Loading...
HomeMy WebLinkAboutEnergy Codeos�S FORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUFLDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: WYNNE THE ROYALE IMPACT Builder Name: WYNNE Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE, FL, Owner: (_Olo q'-3 Permit Number: Jurisdiction: Design Location: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) 1. New construction or existing New (From Plans) 9. Wall Types.(1688.7 ,sgft.) Insulation Area 2. Single family or multiple family Single-family a. Concrete Block - Int Insul, Exterior R=4.1 1448.70 ft2 3: Number of units, if multiple family 1 b. Frame - Wood, Adjacent R=11.0 240.00 ft2. c. N/A R= ft2 4. Number of Bedrooms 3 d. N/A R= ft2 5. Is this a worst case? Yes 10. Ceiling Types (1750.0 sgft.) Insulation Area. 6. Conditioned floor area above grade (ft2) 1720 a, Under. Attic (Vented) b. Wall (Vented) R=30.0 1720.00 ft2 R=19.0 30.00 ft2 Conditioned floor area below grade (ft2) 0 c. N/A R= ft2 7. Windows(155.4 sgft.) Description Area 11. Ducts Sup: Attic, Ret Attic, AH: Attic R . ft2a. 6 175 a. U-Factor: Sgl, U=1.04 115.42 ft2 SHGC: SHGC=0.29 b. U-Factor: Sgl, U=1.11 40.00 ft2' 12. Cooling systems kBtu/hr Efficiency SHGC:. SHGC=0.27 a. Central Unit 34.8' SEER:15.00 c. U-Factor: N/A ft2 SHGC: d. U-Factor: N/A ft2 13. Heating systems kBtu/hr Efficiency SHGC: a. Electric Heat Pump 34.8 HSPF:8.50 Area Weighted Average Overhang Depth: 3.316 ft. Area Weighted Average SHGC: 0.285 14. Hot water systems 8. Floor Types (1720.0 sqft.) Insulation Area a. Electric Cap: 40.gallons a. Slab -On -Grade Edge Insulation R=0.0 1720.00 ft2 b. Conservation features EF: 0.970 b. N/A R= ft2 None C. N/A R= ft2 45_ Credits . Pstat Glass/Floor Area: 0.090 Total Proposed Modified Loads: 56.36 1� A SS PASS Total Baseline Loads: 56.25 hereby certify that the plans and specifications covered by this Review of the plans and calculation are in compliance with the Florida Energy specifications covered by this �, -: 0 Code. .calculation indicates compliance, with the Florida Energy Code.* PREPARED BY:�%' �--� - - Before construction is completed DATE: I-9-20 this building will be inspected for - •~' compliance with Section 553.908 hereby certify that this building, as designed, is in compliance, the Florida Florida Statutes. with Energy Code.'' OWNER/AGENT: BUILDING OFFICIAL: 1r DATE: �� DATE: Compliance requires certification by the air handler unit manufacturer that the air -handler enclosure qualifies as . certified factory -sealed in accordance with 11403:3:2:1. - Compliance requires an Air*Barrierand Insulation Inspection Checklist.in accordance with R402A.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R4ft EW E D FOR CODE COMPLIANCE ST. LU.CIE COUNTY 1/8/2020 4:66 PM EnergyGauge® USA 6.0:02 (Rev. 1) - FlaRes2017 FBC 6th Edition. (2017) CompPangoyVA4 Page 1. of 5 FORMR405-2017 INPUT SUMMARY:"CHECKLIST REPORT PROJECT Title: WYNNE THE ROYALE IMPA Bedrooms:. 3 Address Type: Street Address Building Type: User Conditioned Area: 1720 Lot # Owner Name: Total Stories: 1 Block/Subdivision: # of Units: 1 Worst Case: Yes PlatBook: Builder Name: WYNNE Rotate Angle:. 90 Street:' WYNNE DEV. Permit Office: ST. LUCIE COUNTY Cross Ventilation:. No County: St. Lucie Jurisdiction: Whole House Fan: No City, State, Zip: FT. PIERCE, Family Type: Single-family FL, New/Existing: New (From Plans) Comment: CLIMATE / Design Temp Int Design Temp Heating Design Daily Temp Design Location TMY Site 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, Fort Pierce FL_VERO_BEACH MUNI 39 90 70 75 " 299 62 Low. ,BLOCKS 'Number Name' Area. Volume 1 Entire.House 1720 13760 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 BEDROOM 343 2744 No 0 1 1 Yes, Yes Yes 2 WIC 63 504 No 0 1 No. Yes' 'Yes 3 M.BATH 56 448. No 0 1 Yes Yes Yes 4 KITCHEN 172 1376 Yes 0 1 No Yes Yes 5. BATH 45 360 No 0 1. Yes Yes Yes 6 BEDROOM 2 204 1632 No 0 1 1 Yes Yes Yes 7 ENTRY 98 784 No 0 1 Yes Yes Yes 8 LAUNDRY 42 336 No 0 1 Yes Yes Yes 9 GREAT/DINING 528 4224 No 0 1 Yes Yes Yes 10 BEDROOM 3 169 1352 No 1 1 1 Yes Yes, Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value - Area Joist R-Value . Tile . Wood Carpet 1 Slab -On -Grade Edge Insulatio BEDROOM 52.ft 0 343 ft2 ____ 0 1 0 2 Slab -On -Grade Edge Insulatio WIC 1 ft 0 63 ftZ ____ 0 1 0 3 Slab -On -Grade Edge. Insulatio M: BATH 8 ft 01 ' 56 ft2 0 1. 