HomeMy WebLinkAboutSite Development Permit.pdfDEPARTMENT
December 13, 2019
ST. LUCIE COUNTY
BOARD OF COUNTY
COMMISSIONERS
Ladyko Design Group
4400 Belle Grove Drive
CATHY TOWNSEND
Fort Pierce, FL 34981
CHAIR
DISTRICT 5
Attention: Mr. Richard Ladyko, P.E.
Subject: Site Development Permit
CHRIS DZADOVSKY
Wallaby's Fabrication, LLC, Phase II
VICE-CHAIRMAN
DISTRICT 1
Ref: SPMj-2201915479
SEAN MITCHELL
The Construction Plans signed and sealed December 12, 2019, are accepted for
DISTRICT 2
construction of the site improvements as proposed.
Construction of site improvements is conditioned on the following:
LINDA BARTZ
1. This permit is for phase II new improvements, understanding some minor
DISTRICT 3
modifications are to be implemented within the Phase I, existing area.
2. Prior to commencement of any construction of site improvements, the
FOR shall coordinate a pre -construction meeting including the St. Lucie
FRANNIE HUTCHINSON
County Public Works representatives. Please coordinate through David
DISTRICT 4
Hays at 772-462-1491, haysd@stlucieco.org
3. A set of plans stamped as accepted by the County, together with all other
HOWARD N. TIPTON
applicable permits shall be on site at all times during construction.
COUNTY ADMINISTRATOR
4. Prior to commencement of work, all other agency permits must be
obtained and followed. The more stringent condition of common or
conflicting conditions shall be met. Discrepancies within the plans shall be
DAN MCINTYRE
appropriately addressed and does not relieve the contractor of his
COUNTY ATTORNEY
obligation to construct according to local, state and federal rules and
regulations.
MAILING ADDRESS
5. Site inspections shall be coordinated as established at the Pre-
2300 VIRGINIA AVENUE
Construction meeting. Inspections shall be performed at a minimum for the
FORT PIERCE, FL 34982
following stages:
A. Delivery of pipe and structures prior to installation
PHONE
B. SW structure installations and backfill
(772) 462-1 707
C. Subgrade compaction testing and stringline
D. Base compaction and stringline
TDD
E. Asphalt/paving
(772) 462-1 428
F. Final: after FOR Certification and receipt of as -built survey
6. Any proposed changes to the permitted stamped plans must be approved
FAX
by the County prior to initiating any change in construction. This includes
(772) 462-2362
material changes such as pavement type, type of drainage pipe, etc.
7. Any structure shown or not shown on the plans (such as walls, gates, signs,
columns, etc.) requiring a building permit, such permit shall be obtained
E-MAIL
CHAM BERSG@STLUCIECO.ORG
prior to initiating construction on such structures. This permit does not
authorize the construction of above ground structures.
WEBSITE
WWW.STLUCIECO.GOV
"T. I
December 12, 2019
Mr. Richard Ladyko, P.E.
Wallaby's Fabrication, LLC, Phase II
8. The permittee is responsible for administering the construction contract in accordance with this permit.
If the permittee fails to comply with any part of this permit or any other permit issued for this project by
any regulatory authority, the County may at its sole discretion, cause to cease construction activities on
the site until said permit condition is complied with. A Cease and Desist Order may be issued by the
County Administrator or his designee, and served in an appropriate manner to the permittee or the
permittee's agent. Under no circumstances shall work proceed when a Cease and Desist Order has
been issued until said Order has been withdrawn in writing by the County. If a Cease and Desist Order
is issued, the County, at its sole discretion, may take other action against the permittee and the
permittee's agent(s) for the project.
9. Activities approved by this permit shall be conducted in a manner which does not cause pollution or
allow pollution to exit the site. The permittee is solely responsible for preventing pollution caused by
dewatering water and/or stormwater runoff from the construction site or work area. In addition to taking
its own actions and remedies against the permittee for a permit violation, the County may report each
violation to the South Florida Water Management District, Florida Department of Environmental
Protection, Water Control District (or other Florida Statute Chapter 298 Drainage District, as
appropriate), County Code Enforcement, and other pertinent regulatory or enforcement agencies. No
construction work shall begin until the pollution control and treatment system have been constructed in
accordance with approved permits and plans.
10. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be available on site during
construction. Any necessary change to the SWPPP shall be agreed upon with the County prior to
implementing such change.
11. An `Illicit Discharge Sign' shall be obtained, installed and remain posted continuously during
construction activities. The sign may be obtained from the County Public Works Department at the pre -
construction meeting or by separate arrangement's.
12. An As -Built survey is required along the EOR's certification upon request for a final inspection of the
site and access improvements. A published benchmark utilized for site elevations shall be referenced
for use by other parties, including but not limited to the County.
This permit shall expire as conditioned by the Development Order.
Please do not hesitate to contact me at (772) 462-1491 if you have any questions.
Sincerely,
David A. Hays, P.E., M
Sr. Project Engineer
cc: Patrick Dayan, PE
Grant Chambers, PE
Bethany Grubbs
Monica Graziani
Aimee Cooper
Daniel Kopchak, Wallaby's Fabrication