Loading...
HomeMy WebLinkAbout30 day power release Planning & Development Services Building & Code Regulation Division '2300 Virginia Ave Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 y i Request for 30-Day Temporary Power Release Dae•t Permit Number:7 V& � !� y } • : M , Pro ic(dress:- a 'MCI' THO.Al EASIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DE' PRER t=,FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESL AN IM I4MENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APP REQ�IE 1 IE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: i.; �_; This temporary power release is requested for the above stated purpose only, and there w :i :A occupancy of any type,other than-that permitted by construction'during this time period. "; f�2 As witness by our signatures, we hereby agree-to abide by all tern s and conditions of this 'rF' 9 9 Policy, P y kludin Buildin Division Poli which is incorporated herein b preference. i3 ; If conditions and requirements listed in the attached document entitled"Requirements for � over for Testing"have been fulfilled and the premise is ready for compliance inspection. a il:requests for an extension beyond 30 days must be made in writing to the Building Offici ' e reason for the request., Power may be removed from the site and/or a Stop Work Or& the Final Inspection has not been approved within 30 days. A fee of$100.00 will be requi the Stop Work Order. WE - 1 RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE-C©UNTY, AND THEIR EM ALL ES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE OF -1 RANSACTION,.INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE -DISCOIIEC7ION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMEI 4` U4 a GIVA-UR DATE GEN f7ACTOR SIGNATURE DATE :, .,,.� ;f ELE . CAL'CONTRACTOR SIGNATURE ATE •:;. � � a 7 Ab e6 tment f Permitting oeunty,, FL St: