Loading...
HomeMy WebLinkAboutGAF Feltbuster underlayment7/1/2020 Florida Building Code Online �' .�,�.,.�...r^eG,.�� BCIS Home ; Log In User Registration ! Hot Topics Submit Surcharge Stats & Facts !. Publications Contact Us BCIS Site Map Links Search b a Product Approval P �, �_ USER: Public User Product Approval Menu > Product or Application Search > Application List > Application Detail FL # FL10626-R18 Application Type Revision Code Version 2017 Application Status Pending FBC Approval Comments Archived Product Manufacturer GAF Address/Phone/Email 1 Campus Drive Parisppany, NJ 07054 (800) 766-3411 mstieh@gaf.com Authorized Signature Robert Nieminen Ireith@nemoetc.com Technical Representative William Broussard Address/Phone/Email 1 Campus Drive Parsippany, NJ 07054 (800) 766-3411 TechnicalQuestionsGAF@gaf.com Quality Assurance Representative Address/Phone/Email Category Roofing Subcategory Underlayments Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer Evaluation Report - Hardcopy Received Florida Engineer or Architect Name who developed the Robert Nieminen Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 12/16/2022 Validated By John W. Knezevich, PE Validation Checklist - Hardcopy Received Certificate of Independence FL10626 R18 COI 2020 01 COI NIEMINEN.pdf Referenced Standard and Year (of Standard) Standard Year ASTM D1970 2015 ASTM D226 (physicals) 2009 ASTM D4533 (tear) 2015 ASTM D6164 2011 ASTM D6757 _. 2016 FM 4474 2011 FRSA/TRI April 2012 (04-12) 2012 Equivalence of Product Standards Certified By https://www.floridabuilding.org/prlpr_app_dtl.aspx?param=wGEVXQwtDgtBNbEY5V%2boQY9nVE2RUHVOuwgULxCexQlBupAuygnbPQ%3d%3d 1/2 7/1 /2020 Sections from the Code Florida Building Code Online Product Approval Method Date Submitted Date Validated Date Pending FBC Approval Products Method 1 Option D 06/08/2020 06/08/2020 06/12/2020 FL # 1 Model, Number or Name I Description 10626.1 GAF Roof Underlayments Roofing Underlayments for use in sloped roof systems Limits of Use Installation Instructions i Approved for use in HVH2: No FL10626 R18 II 2020 06 04 FINAL ER GAF UNDERLAYMENTS FL10626- Approved for use outside HVH2: Yes R18.pdf Impact Resistant: N/A Verified By: Robert Niemien 59166 Design Pressure: +N/A/-442.5 Created by Independent Third Party: Yes Other: 1.) The design pressure noted in this Evaluation Reports application relates to one particular FL10626 R18 AE 2020 06 04 FINAL ER GAF UNDERLAYMENTS FL10626- 1 underlayment system. Refer to ER Section 5.6.4 R18.pdf i for details. 2.) Refer to ER Section 5 for other Created by Independent Third Party: Yes Limits of Use. [ ■ l Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer. Copyright 2007-2013 State of Florida.:: Priyacy_Statement :: Accessibility Statement :: Refund Statemen Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. *Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emaiis provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here . Product Approval Accepts: t,. 1 9a Ed _ Credit4 Safe https:llwww.floridabuilding.org/prlpr app_dti.aspx?param=wGEVXQwtDgtBNbEY5V%2boQY9nVE2RUHVOuwgULxCexQlBupAuygnbPQ%3d%3d 2/2 NEmo ( etc. Certificote of Authorirotloo #32455 353 Christian Street, Unit #13 Oxford, CT 06478 (203) 262-9245 ENGINEER EVALUATE TEST CONSULT GAF Evaluation Report 01506.04.08-R18 ICampus Drive FL10626-R18 Parsippany, N! 07054 Date of Issuance: 04/25/2008 (800) 766-3411 Revision 18: 06/04/2020 SCOPE: This Evaluation Report is issued under Rule 61620-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen, P.E. for use of the product under the Florida Building Code and Florida Building Code, Residential Volume. The products described herein have been evaluated for compliance with the 611' Edition (2017) Florida Building Code sections noted herein. DESCRIPTION: GAF Roof Underlayments LABELING: labeling shall be in accordance with the requirements of the Accredited Quality Assurance Agency noted herein and FBC 1507.1.1. CONTINUED COMPLIANCE: This Evaluation Report is valid until the named product(s) changes, the referenced Quality '-Assurance ocumentation changes, or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nleminen, P.E. of any changes to the product(s), the Quality Assurance or the production facility location(s). NEMOletc, requires a complete review of this nts Muvcn1wc1V1cr4r. [fit: cvdtuauUn rceporti nurnuer preceuea oy Ene woras -wtiviule1c. tvaluatea"" may De aiSpiayea in advertising literature. If any portion of the Evaluation Report is displayed, then it $hail be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 11. Prepared by: Robert J.M. Nieminen, P.E. Florida Registration No. 59166, Florida DCA ANE1983 The facsimile seal appearing was authorized by Robert Nieminen, P.E. on 06/44/2020. This does not serve as an electronically signed document. CERTIFICATION OF INDEPENDENCE: 1. NEW ETC, LLC does not have, nor does it intend to acquire, or will it acquire, a financial Interest in any company manufacturing or distributing products it evaluates. 