0 4Slab-On-Grade Edge Insulatio KITCHEN 1 ft 0 172 ft2 ____ 0 1 0 5 Slab -On -Grade Edge Insulatio BATH 5 ft 0 45'ft2 0 1 0 6 Slab -On -Grade Edge Insulatio BEDROOM-2 42.6 ft 0 204 ft2 0 1 0 7 Slab -On -Grade Edge Insulatio ENTRY 6.3 ft 0 98 ft2 _ 0 1 0 1/8/2020 4:5 6PM EnergyGauge® USA 6.0.02,(Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software . Page 2 of.5 FORM R405-2017 INPUT -SUMMARY -CHECKLIST REPORT FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 8 Slab -On -Grade Edge: Insulatio . LAUNDRY 6 ft 0 42 ft2 0 1 0 9 SIab-On-Grade Edge Insulatio GREAT/DINING 48 ft 0 52812 _ 0 1 0 10SIab-On-Grade Edge Insulatio BEDROOM.3 13 ft 0 169 ft2 ____ 0 1 0 ROOF / Roof Gable Roof Rad Solar SA Emitt Emitt Deck Pitch V # Type. Materials Area Area Color Barr •Absor...Tested Tested. Insul.. (deg). 1 Gable or Shed Metal 1813 ft2 286 ft2 Light N 0.6 No 0.9 No 0 18.4 ATTIC V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Vented 150 1720 ft2 N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic. (Vented) BEDROOM 30. Blown 343ft2. 0.1 Wood ' 2 Under-Attic(Vented) WIC 30 Blown. 6312 0.1 Wood 3 Under Attic (Vented) M. BATH 30 Blown 56 ft2 0.1 Wood 4 Under Attic (Vented) KITCHEN 30 Blown' . 172 ft2 0.1 Wood 5 Under Attic (Vented) BATH 30 Blown 45 ft2 0.1 Wood 6 Under Attic (Vented) BEDROOM 2 30 Blown 204 ft2 0..1 Wood 7 Under Attic (Vented) -ENTRY 30 Blown 98 ft2 0.1 Wood 8 Under Attic (Vented) LAUNDRY 30 Blown 42 ft2 0.1 Wood 9 Under Attic (Vented) GREAT/DINING 30 Blown 528 ft? 0.1 Wood 10 Under Attic (Vented) BEDROOM 3 30' Blown 169 ft2 0.1 Wood 11 Knee Wall (Vented) GREAT/DINING 19 Blown 30 ft2 0.11 Wood WALLS Adjacent Cavity Width SpaceArea Height Sheathing . Framing Solar Below lle o 1 N=>E Exterior Concrete Block -Int InsuBEDR00M 4.1 9 • 0 .. 8 , 0 72.0•ft2 0 0. 0.4 0 2 S=>W Exterior Concrete Block - Int InsuBEDROOM 4.1 .29 0 8 0 232.0 ft2 0 0 0.4 0 _ 3 W=>N Exterior Concrete Block - Int InsuBEDR00M 4.1 14 0 8 0 112.0 ft2 0 0 0.4 0 4 S=>W Exterior Concrete Block = Int Insul M. BATH 4.1 8 0 8 0 64.0 ft2 0 0 0.4 0 5 N=>E Exterior Concrete Block- Int Insul BATH 4.1 5 0 8 0 40.0 ft2 0 6 0.4 0 6 N=>E Exterior Concrete Block - Int InsHIEDROOM 2 4.1 1.4 0 8 0 112.0 ft2 0 0 0.4 0 7 NE=>SE Exterior Concrete Block = Int InsREDROOM 2 4.1 2 10 8 0 22.7 ft2 0 0 0.4 0 8 E=>S Exterior. Concrete Block -.Int InskDROOM 2 4.1 9 0 8 0 72.0 ft2 0 0. 0.4 0 _ 9 SE=>SW Exterior Concrete Block. = Int InsBIEDROOM 2 4.1 .2- 10 8 0 22.7 ft2 0 0 0.4 0 10 S=>W Exterior Concrete Block - Int InsE EDROOM 2 4.1 14 0 8 0 112.0 ft2 0 0. 0.4 0 _ 11 NE=>SE Exterior Concrete Block- Int Insul ENTRY 4.1 '.1 5 8 '0 11:3 ft2 0 0 0.4 0 1/8/2020 4:56 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 FORM R405-2017 INPUT SUMMARY C'HFCKI 1ST RFPnRT WALLS Adjacent Cavity Width Space Height Sheathing Framing . Solar Below o 12 E=>S Exterior Concrete Block - Int Insul ENTRY 4.1 5 0 8 0 40.0 ft2 _ 0 0 0.4 0 13 S=>W Exterior Concrete Block - Int InsuLAUNDRY 4.1 6 0 8 0 48.0 ft2 0 0 0.4 0 _ 14 N=>E Exterior Concrete Block - Int Insu6REAT/DINI 4.1 28 0 8 0 224.0 ft2 0 0 0.4 0 15 W=>N Exterior Concrete Block - Int InstOREAT/DINI 4.1 20 0 8 0 160.0 ft2 0 0 0.4 0 16 N=>E Exterior Concrete Block - Int InsiNEDROOM 3 4.1 13 0 8 0 104.0 ft2 0 0 0.4 0 _ 17 N=>E Garage Frame - Wood BEDROOM 3 11 30 8 .240.0 ft2 0.23 0.4 0 DOORS # Ornt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 E=>S Insulated ENTRY None .32 