Loading...
HomeMy WebLinkAboutCompaction reportUniversal Engineering Sciences tr P� Company ERNATION 11RI,).r aooi- 0,5s>— LIES Project No: 3360.1800067.0000 Workorder No: 220811-1 Report Date: 12/23/2020 60' Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772.924-3575 - F: 772.924.358n In -Place Density Test Report Client: D.R. HORTON, INC. EAST FLORIDA DIVISION LIES Technician: Sean Hayes 1430 Culver Drive, NE Date Tested: 12/17/2020 Palm Bay, FL32907 Project: 18-5043.03 CREEKSIDE 8605 Cobblestone Dr, Fort Pierce, FL 34945 Area Tested: 3234 Trinity Circle, Lot 51 Material: Native Reference Datum: 0 = Top of Final Grade The tests below meet the 95% minimum compaction Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: ASTM D1557 Modified Proctor Test Maximum Optimum Field Dry Field Soil Pass No. Location of Test Range Density Moisture Density Moisture Compaction or (pcf) N (pcf) (%) (%) Fail 1 NW Corner 0-1 ft 112.8 11.4 110.3 11.2 98 Pass 2 SE Corner 0-1 it 112.8 11.4 109.4 10.3 97 Pass 3 Center 0-1 ft 112.8 11.4 110.0 11.3 98 Pass Reviewed By GFA International, Inc Certificate of Authorization No. 4930 Digitally signed J o h n by John Kent Date: Ken t 2020.12.23 13:43:32-05'00' John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No. 63218 To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1