2. NEMO ETC, LLC is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither NEMO I etc. nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 02019 MEMO ETC, LLC NEMO etc. Product Category: Roofing Sub -Category: Underlayment Compliance Statement: GAF Roof Underlayments, as produced by GAF, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations / Conditions of Use set forth herein. section P_ 1504.3.1 Wind Uplift f FM 4474 2011 1507,11, R905.1.1 Exception Unrolling, Breaking Strength, Pliability ASTM D226 2009 1507.1.1, R905.1.1 Exception Tear Strength ASTM D4533 2015 1507.2.3 /1507.1.1 Physical Properties ASTM D6757 2016 15 07.2.4 / 1507.1.1, 1507.2.9.2 Physical Properties ASTM D1970 2015 1507.3.3, R905.3.3 Physical properties FRSA/TRI April 2012 (04-12) 2012 2507.11.2 Physical Properties ASTM D6164 2012 ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) ERD (TST 6049) Intertek �1558) E xatfi 651�t Physical Properties Physical Properties FRSA/TRI April 2012 (Slippage) ASTM D6164 ASTM D6164 ASTM D1970 ASTM D1970 FBC I507.1.1 Exception) R3360.02.07-2-RI G12110.12,09 634150,08.12 G40630.01.14-2B 646160,09.14-3A GAF-SC13285.03,17-3 GAF-SC13285.03.17-4 E549.0 =a5-_U 03/13/2007 12/02/2008 11/14/2021 01/07/2024 09/09/2014 03/01/2017 03/02/2017 11/08/2016— PRI (TST5878) Physical properties BRY-003-02-01 03/19/2002 PRI (TST 5-878, 03/2612002 PRI (TST 5878) ASTM D1970 GAF-027-02-01 03/26/2002 PRI (TST 5878) Physical properties GAF-042-02-01 06103/200S PRI (TST 5878) Physical properties GAF-224-02-01 07/27/2009 PRI (TST 5878) ASTM D1970 GAF-238-02-01 03103/2010 PRI (TST 5878) ASTM D1970 GAF-275-02-01 11/11/2010 PRI (TST 5878) Physical properties GAF-349-02-01 07/03/2012 PRI (TST 5878) Wind Uplift GAF-434-02-01 09/16/2013 PRI (TST 5878) Wind Uplift GAF-434-02-03 09/16/2013 PRI (TST 5878) Wind Uplift GAF-434-02-04 09/16/2013 PRI (TST 5878) FBC 1507.1.1 (Exception) GAF-818-02-01 12/05/2017 PRI (TST 5978) ASTM D1970 (AL) MSA-047-02-01 04/11/2018 PRI (TSTS878) FBC 2507.1.1 (Exception) GAF-826-02-02 06/04/2018 PRI (TST 5878) FBC 1507.1.1 (Exception) GAF-847-02-01 06/04/2018 PRI (TST 5878) FBC 1507.1.1 (Exception) GAF-914-02-01 04/10/2019 PRI (TST 5878) FBC 1507.1.1 (Exception) 376T0012 07/15/2019 PRI (TST 5878) FBC 1507.1.1 (Exception) 376T0018 x 2 07/31/2019 PRI (TST 5878) ASTM D1970 376T0032 10/22/2019 UL (TST 1740) Physical properties 02NK22569 06/04/2002 UL (TST 1740) ASTM D6757 I0NK11990 05/18/2011 Miami -Dade (CER 1592) HVHZ compliance 16-1216,02 02/02/2017 Miami -Dade (CER 1592) HVHZ compliance 18-0119.15 02/22/2018 ICC-ES (EVL2396) IBCARC compliance ESR-2053 07/01/2017 JCC-ES (EVL2396) IBC/IRC compliance ESR-2808 07/01/2017 ICC-ES (EVL2396) IBC/IRC compliance ESR-1322 01/01/2018 MEMO ETC, LLC Evaluation Report 01506.04.08-RI8 Certificate of Authorizatfan #32455 6-EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R18 GAF Roof Underiayments; (800) 766-3411 Revision 18: 06/04/2020 NNEMOjetc. i Bttti D-�: ]CC -ES (EVL2396) IBC/IRC compliance ESR-3286 02/01/2018 NEMO ETC Traceability FBC Cross -Listing 04/22/2020 UL, LLC (QUA 9625) Quality Control Service Confirmation 05/21/2019 UL, LLC (QUA 9625) Quality Control Service Confirmation (AL) 05/04/2020 ?i< 4.1 4.2 4.3 4.4 —4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 PRtJpUCT�ESCRIi?�'IQN '� �' t- Product r _5peciiicatlon :- Piarit(sj Description LibertyTM" SBS Self Adhering ASTM D1970 Mt. Vernon, IN smooth -surfaced, fiberglass -reinforced, self- Base/Ply Sheet adhering SBS modified bitumen roof underlayment StormGuard19 Film Surfaced ASTM D1970 Mt. Vernon, IN film -surfaced, fiberglass -reinforced, self - Leak Barrier Savannah, GA adhering SBS modified bitumen roof underlayment; also used as a secondary water barrier to seal roof decks WeatherWatch® Mineral ASTM D1970 Mt. Vernon, IN mineral -surfaced, fiberglass -reinforced, self - Surfaced Leak Barrier Savannah, GA adhering SBS modified bitumen roof Arkadelphia, AR underlayment; also used as a secondary Tuscaloosa, AL water barrier to seal roof decks Deck -Armor' Premium FBC 1507.1.1 & North Bay, ON non -woven, spun -bonded polypropylene Breathable Roof Deck R905.1.1 Dadra, India laminated polyethylene scrim sheet roof Protection (Exception) underlayment FeltBusterg High -Traction FBC 1507.1.1 & Richmond, VA non -asphaltic, polypropylene roofing Synthetic Roofing Felt R905.1.1 Dadra, India underlayment (Exception) Shingle -Mate® Roof Deck FBC 1507.1.1 & Pryor, OK fiberglass reinforced, asphaltic roof -Protection 11905A.1 un er aymen (Exception) StormSafel Anchor Sheet FBC 1507.1.1 & North Bay, ON polypropylene woven fabric which serves as R905.1.1 an anchor sheet in two-ply roof (Exception) underlayment systems Tiger Pawl Roof Deck FBC 1507.1.1 & Dadra, India non -woven, polypropylene reinforced, Protection R905.1.1 North Bay, ON polymer coated roof underlayment (Exception) Parzal, India Umerkui Kilvani, India RoofProl SBS-Modified All- AC165 Fontana, CA fiberglass -reinforced, SBS modified bitumen Purpose Underlayment roof underlayment VersaShieid® Fire -Resistant ASTM D6757 Conover, NC non -asphaltic, fiberglass -based roof Roof Deck Protection (physicals) underlayment and/or fire barrier Ruberoid" Mop Granule ASTM D6164 Savannah, GA granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof underlayment Ruberold" Mop Granule FR ASTM D6164 Savannah, GA granule -surfaced, polyester -reinforced, asphalt -applied SBS modified bitumen roof underlayment NEMO ETC, LLC Evaluation Report o1506.04.08-Ri8 Certtflcate ofAuthorkation #32455 6-EDITION (2017) FBC NON-HVH2 EVALUATION F1.10626-1118 GAF Roof Underlayments; (800) 766-3411 Revision 18: 06/04/2020 5.1 This is a building code evaluation. Neither MEMO ETC, LLC nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance uniess.retained specifically for that purpose. 5.2 This Evaluation Report Is not for use in FBC HVHZ jurisdictions. 5.3 Fire Classification is not part of this Evaluation Report; refer to currentApproved Roofing Materials Directory for fire ratings of this product. - 5.4 GAF Roof Underlayments may be used with any prepared roof cover where the product Is specifically referenced within FBC approval documents. If not listed, a request maybe made to the Authority Having Jurisdiction for approval based on this evaluation combined with supporting data for the prepared roof covering. 5.5 Allowable Roof Covers: Ci2TtQlr Asphalt City and Condreie.7�le - �iVletai Slate wood Underlaymept Shingles ( . 3j 5hEngies (1so7�)611.ailechanical dh AeSrve Panels Shtngfes /s77) 5hingles Shakes Attach,;. Set (15074J Liberty- SB5Self-Adhering Base/Pty Sheet Yes No No No No No No No StormGuard& Film Surfaced Leak Barrier Yes No No Yes Yes Yes No No WeatherWatch& Mineral Surfaced Leak Barrier Yes No No No No No No No Deck -Armor" Premium Breathable Yes Na No Contact Contact Contact Contact Contact Roof Deck Protection GAF GAF GAF GAF GAF FeltBuster" High -Traction Synthetic Roofing Felt Yes No No No No No No No Shingle-Mate'Root Deck Protection Yes No No No No No No No Tiger Pawl" Roof Deck Protection Yes No No Contact Contact Contact Contact Contact GAF GAF GAF GAF GAF RoofPro- SBS-Modified Ail- Purpose Underlayment Yes No No No No Yes Yes Yes VersaShield& Fire -Resistant Roof Deck Protection Yes No No No No Yes No No Ruberoid& Mop Granule Yes Yes No No Yes Yes Yes See 55.1 Ruberoid& Mop Granule FR Yes Yes es No No Yes Yes Yes See 5.5.1 "Foam -On Tile" is limited to use of the following Approved tile adhesives / underlavment combinations. �.....,.. �`.�, .__:.� �.,_. �TABTE�A�AC�tfWABLETi#.�AnDMEs1VE�111•�D�ftL�k�prll:td7�i�,t1I+�8INA'FfONSi rtaytpent = Adhesive :Florida Product Approval Ruberoid® Mop Granule; Ruberoid* Mop Granule FR Dupont TILE BOND= FL22525 1 Refer to Tile Manufacturer's orAdhesive Manufacturer's Florida Product Approval for Overturning Moment Resistance Performance. NEMO ETC, LLC Evaluation Report 01506.04.08-1118 Certifrcote of Authariradon 02455 6- EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R18 GAF Roof Underlayments; (800) 766-3411 Revision 18: 06/04/2020 ONEMOletc. 