Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BELAND- MANUAL J
v-7 wrlgn1 project Summary Jo Date AHU 1 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM For: EDDY AND CONNIE BELAND 7964 PLANTATION LAKES DRIVE, PORT ST LUCIE, FL Notes: Weather: Fort Pierce, FL, US Winter Design Conditions Outside db 42 °F Inside db 70 °F Design TD 28 °F Heating Summary Structure 31147 Btuh Ducts 7255 Btuh Central vent (0 cfm) 0 Btuh (none) Humidification 0 Btuh Piping 0 Btuh Equipment load 38401 Btuh Infiltration Method Construction quality Fireplaces Simplified Average 0 Heating Cooling Area (ft2) 2336 2336 Volume (ft3) 26736 26736 Air changes/hour 0.24 0.13 Equiv. AVF (cfm) 108 58 Heating Equipment Summary Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 100 EFF 11.9 kW 40665 Btuh 26 °F 1400 cfm 0.036 cfm/Btuh 1.00 in H2O Nov 05, 2020 Summer Design Conditions Outside db 90 °F Inside db 75 °F Design TD 15 °F Daily range M Relative humidity 50 % Moisture difference 61 gr/lb Sensible Cooling Equipment Load Sizing Structure 22868 Btuh Ducts 8004 Btuh Central vent (0 cfm) 0 Btuh (none) Blower 0 Btuh Use manufacturer's data n Rate/swing multiplier 0.95 Equipmenf sensible load 29329 Btuh Latent Cooling Equipment Load Sizing Structure 4414 Btuh Ducts 2891 Btuh Central vent (0 cfm) 0 Btuh (none) Equipment latent load 7305 Btuh Equipment Total Load (Sen+Lat) 36633 Btuh Req. total capacity at 0.70 SHR 3.5 ton Cooling Equipment Summary Make Carrier Trade CARRIER Cond CA16NA04200GOBO Coil FX4DNF049L AHRI ref 202024777 Efficiency 13.0 EER, 16 SEER Sensible cooling 29400 Btuh Latent cooling 12600 Btuh Total cooling 42000 Btuh Actual air flow 1400 cfm Air flow factor 0.045 cfm/Btuh Static pressure 1.00 in H2O Load sensible heat ratio 0.81 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 30ft—ord- W rigi 2020-Nov-05 11:23:58 _ Right -Suite® Universal 2019 19.0.08 RSU08101 Page 1 E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N v-7 wrlgn1 project Summary Jo Date AHU 2 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM For: EDDY AND CONNIE BELAND 7964 PLANTATION LAKES DRIVE, PORT ST LUCIE, FL Notes: Weather: Fort Pierce, FL, US Winter Design Conditions Outside db 42 °F Inside db 70 °F Design TD 28 °F Heating Summary Structure 15881 Btuh Ducts 2272 Btuh Central vent (0 cfm) 0 Btuh (none) Humidification 0 Btuh Piping 0 Btuh Equipment load 18154 Btuh Infiltration Method Construction quality Fireplaces Simplified Average 0 Heating Cooling Area (ft2) 932 932 Volume (ft3) 10738 10738 Air changes/hour 0.37 0.20 Equiv. AVF (cfm) 67 36 Heating Equipment Summary Make Trade Model AHRI ref Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 100 EFF 5.3 kW 18005 Btuh 28 °F 590 cfm 0.033 cfm/Btuh 1.00 in H2O Nov 05, 2020 Summer Design Conditions Outside db 90 °F Inside db 75 °F Design TD 15 °F Daily range M Relative humidity 50 % Moisture difference 61 gr/lb Sensible Cooling Equipment Load Sizing Structure 10375 Btuh Ducts 3197 Btuh Central vent (0 cfm) 0 Btuh (none) Blower 0 Btuh Use manufacturer's data n Rate/swing multiplier 0.95 Equipmenf sensible load 12894 Btuh Latent Cooling Equipment Load Sizing Structure 2000 Btuh Ducts 832 Btuh Central vent (0 cfm) 0 Btuh (none) Equipment latent load 2831 Btuh Equipment Total Load (Sen+Lat) 15725 Btuh Req. total capacity at 0.70 SHR 1.5 ton Cooling Equipment Summary Make Carrier Trade CARRIER Cond CA16NW01800GOA0 Coil FX4DNF019L AHRI ref 9200856 Efficiency 13.5 EER, 16 SEER Sensible cooling 12390 Btuh Latent cooling 5310 Btuh Total cooling 17700 Btuh Actual air flow 590 cfm Air flow factor 0.043 cfm/Btuh Static pressure 1.00 in H2O Load sensible heat ratio 0.83 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 30ft—ord- W rigi 2020-Nov-05 11:23:58 _ Right -Suite® Universal 2019 19.0.08 RSU08101 Page 2 E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name AHU 1 GREAT RM 2 Exposed wall 170.0 ft 29.0 ft 3 Room height 11.4 ft 12.0 ft heat/cool 4 Room dimensions 1.0 x 493.0 ft 5 Room area 2336.0 ft2 493.