HomeMy WebLinkAboutOED - KSM - Soil Report LOT 28 (1.13.20)Headquarters: 11345 U.S. Highway 1 If OIL I ENGINEERING Sebastian, FL. 32958 Orlando: I 11VL 723 Progress Way Sanford, FL. 32771 Revised: January 13, 2020 December 31, 2019 AND TESTING Mailing: P.O. Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A. # 5693 KSMengineering.net Matt Basaraba Ocean Estates Drive [[C 9508 Windy Ridge Rd. Windermere, FL 34786 Re: Lot 28, Avalon Beach North Hutchinson Island Fort Pierce, Florida KSM Project #: 195256-b Dear Mr. Basaraba: As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced site. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. A. Site Description: At the time of drilling, the site was fairly flat and cleared. B. Project Description: A single-family residence is planned to be constructed on the site. Loads from the structure will be transferred to the ground by conventional shallow footings. We estimate the maximum loads will be less than 3,000 pounds per linear foot along the wall foundation. Some additional site fill will be required to reach the desired grades. Proudly Serving Florida since 1990 Headquarters: 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando: 723 Progress Way Sanford, FL. 32771 IV 0 Ik I ENGINEERING Lti.IVL AND TESTING Mailing: P.O. Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A. U 5693 KSMengineering.net Lot 28, Avalon Beach -2- December 31, 2019 Fort Pierce, Florida C. The scope of our study consisted of the following: 1. Performed Standard Penetration Test Borings in the proposed construction area to estimate the subsoil relative density. 2. Measured the groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. D. Site Investigation: The site investigation program consisted of performing two (2) Standard Penetration Test borings (SPT), in the proposed construction area. The SRI borings were terminated at depths of 10 to 14 feet below grade. The locations of the borings are indicated on the attached boring logs. The SPT borings were completed in accordance with procedures described in ASTM D- 1586. A standard 1.5 inch ID., 2 inch O.D. split-spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N' value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Proudly Serving Florida since 1990 Headquarters: 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando: 723 Progress Way Sanford, FL. 32771 IV t I ENGINEERING £t iJ .IVL AND TESTING Mailing: P.O. Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A. U 5693 KSMengineering.net Lot 28, Avalon Beach -3- December 31, 2019 Fort Pierce, Florida E. Engineering Evaluation and Conclusions: Based on the information obtained from this site investigation, we are pleased to offer the following evaluation: The boring logs indicate the subsurface soils consist mostly of fine-grained sand. Shell fragments were also found in the borings. "N" values recorded during the boring operation indicate the soil density is generally loose to medium dense. Please refer to the soil boring logs for specific information relative to the soil description. Based on the existing soil conditions, the proposed structure can be supported on a shallow stemwall foundation system provided that the site is properly prepared. The following sections provide recommendations for the site preparation and foundation design. F. Site Preparation: The proposed building area and areas to be paved, plus a minimum margin of five feet beyond the proposed construction shall be stripped and grubbed of surface debris, including vegetation, roots and organic matter. The building area should be graded level and proofrolled. Any soft yielding areas shall be excavated and replaced with clean compacted fill. Sufficient passes should be made during compaction operations to produce a density no less than 95 percent of its modified dry Proctor value (ASTM D 1557) to a depth of two feet. After the exposed surface has been proofrolled, the building and pavement areas may be filled to the desired grades. The fill material shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Place structural fill in loose layers of 12 inches in thickness and compact each lift to at least 95 percent of its modified dry Proctor value. We do not recommend heavy vibratory equipment on this site due to the proximity to the neighboring structures. After excavating for the footings, the disturbed footing subgrade should be recompacted to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by making several passes with a relatively light-weight walk-behind vibratory sled or roller. Proudly Serving Florida since 1990 Headquarters: 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando: 723 Progress Way Sanford, FL. 32771 Lot 28, Avalon Beach Fort Pierce, Florida IV OIL I ENGINEERING 1% AND TESTING -4- December 31, 2019 Mailing: P.O. Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A. U 5693 KSMengineering.net G. Foundation: Provided that our recommendations for site preparation are followed, the proposed structure may be supported on conventional concrete, steel reinforced footings designed for an allowable soil bearing pressure of 2,500 pounds per square foot, or less. With the foundation properly designed and the site properly prepared, we anticipate total settlements less than 3/4 of an inch and differential settlement of less than 1/ of an inch. The majority of the settlement should occur during construction. H. Floor Slabs: A conventional slab-on-grade can be used in the "at grade" portion of the building. We recommend the disturbed subgrade below the floor slab be re-compacted to 95 percent of the modified Proctor maximum dry density (ASTM D 1557) prior to placement of the concrete. An estimated modulus of subgrade reaction of 150 pounds per cubic inch (pci) can be used for design of the slab-on-grade. We recommend that control joints be incorporated in the slab at frequent intervals to control shrinkage cracks. A moisture barrier is recommended beneath the floor slab to prevent moisture migration from the underlying soil resulting in dampness of the slab. Proudly Serving Florida since 1990 Headquarters: 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando: 723 Progress Way Sanford, FL. 32771 Lot 28, Avalon Beach Fort Pierce, Florida W 01k I ENGINEERING JL% tJ AVL AND TESTING -5- December 31, 2019 Mailing: P.O. Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A. # 5693 KSMengineering.net I. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. Environmental conditions, wetland delineation, water quality, and municipal requirements are not a part of this report. We are pleased to be of assistance to you on this phase of your project. When we may be of furthsers'c4o you or should you have any questions, please feel free to contact us. ••... , ,f - 1IU!, t- 'ONA,_ 'IIIIILtI' JEK/jt E-mail to: matt©gelcorp.net Proudly Serving Florida since 1990 C-) <0 0 5 4-3-5 (8) X SS 7-10-11 (21) X SS KSM Engineering & Testing KSIt.1 P.O. Box 78-1377 Sebastian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 BORING NUMBER B-I PAGE 1 OF 1 CLIENT Ocean Estates Drive LLC PROJECT NAME Lot 28, Avalon Beach PROJECT NUMBER 195256-b PROJECT LOCATION N. Hutchinson Island, Fort Pierce, Florida DATE STARTED 12/30/19 COMPLETED 12/30/20 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 5.58 ft LOGGED BY SH/SH CHECKED BY JEK AT END OF DRILLING NOTES See Attached Location Plan AFTER DRILLING A SPT N VALUE A 20 40 60 80 PL MCLL I • I 20 40 60 80 MATERIAL DESCRIPTION o FINES CONTENT (%) 0 20 40 60 80 Brown Sand with Roots \J. 10 Brown Sand 2 Brownish Gray Sand Gray Sand with Some Shell Fragments Gray Sand, Slightly Silty with Shell Bottom of borehole at 14.0 feet. 7-5-3 (8) 3-2-2 (4) 5-7-9 (16) 11-13-18 (31) 12-15-15 (30) X SS X SS X SS SS SS KSM Engineering & Testing KSAl P.O. Box 78-1377 Sebastian, FL 32978 Tel: (772)-589-0712 Fax: (772)-589-6469 BORING NUMBER B-2 PAGE 1 OF 1 CLIENT Ocean Estates Drive LLC PROJECT NAME Lot 28, Avalon Beach PROJECT NUMBER 195256-b PROJECT LOCATION N. Hutchinson Island, Fort Pierce, Florida DATE STARTED 12/30/19 COMPLETED 12/30/19 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 5.92 ft LOGGED BY SH/SH CHECKED BY JEK AT END OF DRILLING NOTES See Attached Location Plan AFTER DRILLING I I----- CL 0 C) <0 0 MATERIAL DESCRIPTION z LU ID I- LU. 0 0 0 A SPT N VALUE A 20 40 60 80 PL MCLL I • I 20 40 60 80 o FINES CONTENT (%) 0 20 40 60 80 Brown Sand with Roots Brown Sand 3-4-4 (8) X SS X SS X Ss SS SS 5-7-7 (14) 5 8-6-5 17 Brownish Gray Sand 5-9-11 (20) Gray Sand with Some Traces of Shell 7-7-10 (17) 10 Bottom of borehole at 10.0 feet. GEOTECH BH PLOTS - GINT STD US LAB GOT - 1/2/20 10.1S- \\KSM-SERVER\KSM FILES\19 DOCS (KSM-SERVER)\1 95256-B.GP OCEAN ESTATES DR LOCATION OF SOIL BORING PROJECT: Lot 28, Avalon Beach, North Hutchinson Island, Fort Pierce, Florida SHEET I OF PERMIT #: PROJECT #: 195256-b IL Ar ENGINEERING £%.iIVL AND TESTING DRAWN BY: C.V. DESIGNED BY: J.K. DATE: 20200102 SCALE: NONE