5.6 Allowable Substrates: Liberty"' SBS Self -Adhering Base/Ply Sheet self -adhering (Optional) ASTfV1 D41 plywood StormGuard* Film Surfaced Leak Barrier . Weather Watch19 Mineral Surfaced Leak Barrier Liberty' SBS Self -Adhering Base/Ply Sheet self -adhering None ASTM D226 felt StormGuardl Film Surfaced Leak Barrier Weather WatchO Mineral Surfaced Leak Barrier Liberty' SBS Self -Adhering 6ase/Ply Sheet self -adhering ASTM D41 metal (flashing metal, valley metal, etc.) StormGuardO Film Surfaced Leak Barrier Weather WatchO Mineral Surfaced Leak Barrier Ruberold' Mop Granule hot asphalt ASTM D41 structural concrete Ruberoid" Mop Granule. hotasphalt None GAFGLAS* #80 Llltima� Base Sheet or �.1 Wind Resistance for Underlayment �ystems in Foam -On Tile Applications: The following wind uplift limitations apply to vndmdayment systems that are not prescriptively addressed in FRSVTR|April 2012 (04' 2)andareusoJinfoam- onrmortaesettileapplicadons. Maximum Design Pressure b the result oftesting for wind load resistance based on allowable wind loads and reflects the ultimate passing pressure divided by 2 (the 2 to I margin of safety per FBC 1504.9 has already been applied). Refer to FRSA/TRI April 2012 (04-12), Appendix A, Table 1A or FBC 1609 for determination of design wind loads. ( #1 Maximum Design Pressure =-45 vsf. Deck: Min. 19/32-inch plywood to meet p rements; to satisfaction of Authorlty_JJ'zdng 1.25-inch long ring shank nails through 32 ga., 1-5/8-inch diameter tin caps spaced 9-inch o.c. at the min, 4-Inch wide side laps and 9-Inch o.c. attwo (2), equallyspaced, staggered center rows in the field of the sheet. ' Cap Sheet: KubemidmMop Granule orRuberoid*Mop Granule FRapplied in full mopping cfASTM D312,Type IV hot asphalt at 20 to 25, lbs/square. #Z Maximum Design Pressure = -7"—Sf. Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: GAFGLASO #80 Ultimal Base Sheet mRu4eroid" 20 Smooth mechanically attached with 12 ga., min. 1.25-inchlong ring shank nails through 310a,1-5/O-inc diameter tin caps spaced &inc6ox:a¢the min. 4-inch wide side laps and 8-inch o.c. at three (3), equally spaced, staggered center rows in the field nfthe sheet. Cap Sheet: Ruberoid" Mop Granule or RuberoidO Mop Granule FR applied In full mopping of ASTM D312, Type |Vhot asphalt at20to%5|bs/squore. wsMoETC, uc Evaluation nepwrtn1506mx08-1118 Cerdficote OfAuthorlzatlOn #32455 e" EDITION (2017)nowON-HVHZ EVALUATION a10626-RI8 GAF Roof undw,laymemw(800) 766-3411 Revision IS: o6/04/zmm #3 Maximum Design Pressure = -97.5 osf, 0..NEM01etc. Deck: Min. 19/32-inch plywood to meet project requirements to satisfaction of Authority Having Jurisdiction. Base Sheet: GAFGLAS" #80 Ultimal" Base Sheet or RuberoidO 20 Smooth mechanically attached with 11 ga., min. 1.25-inch long ring shank nails through 32 ga., 1-5/8-inch diameter tin caps spaced 4-inch o.c. at the min. 2-Inch wide side laps and 4-Inch o.c. at four (4), equally spaced center rows in the field of the sheet, Cap Sheet: Ruberoid® Mop Granule or RuberoldO Mop Granule FR applied in full mopping of ASTM D312, Type IV hot asphalt at 20 to 25 lbs/square. #4 Maximum Design Pressure = -442.5 psf. Deck: Min. 2,500 psi structural concrete to meet project requirements to satisfaction of Authority Having Jurisdiction Base Sheet: GAFGLAS #75 Base Sheet, Tri-Ply #75 Base Sheet, GAFGLAS #80 Ultima Base Sheet, GAFGLAS Ply 4, Tri-Ply Ply 4 or GAFGLAS Flex Ply 6 applied in full mopping of ASTM D312, Type IV hot asphalt at 20 to 25 lbs/square. Cap Sheet: Ruberoid® Mop Granule or RuberoidO Mop Granule FR applied In full mopping of ASTM D312, Type IV hot asphalt at 20 to 25 lbs/square. 5.6.1.1 For mechanically attached Base Sheet, the maximum design pressure for the selected assembly shall meet or exceed that required under FRSAITRI April 2012 (04-12), Appendix A, Table IA. Alternatively, the maximum design pressure for the selected assembly shall meet or exceed the Zone I design pressure determined in accordance with FBC 1609. In this case, Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1, FM Loss Prevention Data Sheet 1-29 and Roofing Application Standard RAS 117. Assemblies marked with an asterisk* carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements, 5.7 Exposure Limitations: U n' er aym EX Deck -Armor" Premium Breathable Roof Deck Protection, FeltBusterO High -Traction Synthetic Roofing Felt