Loading...
HomeMy WebLinkAboutCompaction Test 2020 12 17 - Klein 2104UES Project No: Workorder No: Report Date: 3360.1900024.0000 220766-1 12/22/2020 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In-Place Density Test Report Client:MASTERPIECE BUILDERS UES Technician:Mark Rogers 410 Colorado Avenue Stuart, FL 34994 Date Tested:12/17/2020 Project:19-2061 MASTERPIECE BUILDERS 2019 MASTER 12772 NW Mariner Court, Palm City Type of Test: Area Tested:Elevator Wall and pit footings Field:ASTM D-6938 Nuclear Gauge Method Material:Backfill Laboratory:ASTM D1557 Modified Proctor Reference Datum:0 = Bottom of Footing The tests below meet the 98% minimum compaction requirement. Test No.Location of Test Range Maximum Density (pcf) Optimum Moisture (%) Field Dry Density (pcf) Field Moisture (%) Soil Compaction (%) Pass or Fail 1 Elevator wall footings 0-1 ft 106.6 12.6 106.3 12.1 100 Pass 2 Elevator Pit footings 0-1 ft 106.6 12.6 105.7 12.0 99 Pass Reviewed By GFA International, Inc Certificate of Authorization No. 4930 John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No. 63218 To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1