3 6 8 20 ft2 WINDOWS Orientation shown. is the entered orientation => changed to Worst Case. / Wall Overhang V # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 W=>N 3 _Metal Low-E Single Yes 1.04 0.29 N 32.4 ft2 1 ft 0 in 1 ft 5 in Drapes/blinds Exterior 5 2 S=>W 4 Metal 'Low-E Single Yes 1.04 0.29 N 6.9 ft2 1 ft 0 in 1 ft 5 in None None 3 E=>S 8 Metal Low E Single Yes 1.04 0.29 N 23.2 ft2 1 ft 0 in 1 ft 5 in None None 4 N=>E 14 Metal Low-E Single Yes 1.04 0.29 N 36.8 ft2 1 ft 0 in 1 ft 5 in None None 5 W=>N 15 Metal Low-E Single Yes 1.11 0.27 N 40.0 ft2 10 ft 0 in 1 ft 5 in None None . 6 N=>E 16 Metal, Low E Single Yes 1.04 0.29 N 16.2 ft2 1 ft 0 in 1 ft 5 in None None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 300 ft2 300 ft2 30 ft 8 It 11 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000356 1605.3 88.13 165.74 .1233 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Singl HSPF:8.5 34.8 kBtu/hr 1 sys#1 COOLINGSYSTEM # System Type Subtype Subtype Efficiency •Capacity Air Flow SHR Block Ducts 1 Central Unit/ Split Singl SEER: 15 34.8 kBtu/hr cfm 0.85 1 sys#1 1/8/2020 4:56 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5 FORM Pdnl;i_7f147 IAIDI IT.Ci iRfiRAADV-f%UCt%V1 ICT CCM^07 " HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.97 40 gal' 60.9 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector . Storage Cert # Company Name System Model # Collector Model # Area Volume FEF None None ft2 DUCTS / — Supply -- --= Retum — Air CFM 25 CFM25 HVAC # V # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN" RLF Heat Cool 1 Attic 6 176 ft2. Attic " 65 ft2 - Default Leakage Attic (Default) (Default) 1 1 TEMPERATURES Programable Thermostat: Y Ceiling Fans: Coolin [[ ]] Jan [[ �Feb Heating [X] Jan [X] Feb [j Mar Mar r [ A r .� Apr [ [ ] Ma • ] May [X Jun �X] Jul ['� Jun [ ] Jul (X Au [ `� Aug Sep ri Se [ Oct [r j,Nov [ Oct Nov [ �Dec lX] Dec Veni [ ]] Jan [[ jj Feb [Xj Mar lxl [X A r [ ] Ma [ Jun [ ] Jul [ Au Se [X Oct [X] lxJ Nov [[ ]] Dec Thermostat Schedule: HERS2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 78 78 78 7t 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (VVD) AM 66 66 66 66 66 68 68 68 68 68' 68 68 PM 68 68 68 68 68 68 68 68 68 .68 66 66 Heating (WEH) AM 66 66 66 66 66 68 68 .68, 68 68 68 68 PM 68 68 68 68 68. .68 68 68 6&' 68 - .66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ft2 0 ft 0.3 BEDROOM Default(81bs/sq.ft. ft2 ft 0.3 WIC Default(8 Ibs/sq:ft: ft2 ft 0.3 M. BATH Default(8lbs/sq.ft. ft2 ft 0.3 KITCHEN . Default(8 Ibs/sq.ft, ft2 ft 0.3 BATH Default(8 Ibs/sq:ft. ft2 ft ". 0.3 BEDROOM 2 Default(8 Ibs/sq:ft. ft2 ft 0.3 ENTRY Default(81bs/sq.ft. ft2 ft 0.3 LAUNDRY Default(8 lbs/s .ft:. ft2 fb 0.3 GREAT/DINING 1/8/2020 4:56 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FI6Res2017 FBC 6th Edition (2017) 'Compliant Software . Page 5, of 5. • 2017 -AIR BARRIER AND, INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATIOWNSPECTION COMPONENT CRITERIA Project Name: WYNNE THE ROYALE IMPACT Builder Name: WYNNE Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE, FL, Permit Number: Owner: Jurisdiction: w .Design Location: FL, Fort Pierce COMPONENT AIR BARRIER CRITERIA INSULATION -INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a. continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceilinglattic The air barrier in any. dropped ceiling/soffit shall.be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to. unconditioned attic spaces shall be sealed. Walls The junction of -the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top: plate and the top of exterior walls shall be - shall be insulated by completely filling. the cavity sealed. with a material having a thermal resistance of 9-3 Knee walls shall be. sealed. per inch minimum. , -Exterior thermal envelopelilisulatiori for framed walls shall be installed in substantial contact and continuous