Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
inspection report 12/8/2020 (2)
G Universal Engineering Sciences Company 'CeN�i�aN� INSPECTION RESULTS I nspectio n Date: 1A -'6 - _x 6 2-6 Permit No. Project: Oe q (A ✓z,� Address: %d 0,)- P ,(),J k 1,Al Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock I Appliance/Equipment I I Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: _29G/iza55 Area Inspected/Code g00 Inspection Results: IXAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. Inspector's Name: J� T� � �uticu ram— Lic. #: A�J i�g rY OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com