5 6 Design Pressure:N/A 15.Ddf Other: I FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 II 15 .Ddf i Quality Assurance Contract Expiration Date 112/31/2020 Installation Instructions FL7006 R9 II Hip and Ridge Car)Shingle Installation i Igstructions.pdf FL7006 R9 II IKO.133-02-01 Letter-Installation Instructions For FBC FL7006_pdf Verified By: Duc T Nguyen PE 65034 f Created by Independent Third Party: No 1 Evaluation Reports Created by Independent Third Party: 7006.3 Leading Edge Plus Asphalt Shingle One piece fiberglass asphalt shingle used as a�starter strip at Starter Strip the bottom of a roof system manufactured in Brampton and Hawkesbury,Ontario plants Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter_-ASTM 0161 letter- 4-15- Approved for use outside HVHZ:Yes 2015_,Ddf Impact Resistant:N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter- 5 6 Design Pressure: N/A 15 pd Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .Ddf Quality Assurance Contract Expiration Date 12/31/2020 i Installation Instructions FL7006 R9 II IKO-133-02-01 Letter- lnstallation Instructions for FBC F1,7006.pel FL7006 R9 II Roo fing-Prod ucts-Leadi no-Edge-Plus- Appli-cation-EN(1).pdf I Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports I Created by Independent Third Party: _I 7006.4 Marathon 25 AR, CRC Superglass �3 tab fiberglass asphalt shingle manufactured at IKO's https./Iwww.fioridabui lc i ng.org/prlpr_app_dill.aspx?param=wGEVXQwtDgse7mYBd2b3K6mXtoZLhNVX122N p170J 1 E%3d 2/3 7/8/2016 Florida Building Cade Online M25AR Brampton,Ontario, Hawkesbury Ont.,Toronto,Ont.; j Sylacauga,AL and Kanakakee,IL plants I Limits of Use Certification Agency Certificate Approved for use in HVHZ:Yes FL7006 R9 C CAC FM Letter-ASTM d3161 letter- 4-15- Approved for use outside HVHZ:Yes 2015 .Ddf Impact Resistant: N/A FL7006 R9 C CAC FM Letter-ASTM d3462 letter- 56 Design Pressure:N/A 15oddf- Other: FL7006 R9 C CAC FM Letter-ASTM E 108 letter- 5 3 15 .Ddf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions I! FL7006 R9 If IKO-133-02-01 Letter-Installation Instructions for FBC FL7006.pdf Verified By: Duc T Nguyen 65034 1 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: ' Bacit Poert Contact Us::2601 Blair Stone Road.'Iallahassee FL 32399 Phone:850-487-1824 The State of Florida Is an AA/EEO employer.Copyright 2007-2013 state of Florida.::Privacy Statement::Accessibility Statement::Refund Statement Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records request,do not send electraNc mall to this entity,instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.1395.-Pursuant to Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address If they Have one:The smalls provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To determine If you are a licensee under Chapter 455,F.S.,please click her. Product Approval Accepts: Cr0dit Card' . https://www.foridabLilcUng.org/pr/pr app dtl.aspx?param=wGEVXQwtDgse7mYBd2b3KBmXtoZLhNVX122Npl7OJlE%3d 3/3 FM Approvals FM Approvals 3PMZ*<lt'ro 1151 Boston-Providence Turnpike P.O.Box 9102 Norwood,MA 02062 USA T:781 762 4300 F:781 762 9375 www.fmapprovals.com May 3,2015 Mr.Donald Shaw IKO Industries,Ltd.' 40 Hansen Road South Brampton,Ontario L6W 3H4 Canada Customer ID: 1000000686 Subject: IKO Industries Ltd.'s FM Approved asphalt roof shingles Dear Mr. Shaw, This letter is being written following in regards to your recent inquire regarding verification of the ASTM D3161 testing of IKO Industries Ltd's asphalt roof shingles. IKO's shingles that are FM Approved have been tested in accordance with ASTM D3161(reports 3040947 and 3038510). FM Approvedproducts: : Iflltli5fntes;ltl ;= '::':_ `,: Crowne Slate,Cambridge;Hip&Ridge 12,Marathon 25 AR,Marathon Ultra AR,Cambridge IR,Leading Edge Plus,Cambridge HD,Marathon . 25,Hip&Ridge Plus,Dynasty with ArmourZone Canrijof:Cuirpratgri Inca;::.. •: Biltmore,Hip&Ridge 12(CRC),Superglass 25 M AR,Superglass Ultra AR, CRC Hip&Ridge Plus Please be advised that shingles noted above tested to previous versions of ASTM D3161 continue to meet the test criteria of the current version of ASTM D3161. If you have any questions please do not hesitate to contact me. Very truly yours, David L.Alves Phillip J.Smith Senior Engineer-Materials Group Principal Engineer-AVP FM Approvals FM Approvals 1151 Boston-Providence Tunpike Norwood,MA 02062 T: 781 255 4856 E:david.alves@fniapprovals:com �X C E MOVED APPROVED CONSTRUCTION MATERIALS TECHNOLOGIES March 30,2015 IKO Industries, Ltd 1211 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2014 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) 'IKO Shingle Application Instructions—3-Tab Shingles (EN-3Tab Appins_BAGXEFS-2012-11 reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions (EN-Laminated_Appins_BTTEFS-2012-04_reformatted 2013-02-rev07/13-Florida) 3) IKO Hip and Ridge 12 Application Instructions (EN-HipandRidgel2_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tri-2012-06—reformatted 2013-03) 5) ASTM D3161 Test Report(FM Approvals Project No.3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict, these instructions shall govern. Statement of Independence:PRI Construction Materials Technologies and/or Duc T.Nguyen, FL P.E.do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. Signed: , �C �;��,,�' Signed: Brad Grzybo sl(l Duc T.N u en Managing Vrector Florida R ered Professional Engine r P.E.Number:65034 Date: April 30, 2015 Date: April 30"2015 Attachments: A) IKO Shingle Application Instructions-3-Tab B)IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions IKO-133-02-01 PRI Construction Materials Technologies,LI.C.6412 8adger Drive Tampa,FL 33610 Tel:813-621-5777 Fax:813.621-5840 e-mail:materialstesting@pricmt,com WebSita:htlpJ&w .pricmtcom IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161, Class F—IKO Marathon 25 AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves;with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed 6-1/8"above the butt edge, approx. 1"and 13"from each end and 1/2"above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. . NAILING ON STEEP SLOPES: For steep slopes of 21"per foot(60°)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-518". STEEP SLOPES •--Z�SEALWG STR{P NAILS NAILS DO NOT NAIL INTO dR ABOVE THE SEALING STRIP PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel;813-621-5777 Fax:813.6215840 e-mau:materiaistesung@pricmt.com WebSite:httP:Uwvrw.Pricmt.com IKO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F—Cambridge,Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2014 FBC. UNDERLAYMENT:Applied in accordance with building code requirements.For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping each preceding course by 19"or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 41 per foot or greater, cover the deck with one ply of underayment laid parallel to the eaves,with 2"horizontal laps and 4"end laps. Apply metal drip edges on top of.any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING:Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least 3/8"diameter heads,long enough to penetrate through plywood or 3/4"into boards. Use 4 nails'per shingle placed in the nail line 7-3/8" below the top edge,approx. 1"and 13"in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(60°)or more,use 6 nails per shingle placed as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each .shingle at time of application with three 1"diameter(approx.size and thickness of a quarter)spots of asphalt plastic cement placed under the shingle 2"above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 54/8". NAILING-STEEP SLOPES APPOCATlQN, t.tse six nails as shown. • 7 37f1" —► t. .t. i" y it ► 4r ! -� I ^► �_ • :NAIL LINE l ` Ea NAILS CEMENT PROPERAPPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OF.THE SHINGLI= PRI Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813.621-5777 Fax:813-621-5840 a-rnag:matefialst8sting@p6cmt.com WebSite:httpJlvrww.PdCMLcam IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F—IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 51/8, (130 mm)exposure. (For a neater appearance the top of each side of each piece has been factorytrimmed on a 1"(25 mm)taper(see drawing).Bend each piece overthe hip or ridge,and nail 5 5/8" (143 mm)above the butt edge 1" (25 mm) in from each edge,exposing each piece 5 1/8"(130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note:To obtain a three-dimensional effect,(which is recommended,but not required),apply hip and ridge shingles double thickness bystacking 2 pieces on top of one another,the lower piece extending about 3/4"(19 mm)further than the top piece(see diagram).The final shingle should be set in cement,and the exposed nail heads of the final shingle should be covered with cement.Prior to application in cold weather,storing the shingles in'a heated area will allow for easier bending. NOTE:SHINGLES MUST BE APPLIED PROPERLY.THEYARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY,AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS.WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POORAPPLICATION OR FAILURE-TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS.REVIEW ALL APPLICABLE BUILDING CODES,-MINIMUM PROPERTY STANDARDS,AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. (e3 mm7 I � � TaP4Rarr 6 3B' (1n:mml PRl Construction Materials Technologies,LLC.6412 Badger Drive Tampa,FL 33610 Tel:813-6215TR Fax 813-621.5840 e-mail:materialstesting&rlcmtcom WebSito:http,./Afiww.p6cmt.com C IKO Installation Instructions for Asphalt Shingles Page 5 of 5 IKO Leading Edge Plus Application Instructions (ASTM D3161, Class F—IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN. CONDUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT,THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection,valley flashings, or drip edges to roof deck as required. 2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwise for separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up,with the factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with nails located 3"to 4"(75 mrh to 100 mm)from the eave edge and-1"(25 mm)in from each end. 4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang the rake edge by a nominal 1/4"(6 mm)minimum. Fasten the shingle to the roof deck with fasteners located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end. 5. Repeat Steps 3—4 for the right lower comer of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge,with at least 3/8"(9 mm)diameter heads, long enough to penetrate through plywood or 3/4"(20 mm) into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to 100 mm)from the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end. 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and help keep them from lifting in high winds. PRI Construction Materials Technologies,LLC,6412 Badger Drive Tampa,FL 3361 D Tel:813.6215777 Fax:813.621-5840 a-mall:materialstesog@pricmtcom WebSite: dplIvAmpricmLcom