Loading...
HomeMy WebLinkAboutIn-Place Density Test ReportUniversal Engineering Sciences Company �rERNAT{oNP P&-p "�/ ? CC) ;?-00?? UES Project No: 3360.1800067.0000 Workorder No: 220811-5 Report Date: 12/23/2020 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772.924-3575 - F: 772-924-3580 In -Place Density Test Report Client: D.R. HORTON, INC. EAST FLORIDA DIVISION UES Technician: Sean Hayes 1430 Culver Drive, NE Date Tested: 12/17/2020 Palm Bay, FL 32907 Project: 18-5043.03 CREEKSIDE 8605 Cobblestone Dr, Fort Pierce, FL 34945 Area Tested: 3209 Trinity Circle, Lot 68 Material: Native Reference Datum: 0 = Top of Final Grade The tests below meet the 95% minimum compaction regG Tyne of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: ASTM D1557 Modified Proctor Test aximum MDensity Optimum Field Dry Field Soil Pass No. Location of Test Range Moisture Density Moisture Compaction or (pcf) N (pcf) N N Fail 13 South Comer 0-1 ft 112.8 11.4 111.3 11.8 99 Pass 14 North Corner 0-1 ft 112.8 11.4 109.7 10.4 97 Pass 15 Center 0-1 ft 112.8 11.4 110.1 11.1 98 Pass Reviewed By GFA International, Inc Certificate of Authorization No. 4930 Digitally signed J o h n by John Kent Date: Kent 2020.12.23 13:46:00-05'00' John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No. 63218 To establish a mutual protection to universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1