Loading...
HomeMy WebLinkAbout2011-0437NotesForResinTanksThe following Information Is needed for the permit application of the actual resin tank permit which will be a separate permit for the Installation of the tanks, piping and associated equipment requiring Building, Mechanical, Electrical and Fire reviews: 1) CLARIFY THE TYPE OF MATERIAL BEING STORED. THERE IS A CONFLICT BETWEEN THE INFORMATION PROVIDED ON THE TANK SCHEMATICS & STRUCTURAL DRAWINGS 1A FLAMMABLE LIQUID VS. 1C FLAMMABLE LIQUID. (Mg1o] 2.1) 2) PROVIDE THE TANK SIZE (QUANTITY IN GALLONS), TANK DIMENSIONS, PROVIDE THE DIMENSION BETWEEN TANKS & CONTAINMENT WALLS. PROVIDE SIGNED & SEALED DOCUMENTS FOR THE TANK & PUMP SCHEMATICS ([A]107 1) 3) NO INFORMATION IS PROVIDED FOR THE HEAT EXCHANGER ON THE STRUCTURAL ORSITE PLANS. ([A]10721) 4) PLEASE PROVIDE A DETAIL FOR THE BOLLARD INSTALLATION. ([A]10721) 12/8/2020 quinc 12/8/2020 quinc 5) PLEASE CLARIFY NOTE 13 ON THE TANK SCHEMATICS, THE CODE REFERENCES TO NFPA 30 DO NOT ACTUALLY CORRESPOND TO THE ACTUAL CODE (Mg 10721)