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 266 209 1069 664 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 12 0 222 172 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 24 0 444 343 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 21 0 394 305 0 0 0 0 11 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 334 198 1013 629 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 36 5 665 1009 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 40 23 739 840 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 60 35 1109 1260 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0,183 s 5.12 3.18 652 512 2623 1630 60 36 184 115 2 glazing, clr low-e 0.660 s 18.48 14.30 8 8 148 114 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 108 108 1996 1545 0 0 0 0 I;�CCCII 2 glazing, clr low-e 0.660 s 18.48 10.51 24 24 444 252 24 24 444 252 W 13AB-Ofcs 0.183 w 5.12 3.18 690 446 2285 1420 288 104 533 331 2 glazing, clr low-e 0.660 w 18.48 28.04 36 5 665 1009 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 24 3 444 673 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 24 24 444 252 24 24 444 252 2 glazing, clr low-e 0.660 w 18.48 10.51 160 160 2957 1682 160 160 2957 1682 C 16X19-Otd 0.408 1.59 1.13 2336 2336 3704 2645 493 493 782 558 F 22A-tph 1.358 38.02 0.00 2336 170 6464 0 493 29 1103 0 6 c) AED excursion 2219 2428 Envelope loss/gain 27828 18666 6446 5619 12 a) Infiltration 3319 953 595 171 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 3250 0 Subtotal (lines 6 to 13) 31147 22868 7040 5790 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 31147 22868 7040 5790 15 Duct loads 23% 35% 7255 8004 23% 35% 1640 2026 Total room load 38401 30872 8680 7816 Air required (cfm) 14001 1400 316 354 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 1 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name BATH 4 OFFICE 2 Exposed wall 14.0 ft 36.0 ft 3 Room height 10.0 ft heat/cool 12.0 ft heat/cool 4 Room dimensions 1.0 x 59.5 ft 1.0 x 271.0 ft 5 Room area 59.5 ft2 271.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 70 49 249 155 36 24 123 76 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 12 0 222 172 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 21 0 394 305 0 0 0 0 1 1 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 0.183 s 5.12 3.30 0 0 0 0 192 150 790 490 2 glazing, clr low-e 2 glazing, 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 36 36 665 515 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 70 70 359 223 204 168 861 535 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 36 5 665 1009 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 60 60 94 67 271 271 430 307 F 22A-tph 1.358 38.02 0.00 60 14 532 0 271 36 1369 0 6 c) AED excursion -39 198 Envelope loss/gain 1629 712 5134 3309 12 a) Infiltration 239 69 739 212 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1868 780 5873 3521 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 132 51 14 Subtotal 1868 780 6005 3573 15 Duct loads 23% 35% 435 273 23% 35% 1399 1250 FFTotal room load 2303 1053 7403 4823 Air required (cfm) 84 48 270 219 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 2 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name OFFICE CLST BEDROOM 3 2 Exposed wall 2.0 ft 18.0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heat/cool 4 Room dimensions 1.0 x 28.0 ft 1.0 x 222.0 ft 5 Room area 28.0 ft2 222.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 20 20 102 64 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0,183 s 5.12 3.18 20 20 102 64 140 104 533 331 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 36 36 665 515 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 20 20 102 64 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 28 28 44 32 222 222 352 251 F 22A-tph 1.358 38.02 0.00 28 2 76 0 222 18 684 0 6 c) AED excursion -5 -95 Envelope loss/gain 223 90 2440 1130 12 a) Infiltration 34 10 308 88 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 700 Subtotal (lines 6 to 13) 257 100 2747 1918 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution -257 -100 241 90 14 Subtotal 0 0 2988 2008 15 Duct loads 23% 35% 0 0 23% 35% 696 703 FFTotal room load 0 0 3684 2711 Air required (cfm) 0 0 134 123 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 3 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name CLST 3 BATH 2 2 Exposed wall 2.0 ft 7.0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heat/cool 4 Room dimensions 2.0 x 7.0 ft 7.0 x 15.0 ft 5 Room area 14.0 ft2 105.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0,183 s 5.12 3.18 20 20 102 64 70 62 318 197 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 8 8 148 114 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 14 14 22 16 105 105 166 119 F 22A-tph 1.358 38.02 0.00 14 2 76 0 105 7 266 0 6 c) AED excursion 4 -22 Envelope loss/gain 201 75 898 409 12 a) Infiltration 34 10 120 34 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 235 85 1018 443 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution -235 -85 119 49 14 Subtotal 0 0 1137 492 15 Duct loads 23% 35% 0 0 23% 35% 265 172 Total room load 0 0 1402 664 Air required (cfm) 0 0 51 30 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 4 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name BEDROOM 2 CLST 2 2 Exposed wall 15.0 ft 0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heat/cool 4 Room dimensions 1.0 x 205.0 ft 10.0 x 2.0 ft 5 Room area 205.0 ft2 20.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 0.183 s 5.12 3.30 150 114 584 363 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 36 36 665 515 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 W 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 205 205 325 232 20 20 32 23 F 22A-tph 1.358 38.02 0.00 205 15 570 0 20 0 0 0 6 c) AED excursion -89 -1 Envelope loss/gain 2145 1021 32 22 12 a) Infiltration 256 74 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 700 0 Subtotal (lines 6 to 13) 2401 1795 32 22 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 29 20 -32 -22 14 Subtotal 2430 1815 0 0 15 Duct loads 23% 35% 566 635 23% 35% 0 0 Total room load 2997 2450 0 0 Air required (cfm) 109 111 0 0 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 5 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name HALL LAUNDRY 2 Exposed wall 0 ft 10.0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heat/cool 4 Room dimensions 12.0 x 4.0 ft 10.0 x 10.0 ft 5 Room area 48.0 ft2 100.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-Ofcs 0.183 n 5.12 3.18 0 0 0 0 100 100 512 318 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 0.183 s 5.12 3.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 48 48 76 54 100 100 159 113 F 22A-tph 1.358 38.02 0.00 48 0 0 0 100 10 380 0 6 c) AED excursion -3 -23 Envelope loss/gain 76 52 1051 409 12 a) Infiltration 0 0 171 49 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 76 52 1222 458 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution -76 -52 24 16 14 Subtotal 0 0 1246 474 15 Duct loads 23% 35% 0 0 23% 35% 290 166 FFTotal room load 7 0 0 1536 640 Air required (cfm) 0 0 56 29 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 6 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name BATH 3 KITCHEN/DINETTE 2 Exposed wall 0 ft 14.0 ft 3 Room height 10.0 ft heat/cool 12.0 ft heat/cool 4 Room dimensions 12.0 x 6.0 ft 1.0 x 422.5 ft 5 Room area 72.0 ft2 422.5 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 0 0 0 0 60 36 184 115 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 24 0 444 343 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 0.183 s 5.12 3.