Loading...
HomeMy WebLinkAboutInspection Docs From fax5616880909 1.161.688.0909 Fri Jan 8 12:15:14 2021 MST Page 1 of 1 St Lucie County Inspections 2300 Virginia Avenue Ft Pierce,FL 34982 ,P (722)462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERNIIT# {S(; _ ,>71'` .; JOB ADDRESS 2986 Bent Pine Dr,Fort Pierce,FL 34951-2924 BUILDER GI-10 Homes PEST CONTROL CONTRACTOR HomeTeam Pest Defense,Inc. PEST CONTROL LICENSE# JF0001886 We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 300 Chemicals used: Sentricon Always Active HD bait Percentage of solution: .50% Total gallons used: Pate of treatment: 12/22/20 Time of treatment; AM FBC104.2.6 Certificate ofProteetive Treatrnent for prevention of termites. .4 weather resistant jobs•ite posting board.shall be provided to receive N Footing duplicate Treatment Certificates as each requircd prolective treatment is ®1 st Treatment completed,providing a copy for the person the poermit is iisued to and another copy fur the building permiit f les. The Treatment Certficate shall F.Re-treat provide the proituct used,identity oj'the applicator, time and date of the F, Slab treatment,site location, area treated, chemical used,percent concentration and number of gallons used,to establish a verifiable record of protective F Ist Treatment treatment. If the.soil clietnical barrier method for termite pr'evenllon is used, l`Re-treat final exterior treatment shall be completed prior to final building approval. F-Driveway St Lucie County requires for the finsl inspection for CO,a Permanent. 1 st Treatment Sticker to be placed on the electrical panel box cover,listing all the 1 s Re-treat treatments and dates of applications. F.. Pools F` 1st Treatrnentf„� F_Re-treat Signature of exterminator F Other 1- 1st Treatment F_Re-treat 0 Perimeter for Final Inspection NOTE:There must be a completed jorm for each required treatment or re-treatment and this form must be an the job site to be picked up by the inspector at tune of each inspection or the scheduled inspection will fail and a re-inspection fee charged.