Shingle-Mate3l Roof Deck Protection, StormSafe— Anchor Sheet Tiger Paw' Roof Deck Protection, RoofPro" SBS-Modified All -Purpose Underlayment, Liberty"" SBS Self -Adhering Base/Ply Sheet, 30 StormGuardO Film Surfaced Leak Barrier and WeatherWatcho Mineral Surfaced Leak Barrier VersaShield® Fire -Resistant Roof Deck Protection, Ruberold" Mop Granule and Ruberoid® Mop Granule FR 180 5.8 Tile Slippage Limitations (TAS-103 per FRSA/TRI April 2012 (04-12)): When loading roof tiles on the underlayment in direct -deck tile assemblies, the maximum roof slope shall be as follows. These slope limitations can only be exceeded by using battens during loading of the roof tiles. 4-11tolls_ J, J. T 64'P 6M e tag Staging Meth M o e P Flat Max. 10-tile stack 4:12 RuberoidO Mop Granule Flat Max. 6-tile stack (4 over 2) 5:12 Lugged Max. 10-tile stack 5:12 Ruberold" Mop Granule FR Flat or Lugged Max. 6-tile stack (4 over 2) 5:12 Lugged Max, 10-tile stack 4:12 NEMO ETC, LLC Evaluation Report 01506.04,08-RI8 CertIftcate afAuthorkaflon #32455 6PEDrn0N (2017) FEIC NON-HVHZ EVALUATION FL10626-RI8 GAF Roof Ur Werlayment s; (800)766-3411 Revision l8:06/04/2020 Page 6 of 11 a-. ..__-.-- ._.. ._. .....__.__._ .. .. _.. .... ...... ._ ---._.. .... _ ......... ... ... .. _. .. .. .--- i 6.1 GAF Roof Underlayments shall be installed -in accordance with GAF published installation instructions subject to the Limitations set forth in Section 5 herein and the specifics noted below, 6.2 Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application and prime the substrate (if applicable). 6.3 instal( self -adhering underiayments when ambient temperatures are minimum 45°F and rising. 6.4 All metal surfaces shall be primed with Matri)ff 307 Premium Asphalt Primer or alternate GAF accepted ASTM D41 primer prior to application of self -adhering membranes. .77777777-77 6.5 Deck Armo7�" Premiurei Breathable Roof Desk 4(►rotec#ion 6.5.1 Shall be installed in compliance with the requirements for ASTM D226, Type 1 or Ii underlayment in FBC Table 1507.1.1 or R905.1.1 for the type of prepared roof covering to be Installed, considering the wider sheet -width for double -layer applications. 6.5.2 Fasteners: Minimum fasteners shall be 1-inch diameter plastic -capped corrosion resistant nails or 1-inch diameter plastic - capped, corrosion resistant staples, unless restricted by Code. Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 states: ':..except metal cap nails shall be required where the ultimate design wind speed, V it, equals or exceeds 150 mph.' 6.5.3 Slopes of 4:12 or greater: End (vertical) laps shall be minimum 6-inches and side (horizontal) laps shall be minimum 4-inches. End (vertical) laps shall be offset from course to course not less than 6 feet. Minimum attachment shall be In accordance with FBC Table 1507.1.1 or R905.1.1. Secure end laps 6-inch o.c. When batten systems are to be installed atop the underlayment, the underlayment need only be preliminarily attached pending attachment of the battens. wide rolls) or minimum 25.54nches (for48-inch wide rolls). End (vertical) laps shall be offset from course to course not less than 6 feet. Begin by fastening a full -width along the eaves or install full -width leak barrier. Place a full -width sheet over the starter, completely overlapping the starter course. Continue upslope, maintaining minimum 28.5-inch side laps (for 54-inch wide rolls) or minimum 25.5-inch side laps (for 48-Inch wide rolls), resulting in a double -layer application. Minimum attachment shall be in accordance with FBC Table 1507.1.1 or R905.1.1. Secure end laps 6-Inch o.c. When batten systems are to be installed atop the underlayment, the underlayment need only be preliminarily attached pending attachment of the battens. 6.5.3 Optional, or if required by the Authority Having Jurisdiction: install a leak barrier of Liberty'" SBS Self -Adhering Base/Ply Sheet; StormGuard® Film Surfaced Leak Barrier or WeatherWatch" Mineral Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, Install the leak barrier prior to Installation of the underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the underlayment. NEMO ETC, LLC Evaluation Report 01506.04.08-R18 Certif Cate ofAuthoNzation #32455 0EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R38 GAF Roof Underlayments; (800) 766-3411 Revision 18: 06/04/2020 Page 7 of 11 6.6 Fe7tBuster� High Frctiop Synthetic Roofing Feltirrr TtgeriPaw"" Ropy bdcli Erotedtfbn 6.6.