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 108 84 430 267 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 24 3 444 673 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 72 72 114 82 423 423 670 478 F 22A-tph 1.358 38.02 0.00 72 0 0 0 423 14 532 0 6 c) AED excursion -4 88 Envelope loss/gain 114 78 2704 1965 12 a) Infiltration 0 0 287 82 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 1500 Subtotal (lines 6 to 13) 114 78 2991 3548 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 29 19 26 13 14 Subtotal 1431 97 3018 3561 15 Duct loads 23% 35% 33 34 23% 35% 703 1246 Total room load 176 131 3720 4807 Air required (cfm) 6 6 136 218 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 7 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 1 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name DINING RM FOYER 2 Exposed wall 12.0 ft 11.0 ft 3 Room height 13.3 ft heat/cool 14,0 ft heat/cool 4 Room dimensions 12.0 x 12.0 ft 12.0 x 11.0 ft 5 Room area 144.0 ft2 132.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 18.48 14.30 0 0 0 0 0 0 0 0 1 1 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 160 124 633 394 154 54 277 172 2 glazing, clr low-e 0.660 a 18.48 28.04 36 5 665 1009 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 40 23 739 840 2 glazing, clr low-e 0.660 a 18.48 21.00 0 0 0 0 60 35 1109 1260 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 0.183 s 5.12 3.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 14.30 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 18.48 10.51 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 10.51 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 144 144 228 163 132 132 209 149 F 22A-tph 1.358 38.02 0.00 144 12 456 0 132 11 418 0 6 c) AED excursion -94 -118 Envelope loss/gain 1983 1472 2752 2303 12 a) Infiltration 273 78 263 76 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 350 0 Subtotal (lines 6 to 13) 2256 1900 3016 2379 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 2256 1900 3016 2379 15 Duct loads 23% 35% 525 665 23% 35% 702 833 FFTotal room load 7 2782 2565 3718 3212 Air required (cfm) 101 116 1 136 146 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 8 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 2 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name AHU 2 MASTER BEDROOM 2 Exposed wall 103.0 ft 38.0 ft 3 Room height 11.5 ft 12.0 ft heat/cool 4 Room dimensions 1.0 x 403.0 ft 5 Room area 932.0 ft2 403.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 530 522 2675 1662 228 228 1168 726 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 1 1 2 glazing, clr low-e 0.660 n 18.48 12.85 8 0 148 103 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 328 268 1375 854 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 36 5 665 1009 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 23.80 24 3 444 571 0 0 0 0 V)/ 0.183 s 5.00 3.00 120 120 615 382 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 I;�CCCII 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 W 13AB-Ofcs 0.183 w 5.12 3.18 228 128 656 408 228 128 656 408 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 23.80 36 5 665 857 36 5 665 857 2 glazing, clr low-e 0.660 w 18.48 24.20 64 6 1183 1549 64 6 1183 1549 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 932 932 1478 1055 403 403 639 456 F 22A-tph 1.358 38.02 0.00 932 103 3916 0 403 38 1445 0 6 c) AED excursion 583 921 Envelope loss/gain 13819 9033 5756 4917 12 a) Infiltration 2062 592 780 224 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 750 0 Subtotal (lines 6 to 13) 15881 10375 6536 5141 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 15881 10375 6536 5141 15 Duct loads 14% 31% 2272 3197 14% 31% 935 1584 FFTotal room load 18154 13572 7471 6725 Air required (cfm) 5901 5901 243 292 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 9 '� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 2 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name WIC 1 M BATH 2 Exposed wall 11.0 ft 43.0 ft 3 Room height 10.0 ft heat/cool 12.0 ft heat/cool 4 Room dimensions 11.0 x 7.0 ft 1.0 x 224.0 ft 5 Room area 77.0 ft2 224.