Loading...
HomeMy WebLinkAboutRevisions; Blocking & Pier SetupOFFICE USE ONLY: DATE FILED: REVISION FEE: PERMIT # 2008-0399 RECEIPT # PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE° FORT PIERCE, FL 34982-5652 (772)4624553 �\ o APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION `/+�u�3 Ecu LOCATION/SITE ADDRESS: 325 nettles blvd Jensen beach fl 34957 DETAILED DESCRIPTION OF PROJECT Tuo REVISIONS: Blocking and pier setup due to size of frame on home orginal setup blocking was conflicting with each other they were actual touching CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: CRC005706 BUSINESS NAME: smithomes inc QUALIFIERS NAME: Robert smith ADDRESS: 2903 industrial ave two CITY: ft pierce STATE: fl PHONE (DAYTIME): 7722231179 OWNER/BUILDER INFORMATION: ST. LUCIE CO CERT. #: FAX: NAME: Sokolowski ADDRESS:325 nettles blvd CITY: Jensen beach STATE: fl PHONE (DAYTIME: FAX: _ ARCHITECT/ENGINEER INFORMATION: ZIP: 34946 ZIP: 34957 NAME: LBJ Architectual ADDRESS: 517 sw halkell dr CITY: psi STATE: It ZIP: PHONE (DAYTIME): 800-5700 FAX: SWCC: 9123109 wised 06/30/17 STRUCTURAL NOTES: * SOIL BEARING CAPACITY MIN. 2500 PSF * ALL STRUCTURAL CONCRETE SHALL DEVELOP A MIN. COMPRESS NE STRENGTH OF 3000 PSI AT 28 DAYS. * ALL REINFORCING STEEL SHALL BE GRADE 60 MEETING ASTM SPECS A-615 * MIN. CONC. PROTECTION FOR RE -BARS: FTGS:3" BEAMS: 1\" SLABS: 1" * LAP REINFORCING BARS 30INCHES MINIMUM sm EXPOSURE "C° — 170 MPH 3 SEC GUST 0 O NOTE: THE FOUNDATION/PIER SYSTEM IS DESIGNED TO RESIST FLOOD ELEMENTS OF FLOTATION, COLLAPSE AND LATERAL MOVEMENT PER FEMA CRITERIA FOR EXPOSURE "C" LOCATIONS. ACCESS DOORS TO BE BUILT ON A 1" X 2" OPEN BACK FRAME SECURED WITH #1 O X 2" SHEET METAL SCREWS, WITH A HALF-Z WRAP (#8 X 3/4" TEKS ON THE FACE); DOOR SLAB IS SCREEN DOOR MAINFRAME #10 X 1" SHEET METAL SCREWS INTO AN INTERNAL ALUMINUM CORNER WITH .024 STUCCO COIL FOR THE FACE OF THE DOOR. ATTACHES TO FRAME WITH 2 STANDARD SCREEN DOOR OFFSET HINGES, STANDARD SCREEN DOOR LATCH FOR HARDWARE. . SECTION B-B SCALE: 3/4" = 1'-0" 2X SYP - TIE DOWN STRAP PER SPECIFICATIONS I -BEAM - Ell, XEll, X16"- CBS BLOCK PIERS 4" SLAB W/ RB SEE TIE -DOWN/ PIER REQUIREMENTS CONCRETE THICKENED EDGE: 8"D X B'W W/ (11 #5 RB CONT CONCRETE EXTENSION REQUIRED ALONG ENTIRE LENGTH OF CARPORT (FOR FUTURE IMPROVEMENT) HYDRO VENT (5) THIS SIDE PROVIDE 30X30 ALUM ACCESS �> I PROVIDE 30X30 ALUM ACCESS �> i 4_ h--{--�--i--'1'--�-'a- 11 1 2. ma" 1 ttL3� 1' I II 3�1t I 1 11 1. ,_ 1" P 1I. 3, „ I I „ 1 I- = I 1- 1 1 1 ��07$" GOFN Ti,.,{ �'0U I '1'n�Iq�e 1 I 1 I I I I I I 1 1 I I 1 1 1 I 1 1 I I t 1 d' I I _ I 1 I 1 I I r 1 I it I I I 1 11 1 (� - T T--r'T-T- T-T--r--r r-T'T-^r-T--r--I-'T- . T- -� i i__i_i 1 _L_J__1__L_ _1__L_J__1_ 1_ ,mod I I ,mod 11 1I I5� 1 d I ,_4d 1 „ 1 -� 4 — * -+-- -+-+- +-+--r--+ - - -- - -+-- 'i +- t-- � T�t..—r rr-r-T--r--I--T--r-r-T--r T-T-r-�r--T--r-r-T--r-r-T--r T- �+ 1 3,5,_4a 1 1 _ " I i ,,.4a 1 I 11,_ I I I rill 1 o� ii NDING W/ (4 #5 f IB (DNTINu I - �i' HYDRO VENT k\" PROVIDE 5/8" CEMENT BOAR (5) THM SIDE 1 HOUR WALL SEE STAIR DETAIL ON ZERO LOT LINE SIDE & DECK DETAILS 36" F IGH 3-1 RAIL 39'-0" 1/4" = 1'-0 UNIT TO BE TIED DOWN PROVIDE (2) #9 X 2-1" DECK SCREWS TOE -NAILED :'FA ■ ... .• AT EACH VERTICAL MEMBER SLAB IS EXISTING. CONTRACTOR TO SA OF KNEE WALL COMPLIES WITH MT EXISTING SLAB FOR NEW FOOTINGS. MANUFACTURER'S PERIMETER WAI I LOCKING REQUIREMENT HYDRO VENT _ - -. SEE PLAN 2X4 P.T. SYP KNEE WALL W/ STUDS @ 16" OC W/ Ya"x3" TAP -CONS @ 24" OC 1 — ' [BOTTOM PLATE] W/ g" CDX PLYWOOD W/ 5/8" CEME T BOARD W/ HARDI LAP SIDING — 2�z _ r�(-1-�- II II 03 w Npo MICS2 ANCHOR 5%"AT' WEDGE (SEE DETAIL) ANCHOR (RED HEAD) SECTION A -A C01WAIiNlifFICKENED EUGE: B"D X B"W W/ (1) #5 RB CONT 16 a�jQ5` , II SCALE: 3/4 1'-011 11 TECH )N A/ 1 PART # 59002 STRAP/SWIVEL CONNECTOR FACTORY U WELDED BRACKET FRAME ATTAC MENT FOR FACTORY BRACKETS SOME HOMES MAY HAVE FACTORY BRACKETS WELDED TO THE I -BEAMS FOR LONGITUDINAL ANCHORS. ATTACH THE STRAP/SWIVEL CONNECTOR TO THE FACTORY BRACKETS USING A 2" GRADE 5 BOLT & NUT. ANCHORS/TIES MUST BE INSTALLED TO PROVIDE A 4511 OR LOWER STRAP ANGLE. UNIT WT. 350 LEE. 353 #/I'FF L CONDENSING NIT n� SIMPSON MSTC52 III 1316 BLOCK G 4 COURSE [2) #14 SHEET METAL SCREWS TO CONDENSING [1)y4'X 2Y" LG TAPCDN PER 61-0CK UNR. 200 LB. SHEER & (2) AT CONCRETE: 180 LEE, WORKING CAPACRY PIER DETAIL B-BOLT 5/8°-11 X 23%" I _T --T W/ HEX. SO. NECK W/ NUTS N.T.S. TENSION BOLT LABELED (A) FOR I I FRAME ATTACHMENT ONLY. I _ I %"x7" WEDGE ANCHOR I �I' [RED HEAD] TENSION BOLT LABELED (6) FOR - I I I I I I VERTICAL TENSION. I I I I #10 S.S.S. MIN. L_J \ 2" EMBEDMENT. 4-REQD. MICS2 ANCHOR BY: TIE C)OWN ENGINEEil MAX UPLIFT PER COMPOSITE DEVICE IS 4,750 LBS DECKING HYDRO VENT 151 THIS SIDE LANDING ❑ o ❑ o ❑ o o ❑ 1 C& ____ ____ —__— ____ ____ _--_ — K,; I PROVIDE Yz" MACHINE BOLT THRU I -BEAM W/ (21 TIE DOWN STRAPS AT BOLT (2) MICS2 ANCHORS AT CONCRETE O` AS SHOWN [ (SEE TIE DOWN ENGINEERING FOR AILED INFORMA ] �� ___________Ta -=-gamy ❑ o 0 00 _ ° _ 00 _ ° _ 00 _ ° _ 00 _ ° _ 00 _ --- n 00 n 00 n 00 n 00 0 00 ❑ —� �" 5,�, g„ 4-912„ 4.5�" 4,_�„ 4-5y, 4,_ 4'_5�" 4'_9z" 5 3" Q------- M------� I PROVIDE Yz" MACHINE BOLT THRU I -BEAM W/ (2) TIE DOWN STRAPS AT BOLT (2) MICS2 ANCHORS AT CONCRETE i AS SHOWN (SEE TIE DOWN ENGINEERING FOR DETAILED INFORMATION) _____a_______________ _____ __-�� a El 11 a HYDRIO VENT (5) TOIS SIDE L 1 CROSS HATCHING DENOTES SO. FT. FOR VENT CALC'S HYDRO VENTS IN KNEE WALL TO BE MODEL FS 1608 (80.7 SO. IN. NET) PER 322.2.2. (1) SQ. IN. TYR MULTI -WIDE TIE -DOWN PLACEMENT SCALE, 1/4" = 1'-0" FOR EACH SQ. . OF ENCLOSED AREA. ALL MATERIAL BELOW FLOOD MUST BE CONSTRUCTED T EACH VENT COVERS $° SQ. FT. WITH FLOOD RESISTANT MATERIAL, IN ACCORDANCE WITH PER PRODUCT APPROVAL. 