alignment with the air barrier: Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed.' Rim joists Rim joists shall include the air barrier: Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing. cavity insulation shall be installed.to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the' bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned s ace shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the. drywall. thermal envelope shall be air tight and IC rated._ Plumbing; and wiring Batt insulation shall be cut neatly to, fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Showerltub The air barrier installed at exterior walls adjacent to. showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air.barrier shaif be installed behind electrical or communication exterior wails boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate- building thermal envelope shall be sealed to,the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers: shall only be sprinklers sealed. in a manner that is recommended, by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire speinkler cover plates and =Ila or ceilings, a. in aaamon, inspection oT rog,.waus snau oe in accoraance wim me provisions-oT IL..u-4uu. 1/8/2020 4:57 PM EnergyGauge@ USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant. Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY -CARD - ESTIMATED ENERGY PERFORMANCE INDEX* =.100 The lower the Energy Performance Index,.the more :efficient the home. 1. New home or, addition 1. -New (From Plans) 12. Ducts; location & insulation level a) Supply, ducts R 6.0 2. Single-family or multiple -family 2. Single.family b). Return ducts R 6.0. c) AHU location Attic 3. No. of. units (if multiple -family) 3. 1 4. Number of bedrooms 4. -3 13. Cooling system: Capacity' ' 34.8 a) Split system SEER 15.0 5. Is this a worst case? (yes/no) 5. Yes b) Single package SEER . c) Ground/water source SEER/COP 6. Conditioned floor area (sq. ft.) 6. 1720 d) Room unit(PTAC EER e) Other 7. Windows, type and area a) U-factor:(weighted average.) 7a. 1.058 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.285 14. Heating system: Capacity 34.8 c) Area 7c. 155.4 a), Split system heat pump HSPF . •8.5 b) Single package heat pump: HSPF 8. Skylights c) Electric resistance COP a) U-factor:(weighted average)' 8a. NA d) Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace,. LPG AFUE f) Other 9. Floor type, insulation level: a) Slab -on -grade (R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R=value) 9c.' a) Electric resistance EF 0.97 b} Gas fired, natural gas. EF 10. Wall type and insulation: " c).Gas fired, LPG EF A: Exterior: d) Solar system with tank EF 1. Wood frame. (Insulation R-Value) 10A1. e) Dedicated heat pump with tank EF 2..Masonry'(Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec%o B. Adjacent: g)-Other 1. Wood frame (insulation R-value) 1061. 11.0 2. Masony (Insulation R-value) 1062. 16'. HVAC,credits claimed (Performance Method) 11. Ceiling type' and insulation level a) Ceiling fans a) Under attic 11a. 30.0 b) Cross ventilation No b) Single assembly 11 b. c) Whole house fan No c) Knee walls/skylight walls 11 c.. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11d. No . e) Multizone heating credit 0 Programmable thermostat Yes *Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation; if not DEFAULT I certify that this home has complied with the Florida Building. Code, Energy Conservation, through the above energy saving features which :will be installed (or exceeded): in. this home before final inspection. Otherwise, a new EPL . display card will be completed based. on' installed code compliant -features. `Builder Signature:_ _ Date: Address of.New Home:., WYNNE DEV. tpy''' � \ C� City/FL'Zip: FT. PIERCE: FL 1/8/2020 4:56:58 PM EnergyGaugeO USA 6.6.04 (Rev. 1) - HaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1