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 110 110 564 350 192 184 943 586 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 18.48 12.85 0 0 0 0 8 0 148 103 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 204 180 922 573 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 23.80 0 0 0 0 24 3 444 571 0.183 s 5.00 3.00 0 0 0 0 120 120 615 382 2 glazing, clr low-e 2 glazing, 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 23.80 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 24.20 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 77 77 122 87 224 224 355 254 F 22A-tph 1.358 38.02 0.00 77 11 418 0 224 43 1635 0 6 c) AED excursion -30 -165 Envelope loss/gain 1104 408 5062 2303 12 a) Infiltration 188 54 882 253 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1292 462 5944 2556 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1292 462 5944 2556 15 Duct loads 14% 31% 1851 142 14% 31% 850 788 Total room load 1477 604 6794 3344 Air required (cfm) 1 148 26 1 2211 145 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 10 �� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 2 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name WASH RM WIC 2 2 Exposed wall 0 ft 0 ft 3 Room height 10.0 ft heat/cool 10.0 ft heat/cool 4 Room dimensions 7.0 x 6.0 ft 9.0 x 6.0 ft 5 Room area 42.0 ft2 54.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-Ofcs 0.183 n 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 18.48 12.85 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 23.80 0 0 0 0 0 0 0 0 0.183 s 5.00 3.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 W 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 23.80 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 24.20 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 42 42 67 48 54 54 86 61 F 22A-tph 1.358 38.02 0.00 42 0 0 0 54 0 0 0 6 c) AED excursion -27 -4 Envelope loss/gain 67 20 86 57 12 a) Infiltration 0 0 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 400 0 Subtotal (lines 6 to 13) 67 420 86 57 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 67 420 86 57 15 Duct loads 14% 31% 10 130 14% 31% 12 18 FF Total room load 76 550 98 75 Air required (cfm) 21 24F7T 3 3 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 11 �� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t` .f wIII I,y�1111 Right-J® Worksheet Job: AHU 2 Date: Nov 05, 2020 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM 1 Room name DEN DEN CLST 2 Exposed wall 11.0 ft 0 ft 3 Room height 11.3 ft heat/cool 10.0 ft heat/cool 4 Room dimensions 1.0 x 126.0 ft 2.0 x 3.0 ft 5 Room area 126.0 ft2 6.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft� °F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 13AB-0fcs 0.183 n 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 n 0.00 0.00 0 0 0 0 0 0 0 0 11 2 glazing, clr low-e 0.660 n 18.48 12.85 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 e 5.12 3.18 124 88 452 281 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 28.04 36 5 665 1009 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 a 18.48 23.80 0 0 0 0 0 0 0 0 0.183 s 5.00 3.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 2 glazing, 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 s 0.00 0.00 0 0 0 0 0 0 0 0 13AB-Ofcs 0.183 w 5.12 3.18 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 23.80 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 18.48 24.20 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 2 glazing, clr low-e 0.660 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16X19-Otd 0.408 1.59 1.13 126 126 200 143 6 6 10 7 F 22A-tph 1.358 38.02 0.00 126 11 418 0 6 0 0 0 6 c) AED excursion -112 0 Envelope loss/gain 1736 1321 10 6 12 a) Infiltration 212 61 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 350 0 Subtotal (lines 6 to 13) 1948 1732 10 6 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 10 6 -10 -6 14 Subtotal 1958 1739 0 0 15 Duct loads 14% 31% 280 536 14% 31% 