838 SQ. FT. / 80= 10 VENTS SECTION R322 OF THE 2017 (6TH EDITION) RESIDENTIAL BUI PER 408.2. EXCEPTION (1) SQ. FT. SEE sralR DETAIL PER 1500 SO. FT. OF FLOOR ARE WITH VAPOR BARRIER. (1) SQ. FT. = 144 SQ. IN. NET VENT AREA IS 80 SO. IN. x COMPOSITE DECKING 144 / 80 = 2 VENTS ATTACHED GALV DECKK SCREWS AT EACH BEARING POINT POST PICKS RAILING BAS hIT.S: O 2410X 1"NON-CORROSIVE S.M.S. @ EACH PICKET CONNECTION. TOP PLATE TO POST & POST TO CHANNEL W/ #1 O X 1-YZ" S.M.S. TAIL 4X4 SYP POST """" ---- 2X6 SYP DECK JOISTS @ 16" OC 2X6 SYP STRINGER 2X8 SYP STRINGER 2X COMPOSITE DECKINC ATTACHED W/ [2) #1 C GALV DECK FRAMING DETAIL ACHBE BEARICK NG WE AT EACH BEARING POINT SCALE: 1/4" 1'-0" 2X6 SYP STRINGEF SIMPSON W28 AT STAIR STRINGERS TO 2X8 DECK JOIST SUPPORTS OR [21 %' GALV LAG SCREWS AT STRINGER TO POST 4X4 PT POST W/ SIMPSON AB44 SIMPSON FACE MOUNT HANGERLU26 2X COMPOSITE DECKING 2X6 SYP DECK ATTACHED W/ (2) #10 JOISTS @ 16, OC GALV DECK SCREWS AT EACH BEARING POINT FLENGTH VARIES SIMPSON MTS12 -' STRAP 2X8 SYP DECK JOIST SUPPORT W/ (2) %" GALV LAG SCREWS VINYL 2X2 RAIL POST AT GARAGE DECK OR ATTACHED TO VINYL (2) Yz" GALV MACHINE BOLTS AT EXTERIOR DECKS CASTERS X' S.S.S. MIN. 1" CONCRETE J EMBEDMENT. 4-REQ'0. }2" WEDGE ANCHOR W/ 3" EMBEDMENT MIN 2X6 SYP TR NGER m m 1 I #8 GALV SCREWS (2) EACH SIDE 4X4 SYP POST ATTACHED TO GONG W/ SIMPSON AB44 POST BASE B I DECK CONNECTION DETAIL SCALE: 1/211 . 1'-0" STAIR DETAI N.T.S. LDING CODE. 2X12 SYP STRINGER 2X12 SYP STEP 1X8 SYP W/ DECK SCREWS fig" X 3" GALV. HEX SCREWS 4-REO'D. R ISLE APCONS TOAD + 1" NOSE L NOTE: HANDRAIL BRACKETS OR BALUSTERS SHALL NOT BE CONSIDERED TO BE OBSTRUCTIONS TO GRASPABIUTY. BOTTOM OF HANDRAIL SHALL CONTINUE TO SLOPE FOR A DISTANCE OF THE DEPTH OF ONE TREAD FROM BOTTOM RISER. HANDRAIL HAS CIRCULAR GROSS -SECTION W/ 1-Y4" TO 2" DIMENSION. NOTE: GUARDRAIL SHALL COMPLY W/ FBC 2017 (6TH EDITION) arcy SS EV vill TYPICAL ELEVATIONS FOR DECKS CODE COMPLI NCE N-TS. (FOR VISUAL PURPOSES ONLY) ST" LUCIE COUNTY THIS SETUP HAS BERMSCIGNED FOR A FLOOD ZONE INSTALLATION DESIGN CODE FBC - 2017 [6TH EDITION] LB1 Architecture AA20005774 517 SW MALULL A III POPT SAM Luai PL. 54955 772-800-5700 www.16 architPcturl OF PLO tiIr Ord CIO�A 'IF 1p 14248 G� W cr-kip,E ARG�~� 0 II J 0 ®G Q LLJ �0� I— I F— = T�0 lil - v < o ', N O I I DONMEnT DATE. 08.132020 REVIS10115: fly TOM WO&(ss MUT Mir 1 6L4M OmOP7/1tIR (OrAM 09-12020 2 Vn GIAM '. 12222= Co LLJ J Cn LLJ Lij ® CD M _J DD O LU LU ❑ °C Z °c U) 75 D- Ui �CLo If Q Jmt X O Co F- w Sr1l TITLE: FOUNDATION PLAN & DETAILS SMICT nUM CR: FILE COrREVISION