HomeMy WebLinkAbout2011-0437NotesForResinTanksThe following Information Is needed for the permit application of the actual resin tank permit
which will be a separate permit for the Installation of the tanks, piping and associated equipment
requiring Building, Mechanical, Electrical and Fire reviews:
1) CLARIFY THE TYPE OF MATERIAL BEING STORED. THERE IS A CONFLICT BETWEEN
THE INFORMATION PROVIDED ON THE TANK SCHEMATICS & STRUCTURAL
DRAWINGS 1A FLAMMABLE LIQUID VS. 1C FLAMMABLE LIQUID. (Mg1o] 2.1)
2) PROVIDE THE TANK SIZE (QUANTITY IN GALLONS), TANK DIMENSIONS, PROVIDE
THE DIMENSION BETWEEN TANKS & CONTAINMENT WALLS. PROVIDE SIGNED &
SEALED DOCUMENTS FOR THE TANK & PUMP SCHEMATICS ([A]107 1)
3) NO INFORMATION IS PROVIDED FOR THE HEAT EXCHANGER ON THE STRUCTURAL
ORSITE PLANS. ([A]10721)
4) PLEASE PROVIDE A DETAIL FOR THE BOLLARD INSTALLATION. ([A]10721)
12/8/2020 quinc 12/8/2020 quinc
5) PLEASE CLARIFY NOTE 13 ON THE TANK SCHEMATICS, THE CODE REFERENCES TO
NFPA 30 DO NOT ACTUALLY CORRESPOND TO THE ACTUAL CODE (Mg 10721)