Loading...
HomeMy WebLinkAboutPursuit Boats - PERMIT 2009-0088 - Fire Sprinkler System Submittal ry W J � z p Q� T— Cf _ W cf) LJ_ .n Ln L4 Ztc I" of b b tz n � fY1 Op ^ y an n Qj Ca -�C Q 4 W w - E o cz o 0 in ti Q O Z 0 0 0 � W ce E 0 � V/ o l�I G G F a iY EXISTING � BLDG. AREA OF 7VVORK PFF Red Yellow Glue Booth Glue Booth p INSTALLATION OF(1)GARMAT OPEN FACE SPRAY BOOTH INSTALLATION OF(1)GARMAT OPEN FACE SPRAY BOOTH KEY PLAN Cabinet Finish Shop INSTALLATION OF(1)COLMET 26'SPRAY BOOTH LU Varnish Booth ❑ Ll .10 LLJ fl iL LU w w rJ; W 61G15-32 . 004 FOR FIRE PROTECTION BOOTHS ( FIRE PROTECTION NOTES: SECTION 61 G15-32.004 w a THE FOLLOWING NOTES SHALL SERVE AS MEETING THE REQUIREMENTS SET FORTH p cc THE FLORIDAADMINISTRATIVE CODE SECTION 61G15-32.004 FOR FIRE PROTECTION ENGINEERING DOCUMENTS FIRE SPRINKLER POINT OF CONNECTION: EXISTING SYSTEM FLOW TEST: OBTAINED FROM FT.PIERCE UTILITIES MICROBIOLOGICAL INDUCED CORROSION (MIC): THE WATER SUPPLY IN ACCORDANCE WITH NA 13-23.15 MAYBE REQUIRED TO DETEMINE THE PRESENCE OF KNOWN MICROBIAL INDUCED CORROSION PROPERTIES. CONSULT OWNER AND/OR AHJ ABOUT ANY KNOWN (MIC) CONDITIONS IN THE PROJECTS WATER SYSTEM AND IF TESTING IS REQUIRED. 0 FIRE PROTECTION KEY BACKFLOW PREVENTION: EXISTING co THE CONTRACTOR SHALL PROVIDE A COMPLETE SET OF SHOP DRAWINGS FOR FIRE a PATTERN DESIGNATION SPRINKLER INSTALLATION FOR THE PROJECT AS INDICATED IN THE DESIGN DOCUMENTS. THE CONTRACTOR SHALL COORDINATE ALL FIRE SPRINKLER WITH ALL OTHER _ CONSTRUCTION DISCIPLINES INCLUDING BUT NOT LIMITED TO HVAC, PLUBMING, ELECTRICAL, STRUCTURAL. THE CONTRACTOR SHALL ALSO COORDINATE THIS ARE SHALL BE DESIGNED TO ORDINARY ANY SPECIAL TESTING REQUIRED BY THE OWNER. HAZARD GROUP II THE SHOP DRAWINGS, INCLUDING HYDRAULIC CALCULATIONS, SHALL SHOW THE SIZES, w 20 GPM! 1500 SQ FT. DENSITY 250 GPM HOSE TYPES AND DIMENSIONAL LOCATIONS FOR ALL FIRE SPRINKLERS, MAINS, BRANCHES, AND PIPING FOR THE WATER SUPPLY TO THE CONNECTION OF THE SYSTEM. LU m z DESIGN CRITERIA: p DESIGN, FABRICATION AND INSTALLATION SHALL CONFORM TO NFPA-13 AND THE FLORIDA FIRE PREVENTION CODE. z THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED AS OUTLINED BELOW 0 OCCUPANCY: SEE DRAWING FOR AREA HAZARD CLASSIFICATION AND DESIGN CRITERIA HAZARD CLASSIFICATION TO BE PER NFPA-13 MATERIALS: SUMMIT DESIGN & FORENSICS ALL MATERIALS ARE TO BE NEW LISTED AND IN ACCORDANCE WITH NFPA-13. 725 PORT ST LUCIE. BLVD. SUITE 203 ISTED AN D INSTALLED IN ACCORDANCE WITH NFPA-1 3 SCOPE OF WORK' PROVIDE FIRE PROTECTION TO EACH OF THE THREE BOOTHS. ALL DEVICESASPRINKLERRS,L VALVES,ARE TO BE UL LISTEDAND INSTALLED PER MANUFACTURES LISTINGS AND NFPA-13 PORT ST. LUCIE, FL34984 SPRINKLER CONTRACTOR TO SUPPLY BOOTH FROM EXISTING OVERHEAD SYSTEM. COMPLETION AND TESTING REQUIREMENTS: BRIAN MASKOL P.E. BOOTH SYSTEMS SHALL INCLUDE ITS OWN CONTROL VALVE, GLOBE VALVE FOR ALL SUPPLY PIPING IS TO BE TESTED BEFORE CONNECTION TO OVERHEAD PIPING. P.E.#66080 - (772) 285-0572 COMPLETE ALL THE REQUIREMENTS OF NFPA-13 CHAPTER 16 "SYSTEM ACCEPTANCE" DRAINING AND PROTECTION IN BOOTH, FILTER BANK AND VERTICAL EXHAUST STACK. ALL EQUIPMENT IDENTIFICATION SIGN'S SHALL BE INSTALLED AS REQUIRED BYNFPA-13 TAMPER AND FLOW SWITCHES ARE TO BE PROVIDED AND INSTALLED. ALL ELECTRICAL CONNECTIONS AND ALARM PANELS ARE BY OTHERS. C0 ry LU J � z p l21� T_ C-L C _ LU Cf) [if SCOPE OF WORK: PROVIDE FIRE PROTECTION TO EACH OF THE THREE BOOTHS. LL SPRINKLER CONTRACTOR TO SUPPLY BOOTH FROM EXISTING OVERHEAD SYSTEM. BOOTH SYSTEMS SHALL INCLUDE ITS OWN CONTROL VALVE, GLOBE VALVE FOR DRAINING AND PROTECTION IN BOOTH, FILTER BANK AND VERTICAL EXHAUST STACK. U11 Ln 4 b 6 � EXISTING CNN 000 THIS AREA SHALL BE DESIGNED TO qj aN .:, � ORDINARY HAZARD GROUP II 00 BLDG AREA OF WORK y .20 GPMI 1500 SQ.FT. DENSITY 250 GPM HOSE ; `'D ^ C- _ r u a Q o w ..� o � = oLn 0 Q r r I r Z 4 _z 4'd" �c r'• � i r _ o W I — KEY PLAN W Px ^L HT FJKTIIRF n W IL7GMT %TIIRG 1' X , _ _ t t t IN t 1 I t I� Iti I� Iu IN IN p" Fri ! R t Yellowe0 Blue Booth I I I I I V INSTALLATION OF(1)GARMAT OPEN b b FACE PRAY BOOTH b -INSTALL/1TION OF(1)GARMAT OPEN I I I 1 I� I� FACE SPAY BOOTH l j I3 is I, l3 I1 I, L IN N IN IN Iti Iw Iti N IN. iN IN I IN 1y I I I 1 I I I I I I M ��;� I I I I I I I Cabineh Finish Shop INTALLA 3 � ^l 3 3 I `` I 3 6SSPRAYT BOOTH ION OF(�)C� T 3 N1L 31 ^�� E' 3 �� 3 3 � 3 W 0000 0- mimms mimms Boom Boom momin mimmm Boom momin mimmm a m 40m EW(Nom ammis Boom immom Fins momin — — — 4J,_ —4mmmm I= Boom it 0­ IN 20010 MINE 0— immom mimms Boom *M Boom mimmm mimmm jowimmom mimmm mm Boom 76— O �r r , ,i N� ,'prMdr➢� ` GffifY�OWJIS'N AI1 [BJ'gllfbll 1 A 1 1'/a 1'a 1 6-5 4' 13/, 4' 6' 1 1 -3/ LO - 1 I 1ir4 r 1 , 1 Series TY-FRB, 5.6 K-factor I s'-5 I 4 1'! 