Loading...
HomeMy WebLinkAboutCompaction Test l / UES Project No: 3360.2000038.0000 A Universal 7 Workorder No: 218900-1 Engineering Report Date: 12/04/2020 Sciences Company 414DF 607 Northwest Commodity Cove,Port St.Lucie,FL 34986 -P:772-924-3575 -F:772-924-3580 In-Place.Density Test Report Client:'COAST TO COAST BUILDERS 01 ORIDA, INC. UES Technician: Amber Evans 2214 SE Tiffany Avenue 1010 Date Tested: 12/02/2020 Port St. Lucie, FL 34952 Project: Port St Lucie CSD/CMT \o9peGo��rl County, eet SV ��1r- Tvae of Test: Area Tested: 8239 Cinnamon Ct. Port St Lucie, Golf Field: ASTM D-6938 Nuclear Gauge Method cart storage addition. Material: Native Laboratory: ASTM D1557 Modified Proctor Reference Datum: 0=Top of Native The tests below meet the 95%minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf) N (pcf) N (%) Fail 1 SW side of pad 0-1 It 104,6 12.2 100.3 11.4 96 Pass 2 NE side of pad 0-1 ft 104.6 12.2 101.2 12.5 97 Pass 3 Center of pad 0-1 ft 104.6 12.2 100.0 Y 12.2 96 Pass Remarks: Below stripped surface 1-2,2-3'HCP=60+,>95%Compaction,PASS.HCP tests are empirically correlated to the relative density of the soil. Reviewed By GFA International,Inc Certificate of Authorization No.4930 !�Digitally signed J o h n f by John Kent Y`Date: Ken}" 2020:1`2�.04 n",, 14:29:06-05-00' John Kent Senior Project Engineer STATE OF FLORIDA Professional Engineer No.63218 To establish a mutual protection to Universals clients,the Public and ourselves,all reports are submitted as confidential property of our clients and authorization for publication of statements,conclusions or extracts from or regarding Universals reports is reserved pending our written approval. Pagel