In-Place Density Test Report
Client:MASTERPIECE BUILDERS UES Technician:Mark Rogers
410 Colorado Avenue
Stuart, FL 34994
Date Tested:12/17/2020
Project:19-2061 MASTERPIECE BUILDERS 2019 MASTER
12772 NW Mariner Court, Palm City
Type of Test:
Area Tested:Elevator Wall and pit footings Field:ASTM D-6938 Nuclear Gauge Method
Material:Backfill Laboratory:ASTM D1557 Modified Proctor
Reference Datum:0 = Bottom of Footing
The tests below meet the 98% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Pass
or
Fail
1 Elevator wall footings 0-1 ft 106.6 12.6 106.3 12.1 100 Pass
2 Elevator Pit footings 0-1 ft 106.6 12.6 105.7 12.0 99 Pass
Reviewed By
GFA International, Inc
Certificate of Authorization No. 4930
John Kent
Senior Project Engineer
STATE OF FLORIDA
Professional Engineer No. 63218