Loading...
HomeMy WebLinkAboutBELAND- CHECKLIST2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: BELAND RESIDENCE Builder Name: Street: 7964 PLANTATION LAKES DRIVE Permit Office: ST LUCIE COUNTY City, State, Zip: PORT ST LUCIE, FL, Permit Number: Y U Owner: EDDY AND CONNIE BELAND Jurisdiction: ST LUCIE COUNTY w Design Location: FL, Fort Pierce U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA, General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the The insulation in any dropped ceiling/soffit insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be sealed. shall be insulated by completely filling the cavity with a Knee walls shall be sealed. material having a thermal resistance of R-3 per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/door jambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of insulation. Floor framing cavity insulation shall be installed to (including maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation shall and cantilevered floors) be permitted to be in contact with the top side of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottorn to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with a Where provided instead of floor insulation, insulation Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls. Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Recessed lighting Recessed light fixtures installed in the building thermal envelope shall Recessed light fixtures installed in the building be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall be on exterior wall tubs shall separate them from the showers and tubs. insulated. Electrical/phone box on The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sealed sprinklers in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover Nates and walls or ceilincis. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 11/5/2020 12:27 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 This document was created with Win2PDF available at http://www.win2pdf.com. The unregistered version of Win2PDF is for evaluation or non-commercial use only. This page will not be added after purchasing Win2PDF.