Loading...
HomeMy WebLinkAboutCompaction report&117- 200 a- 00 °/ I UES Project No: 3360.1800067.0000 A Universal WRe o Report Date: 12/2 11-2 20 Engineering Report Date: 12/23/2020 Sciences Company ~rFRNATI�NP 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In -Place Density Test Report Client: D.R. HORTON, INC. EAST FLORIDA DIVISION UES Technician: Sean Hayes 1430 Culver Drive, NE Date Tested: 12/17/2020 Palm Bay, FL 32907 Project: 18-5043.03 CREEKSIDE 8605 Cobblestone Dr, Fort Pierce, FL 34945 Area Tested: 3230 Trinity Circle, Lot 52 Material: Native Reference Datum: 0 = Top of Final Grade The tests below meet the 95 % minimum compaction requirement. Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Laboratory: ASTM D1557 Modified Proctor Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf) N (pcf) N (%) Fail 4 NW Corner 0-1 ft 112.8 11.4 108.5 10.2 96 Pass 5 SE Corner 0-1 8 112.8 11.4 110.2 11.7 98 Pass 6 Center 0-1 it 112.8 11.4 109.9 10.8 97 Pass Reviewed By GFA International, Inc Certificate of Authorization No. 4930 Digitally signed John by John Kent Date: Ken t 2020.12.23 13:44:16-05'00' John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No. 63218 To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1