Loading...
HomeMy WebLinkAbout30-day power release formplanning Development Services IN wilding & Code. Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 7'72462-2165 Fax 772-462W6443 III•I 1 i, r I I•. Date: 12/29/2020 Permit Number: Project Address: Lot 48 - 5177 Armina Place 2008-0603 THE UNDERSIGNED HERBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we heroby agree to abide by all urns and conditions of this agreement, including Building Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document: entitled "Requirements for 30 Day Power for Testing" have been fulfilled and -the premise Is ready for compliance inspection. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued If the Final Inspection has not been approved -within 30 days. A fee of $100.00 will be required to lift the.Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. Ll1CIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH. MAY ARISE NOW OR YN THE.FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT, Kevin Borl�e�ia��� 12/29/2020 DATE ,oseph 5palt 12/29/2020 GENERA TRACTOR SIGNATURE DATE 12/29/2020 ELECT ICAL CONTRACTOR SIGNATURE DATE