0 0 Total room load 2238 2274 0 0 Air required (cfm) 73 99 01 0 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. wrigl 2020-Nov-0511:23:58 Right -Suite® Universal 2019 19.0.08 RSU08101 Page 12 �� E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N t-T wrignI Duct System Summary Job: Date AHU 1 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM For: EDDY AND CONNIE BELAND 7964 PLANTATION LAKES DRIVE, PORT ST LUCIE, FL External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 1.00 in H2O 0 in H2O 1.00 in H2O 0.500 / 0.500 in H 20 1.000 i n/ 100ft 1400 cfm Cooling 1.00 in H2O 0 in H2O 1.00 in H2O 0.500 / 0.500 in H 20 1.000 i n/ 100ft 1400 cfm 193 ft Nov 05, 2020 Name Design (Btuh) Htg (cfm) Clg (cfm) Design FIR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk BATH 2 h 1402 51 30 1.000 5.0 Ox 0 VIFx 25.6 115.0 st 1 BATH 3 h 176 6 6 1.000 4.0 Ox 0 VIFx 22.3 115.0 st 1 BATH 4 h 2303 84 48 1.000 6.0 Ox 0 VIFx 54.2 135.0 st5 BEDROOM 2 c 2450 109 111 1.000 7.0 Ox0 VIFx 25.9 115.0 st1 BEDROOM 3 h 3684 134 123 1.000 7.0 Ox0 VIFx 38.6 115.0 st2 DINING RM c 2565 101 116 1.000 7.0 Ox0 VIFx 53.0 135.0 st4 FOYER c 3212 136 146 1.000 8.0 Ox0 VIFx 51.0 135.0 st4 GREAT RM c 3908 158 177 1.000 8.0 Ox 0 VIFx 55.9 135.0 st4 GREAT RM-A c 3908 158 177 1.000 8.0 Ox 0 VIFx 50.2 135.0 st4 KITCHEN/DINETTE c 2403 68 109 1.000 7.0 Ox0 VIFx 35.8 115.0 st2 KITCHEN/DINETTE-A c 2403 68 109 1.000 7.0 Ox0 VIFx 44.7 115.0 st2 LAUNDRY h 1536 56 29 1.000 5.0 Ox0 VIFx 25.1 115.0 st1 OFFICE h 3702 135 109 1.000 7.0 Ox0 VIFx 58.3 135.0 st5 OFFICE -A h 3702 135 109 1.000 7.0 Ox0 VIFx 51.0 135.0 st5 Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk st5 Peak AVF 354 267 1.000 801 9.0 0 x 0 VinlFlx st2 st2 Peak AVF 624 607 1.000 794 12.0 0 x 0 VinlFlx st4 Peak AVF 553 616 1.000 785 12.0 0 x 0 VinlFlx st1 st1 Peak AVF 776 793 1.000 741 14.0 0 x 0 VinlFlx - -- ift-f"1111111- wrigl 2020-Nov-05 11:24:07 .,..,�.,q,,.H.� Right -Suite® Universal 2019 19.0.08 RSU08101 Page 1 �L ✓ E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rb2 Ox0 1400 1400 0 0 0 0 Ox 0 VIFx - -- )ft-l""11111F wrigl Right -Suite® Universal 2019 19.0.08 RSU08101 �� ✓ E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N 001*401105MIM S I wz I IYA Page 2 t—T wrignI Duct System Summary Job: Date AHU 2 By: QUICK CALCS, INC. 317 ST LUCIE LANE, FORT PIERCE, FL 34946 Phone: 772-466-6799 Fax: 772-466-6796 Email: QUICKCALCS@AOL.COM For: EDDY AND CONNIE BELAND 7964 PLANTATION LAKES DRIVE, PORT ST LUCIE, FL External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 1.00 in H2O 0 in H2O 1.00 in H2O 0.500 / 0.500 in H 20 1.000 i n/ 100ft 590 cfm Cooling 1.00 in H2O 0 in H2O 1.00 in H2O 0.500 / 0.500 in H 20 1.000 i n/ 100ft 590 cfm 206 ft Nov 05, 2020 Name Design (Btuh) Htg (cfm) Clg (cfm) Design FIR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk DEN c 2274 73 99 1.000 7.0 Ox0 VIFx 66.4 115.0 st3 M BATH h 6794 221 145 1.000 8.0 Ox0 VIFx 65.6 115.0 st3 MASTER BEDROOM c 3362 121 146 1.000 8.0 Ox0 VIFx 71.5 135.0 st6 MASTER BEDROOM -A c 3362 121 146 1.000 8.0 Ox0 VIFx 69.5 135.0 st6 WASHRM c 550 2 24 1.000 5.0 Ox0 VIFx 69.0 135.0 st6 WIC 1 h 1477 48 26 1.000 5.0 Ox0 VIFx 63.4 115.0 st3 WIC 2 c 75 3 3 1.000 4.0 Ox0 VIFx 62.4 115.0 st3 Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk st6 Peak AVF 245 316 1.000 716 9.0 0 x 0 VinlFlx st3 st3 Peak AVF 590 590 1.000 751 12.0 0 x 0 VinlFlx Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FIR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Matl Trunk rb 1 Ox 0 590 590 0 0 0 0 Ox 0 VIFx - -- ift—il"1111111- wrigl 2020-Nov-05 11:24:07 .,..,�.,q,,.H.� Right -Suite® Universal 2019 19.0.08 RSU08101 Page 3 �L ✓ E:\Documnets\Wrightsoft HVAC\BELAND RESIDENCE.rup Calc = MJ8 Front Door faces: N This document was created with Win2PDF available at http://www.win2pdf.com. The unregistered version of Win2PDF is for evaluation or non-commercial use only. This page will not be added after purchasing Win2PDF.