4' 6' lot, Upright, Pendent, and Recessed Pendent Sprinklers — Quick Response, Standard Coverage L Iy I Varnish BaOth TYCO 1/2"ORIFICE, PENDENT SPRINKLER IN IN rJ' IN IN IN IN N' IN IW r�] IN I� r� IN �I - = -"\,I _. 1 - I 7Y FRB,QR, K=S.fi, 155 DEGREE,CHROME Q t n Z fi fl � r,a c W C� U� Fz a ER FIRE PROTECTION 4 I TY FR 1,OR. 0C DEGREE, Eu R , CHROME ME TY-FRB,QR. K=5.6,20C DEGREE, CHROME BOOTHS ( W LA Q r U 6 7 W FIRE SPRINKLER GENERAL NOTES DESIGN CRITERIA CD } C"! CD DESIGN,FABRICATIONAND INSTALLATION SHALL CONFORM TO NFPA 13.(2010 EDITION)AND THE 2010 FLORIDA FIRE PREVENTION CODE. r O CC) A m_ ssN.wsr srgcK OCCUPANCY: IMgKE STACK E%HhIIST STACK BOOTHS-ORDINARY GROUP 2.DENSITY'.20 GPM N 500SQ.FT. MAX.SPRINKLER SPACING 130 SQ.FT. HOSE 250 GPM t Sr STACK WAREHOUSE-EXISTING TO REMAIN d z z r MATERIALS II 81ROSCREEN u Ra wRe o Roo Cc p �;�� ROOF �� ALL MATERIALS ARE TO BE NEW UL LISTED AND IN ACCORDANCE WITH NFPA-13. r�' ALL THREADED TYPE FITTINGS TO BE CLASS 125 CAST IRON,CLASS 150 MALLEABLE IRON OR 300 PSI DUCTILE IRON. W GROOVED FITTINGS ARE TO BE UL LISTED AND RATED FOR 175 PSI SERVICE. � Q BULKAND CROSS MAIN PIPING 2"AND LARGER IS UL LISTED SCHEDULE-10 U j W m THREADED PIPING 2"AND SMALLER ISALLIED XL Q DO z OUTLETS ON SCHEDULE-10 PIPING ARE TO BE WELDED OR MECHANICAL TEE,UL LISTED AND PER NFPA-13. Q Z � ALLHANGERARETO BEULLISTEDAND INSTALLED IN ACCORDANCE WITH NFPA-13 m ALL DEVICES-SPRINKLERS,VALVES,PUMPS,ARE TO BE UL LISTEDAND INSTALLED PER MANUFACTURES LISTINGSAND NFPA-13 0 COMPLETION AND TESTING REQUIREMENTS a t ALLSUPPLY PIPING IS TO BE TESTED AND FLUSHED BEFORE CONNECTION TO OVERHEAD PIPING. THE ENTIRE SYSTEM SHALL BE TESTED AT 200 PSI FOR 2 HOURS. 1 * c * THE INSTALLING CONTRACTOR SHALL COMPLETEALL THE REQUIREMENTS OF NFPA-13 CHAPTER 16"SYSTEM ACCEPTANCE" 1 1 ALL EQUIPMENT IDENTIFICATION SIGN'S SHALL BE INSTALLED AS REQUIRED BY NFPA-13 /� + +IV, TAMPERAND FLOW SWITCHESARE TO BE PROVIDED AND INSTALLED.ALL ELECTRICAL CONNECTIONS AND ALARM PANELS ARE BY OTHERS. V 1 m — �o U) Llf`lf'll'lf"f� f'IL'If�f'lf`lf`l � r�rl�rlrrl ��r1r1�r1 _ � 17.] U) }; F r ILL #11 t. . . . 11