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or It underlayment in FBC Table 1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed, considering the wider sheet -width for double -layer applications. 6.6.2 Fasteners: Minimum fasteners shall be 1-inch diameter plastic -capped corrosion resistant nails or 1-Inch diameter plastic - capped, corrosion resistant staples, unless restricted by Code. Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 states: `...except metal cap nails shall be required where the ultimate design wind speed, Vauro equals or exceeds 150 mph." 6.6.3 Slopes of 4:12 or greater: End (vertical) laps shall be minimum 6-Inches and side (horizontal) laps shall be minimum 4-Inches: End (vertical) laps shall be offset from course to course not less than 6 feet. Minimum attachment shall be in accordance with FBC Table 1507.1.1 or R905.1.1. Secure end laps 6-inch o.c. When batten systems are to be installed atop the underlayment, the underlayment need only be preliminarily attached pending attachment of the battens. 6.6.4 Slopes of 2:12 to less than 4:12: End (vertical) laps shall be minimum 6-inches and side (horizontal) laps shall be minimum 25.5-inches. End (vertical) laps shall be offset from course to course not less than 6 feet. Begin by fastening a full -width along the eaves or install full -width leak barrier. Place a full -width sheet over the starter, completely overlapping the starter course. Continue upslope, maintaining minimum 25.5-Inch side laps, resulting in a double -layer application. Minimum attachment shall be in accordance with FBC Table 1507.1.1 or R905.1.1. Secure end laps 6-Inch o.c. When batten systems are to be installed atop the underlayment, the underlayment need only be preliminarily attached pending attachment of the battens. 6.6.5 Optional, or If required by the Authority Having Jurisdiction: install a leak barrier of Liberty, SBS Self -Adhering vaacr r;y aticcLi awl II IUudUU- rum zurraceu LeaK tsarrier or weatnerwatcri- Mineral 5urtaced Leak Barrier at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, Install the leak barrier prior to installation of the underlayment. Along the rake, Install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the underlayment. 6.7 3toFmfer Anchor SFee# 6.7.1 StormSafe"" Anchor Sheet is limited to use as a mechanically attached base layer In 2-ply underlayment systems. 6.7.2 Fasteners: Minimum fasteners shall be 1-inch diameter plastic- or steel -capped corrosion resistant nails; corrosion -resistant nails & 1-5/8-inch tin -caps; or Drill-Tec screws and plates, unless restricted by Code. Code Reference: The Exception statement In FBC 1507.1.1 and FBC R905.1.1 states: `...except metal cap nails shall be required where the ultimate design wind speed, Vauth equals or exceeds 150 mph." 6.7.3 Starting at the eave, fasten the eave edge and 6-Inch wide end -laps 6-Inch o.c. Fasten in the field of the roll 12-inch o.c. In two, equally spaced, staggered center rows. Continue upslope in a similar manner, maintaining minimum 3-Inch side -laps and minimum 6-inch end -laps. Fasten 6-inch o.c. in the laps and 12-inch o.c. in two, equally spaced, staggered center rows in the field. Ensure all end laps are staggered at least 3-feet apart. One the same day, install Libertym SBS Self -Adhering Base/Ply; 5tormGuard* Film Surfaced Leak Barrier or WeatherWatch" Mineral Surfaced Leak Barrier over the StormSafel Anchor Sheet, MEMO ETC, LLC Evaluation Report 01506.04.08•1118 CertifloateofAuthortcatton#32455 6TMEDiTiON (2017) FBC NON-HVH2 EVALUATioN FL10626-R18 GAF Roof Underlayments; (800) 766-3411 Revision 18: 06/04/2020 page a of 11 N..NEMOletc. 6.8 RtSofPrI'"" SBS NNiodiTtt purpose Uheriaymen#t ngteiMafe� Roof DProtection 6.8.1 Shall be installed in compliance with the requirements for ASTM D226, Type I or 11 underlayment in FBC Table 1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed. 6.8.2 Fasteners: As required in FBC Table 1507.1.1 or R905.1.1 for the type of prepared roof covering to be installed. No hammer tacks or staples are permitted. Code Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 states: "...except metal cap nails shall be required where the ultimate design wind speed, V it, equals or exceeds 150 mph." 6.8.3 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty" SBS Self -Adhering Base/Ply Sheet; StormGuardO Film Surfaced Leak Barrier or WeatherWatch" Mineral Surfaced Leak Barrier at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers, At eaves and valleys, Install the leak barrier prior to installation of the underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the underlayment. `VelrsaShleld� Fire Reslstan#Roof Deck Protection 6.9 6.9.1 Shall be Installed in compliance with the codified requirements for ASTM D6757 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be Installed. 6.9.2 Fasteners: Minimum fasteners shall be 1-inch diameter plastic -capped or metal -capped corrosion resistant nails or 1-inch diameter plastic -capped, corrosion resistant staples, unless restricted by Code. Cade Reference: The Exception statement in FBC 1507.1.1 and FBC R905.1.1 states: `...except metal cap nails shall be required where the ultimate design wind speed, VQ It, equals or exceeds 150 mph." 6.9.3 Slopes of 4:12 or greater: c-al)Aaps-shall-be-minimum-6--inches-and-side-(fiorizonmr)-laMh-all-be minimum 4--inches. nntc(vertical) be offset from course to course not less than 6 feet. Minimum attachment shall be In accordance with FBC Table 1507.1.1 or 11905.1.1. Secure end laps 6-inch o.c. When batten systems are to be installed atop the underlayment, the underlayment need only be preliminarily attached pending attachment of the battens. 6.9.4 Scones of 2:12 to less than 4:12: End (vertical) laps shall be minimum 6-inches and side (horizontal) laps shall be minimum 22-inches. End (vertical) laps shall be offset from course to course not less than 6 feet. Begin by fastening a half -width starter strip along the eaves or install full -width leak barrier. Place a full -width sheet over the starter, completely overlapping the starter course. Continue upslope, maintaining minimum 22-inch side laps, resulting in a double -layer application. Minimum attachment shaft be in accordance with FBC Table 1507.1.1 or R905.1.1. Secure end laps 6-inch o.c. When batten systems are to be installed atop the underlayment, the underlayment need only be preliminarily attached pending attachment of the battens. 6.9.5 Optional, or if required by the Authority Having Jurisdiction: Install a leak barrier of Liberty' SBS Self -Adhering Base/Ply Sheet; StormGuardO Film Surfaced Leak Barrier or WeatherWatchO Mineral Surfaced at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, install the leak barrier prior to Installation of the underlayment. Along the rake, install the underlayment, leaving 6 to 8-inch of the deck exposed, and then install the leak barrier over the underlayment and exposed decking. At other areas, install the leak barrier over the underlayment. MEMO ETC, LLC Evaluation Report 01506.04.08-R3$ Certificate afAuthorizatlon #32455 a EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-RIS GAF Roof Underlayments, IBM) 766-3411 Revision IS: 06/04/2020 N�nnc� � etc. 6.10 Ltber[jr' S)S self Adhe[tnBasPly Sheet 6.10.1 Shall be installed In compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.10.2 The minimum and maximum roof slopes are 36:12 and 6:12, respectively. Back -nailing Is required when slope is 1:12 or greater. Back -nailing shall consist of minimum 1-Inch square or round cap nails spaced 18" o.c. encapsulated within min. 3-Inch side laps. 6.10.3 Nan -Tile ADplicat)OnS Shall be fully self -adhered to the substrates noted in Section 5.6. For direct -bond to deck applications plywood shall be primed with Matrix'"' 307 Premium Asphalt Primer or alternate GAF accepted ASTM D41 primer at % to gallon per square. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2-Inch overhang at eaves and rakes. Roll out sheet and allow to'relax' far min. 30 minutes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch over the eave and nail Into place 12" o.c. Remove the top piece of release film and bond to substrate. install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 1/8-inch troweling of Matrix", 201 Premium SBS Flashing Cement over drip edge. Continue upslope In a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps. Ensure all end laps are staggered at least 18-inch apart. Use a weighted lawn or linoleum roller to ensure complete adhesion to the substrate. Use a hand roller to firmly bond side and end laps. 6.11 :11.1 Shall be installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.11.2 Back -nailing is rec within min. 3-inch side laps. u ar-e-or-ro u nd-c-ap-nails-spaced-18"-0. . Shall be fully self -adhered to the substrates noted In Section 5.6. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2-inch overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. install 1/8-inch troweling of Matrix"' 201 Premium SIBS Flashing Cement over drip edge. Continue upslope in a similar manner; maintaining minimum 3-inch side -laps and minimum 6-inch end -laps. Ensure all end laps are staggered at least 18-inch apart. Use a hand roller to firmly bond side and end laps. 6.12 WeatheriNatch°itnorat Sarfacel'i eak Barrier, 6.12.1 Shall be Installed in compliance with the codified requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for the type of prepared roof covering to be installed. 6.12.2 WeatherWatchO Mineral Surfaced Leak Barrier may be installed as a secondary water barrier using minimum fl- inch wide rolls to seal plywood deck joints prior to Installation of the primary underlayment system. 6.12.3 Back -nailing is required. Back -nailing shall consist of minimum 1-Inch square or round cap nails spaced 18" D.C. encapsulated within min. 4-inch side laps. NEMO ETC, LLC Evaluation Report 01506.04.0"18 Certificate afAutharizatlan h32455 6-EDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R18 GAF Roof Underlayments; (800) 766-3411 Revision 18: 06/04/2020 Page 10 of 11 NNEMOjetc. 6.12.4 Non -Tile Applications: Shall be fully self -adhered to the substrates noted in Section 5.6. Prior to removal of release film, align sheets properly starting at the low -point of the roof (eave) with the selvage edge upslope and for minimum 2-inch overhang at eaves and rakes. Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load requirements. Install 118-inch troweling of Matrix'' 201 Premium SIBS Flashing Cement over drip edge. Continue upslope in a similar manner, maintaining minimum 3-inch side -laps and minimum 6-inch end -laps. Ensure all end laps are staggered at least 18-feet apart. Use a hand roller to firmly bond side and end laps. 6.13 Rubor4d� R7IopPGranyle)Rubefgic#�?Mop Gtanul+ FR ;. 6.13.1 Ruberoid° Mop Granule or Ruberoide Mop Granule FR shall be installed in compliance with current GAF published installation requirements. 6,13.2 For use in tile applications, Ruberoid® Mop Granule or Ruberoid" Mop Granule FR are for use as an alternate to "Mineral Surface Roll Roofing" (ASTM D6380, Class M) in the "Single Ply System" from FRSA/TR! April 2012 (04-12) beneath mechanically fastened the roof systems or the Hot Asphalt applied "Cap Sheet" in the "Two Ply System" from FRSA/TRI April 2012 (04-12) beneath mechanically fastened or adhered tile roof systems. 6.13.3 Fully adhere in ASTM D312, Type IV hot -asphalt to the substrates noted in Section 5.6. Side laps shall be minimum 4-inch and end -laps minimum 6-inch wide, and offset end -laps minimum 3-feet from course to course. Side and end -laps shall be fully adhered In a complete mopping of hot asphalt with asphalt extending approximately 3/8- inch beyond the lap edge. 6.13.4. Consult GAF instructions regarding back -nailing requirements. 6.14 6.14.1 Tile Staging (Ruberoid® Mop Granule,• Ruberoid" Mop Granule FR)- Tile shall be loaded and staged in a manner that prevents the siiopae 4 herein, and GAF published requirements for tile staging. adlLVIlb dlla/UF t-ounter-oauens, as required by the tile manufacturer and FRSA/TRI April 2012 (04.12) must be used on all roof slopes greater than 7:12. Precautions should be taken as needed, such as the use of battens or nail -boards, to prevent the sliding and/or damage to the underlayment during the loading process. YillRi>�1! CI yEME S'= x As required by the Building Official ar Authority Having Jurisdiction to properly evaluate the installation of this product. Contact the manufacturer or the named QA entity for plants covered under Rule 61G20-3 QA requirements, Refer to Section 4 herein for product & production locations having met codified physical properties specifications. UL, LLC. — QUA9625; (847) 664-3281 - END OF EVALUATION REPORT - NEW ETC, LLC Evaluation Report 01506.04.08-R78 Cer0fkote ofAuthodzatlan #324SS 6TMEDITION (2017) FBC NON-HVHZ EVALUATION FL10626-R18 GAF Roof Underlayments; (800) 766-3411 Revision 18: 06/0412020