Loading...
HomeMy WebLinkAboutEnergy CodeFORM R405-2017 72 R S DENTIAL ENERGY ONSERVAT1O1Vi CODE DOCUMENTATION CHECKLIST Florida Department of Business. and Professional Regy1al fan RECEIVED Simulated Performance Alternative (Performance) Methc d FEB 0 4 2020 Applications for compliance with the.2017 Florida Buildings Code, Energy Cone lgnyr . unty, Permitting residentla/Simulated Performance Methad shall included ❑ This checklist 0 A Form R405 report that documents that tha Proposed Design complies with Section R405,3 of the Florida Energy Code. This form shall include a surf nary page indicating horrie address, e-ratio. and the pass or fait status along with sum rriary areas and types of components, whether the home was simulated as a worst -case orientation, name aiid version of the compliance software tool, name of individual completing the compliance. report (one page) and ari input summary checklist that can be used for field .verification (usually four pages/may be greater). Energy Performance Level (EPL) Display Card (one:pagre) 0 HVAC system sizing.and selection based on ACCA Manual S or per exceptions provided in Section R403. 7 0 Mandatory Requirements (five: pages) Required prior to. CO for the Performance Method: ❑ Air Barrier and Insulation inspection Component Criteria checklist (Table R402.4:1.1- one page) ❑ A completed Envelope Leakage Test Report (usually one page) ❑ If Form R405 duct leakage type indicates anything other than "default leakage" then a completed Faun: R405 Duct Leakage Test Report (usually one page) �Y W16I2019 10.27:34 AM EnergyGauge@ USA 6.0.02 (Rev. 1 ) - FiaRes2017 FBC 6th-Edition (2017) Compliant Software Page 1 of 1 FORM R406-2017 FLORIDA ENERGY -EFFICIENCY CODE. FOR: BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: Express 2605 Hayden•R PSL 2019 VINYL CARRIER Builder Name: Express Street: 3227 Trinity Cir, FT Pierce Permit Office: City, State, Zip: ST LUCIE , FL, Permit Number: " Owner: Express. Homes Jurisdiction: Design Location: FL, ST LUCIE. CO_INTL County: St: Lucie (Florida Climate Zone 2 } 1. New construction or existing New (From Plans) 9: Wall Types (2750.2 sgft.) Insulation Area 2. Single family or multiple family Single-family a. Concrete Block - Int Insul; Exterior R=4.1 2383.30 ft2 b. Frame = Wood, Adjacent R=13.0 366.69 Az 3. Number of units, if multiple family 1 c. NIA R= ft2 4. Number of Bedrooms 5 d. N/A R= ft2 5: Is this a worst case? Yes 10. Ceiling Types (2605.0 sgft.) Insulation . Area a. Under Attic (Vented) R=30.0 2605.00 ft2 6. Conditioned floor area above grade.(W) 2605.02906273 b. NIA R= ft2 Conditioned floor area below grade (ftz) 0 c. NIA R= ft2 11. Ducts R ftz 7.. Windows(250.0 sgft.) Description Area a. Sup: Attic, Ret: Attic, AH: Second Floor 8 160 a: U-Factor. Dbl; U=0.40 216.00 ft? SHGC: SHGC=0.31 b. U-Factor: Dbl, U=0.61 40.00 ft2 12. Cooling'systerns kBtu/hr Efficiency SHGC: SHGC=0.34 a. Central Unit 41.6 SEER:15.00 c. U-Factor N/A ft2 S.HGC:. 13. Heating. systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a. Electric Heat Pump 45.5 HSPF:8.50 SHGC' Area Weighted Average Overhang Depth: 1:212 ft. Area Weighted Average SHGC: 0:315 14. Hot water systems 8. Floor Types sgft.) Insulation Area a. Electric Cap: 50 gallons .(2605.0 a.'Slab-On-Grade Edge Insulation R 1104.00 ft2 b. Conservation features EF: 0.930=0.0 b. Floor Over Other'Space R=13.0 1064.00 ft2 None C. other (see details) R= 437.00 ft2 15. Credits Pstat Total Proposed Modified Loads: 86.79 Glass/Floor Area: 6.096 PASS Total Baseline Loads: 87.42 I hereby certify that the plans and specifications co v d b Review of the plans and xs sT.q�� calculation are incompliance with the F10i�)� t�spe-cr by this tions comp[ Code V. cal ul tion indicates ance with the Florida Energy Code. PREPARED BY: Before construction is completed' d' DATE: I ' f this building will be inspected for compliance with Section 553.908 I hereby certify that this building, as designed, is 1W nce a, �!�? Florida Statutes. with the Florida Energy Code. 'ref �� COD WE hry OWNER/AGENT. � •ram �� r BUILDING OFFICIAL: DATE: DATE: .. - Compliance requires certification by the air. handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed -in accordance with R403.3.2.1. - Compliance requires an Air Barriers and Insulation Inspection Checklist in accordance with.R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50' (R402.4.1.2). - Complianae_with a proposed duct leakage On requires a Duct Leakage Test Report confirming duct leakage to outdoors, tested in accordance with ANSURESNET/IC'C 380, is not greater than 0:070 On for whole house. 5116/2019 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 5 FORM R405-2017 IMP[ IT• SI.IMMORY 1'-'.141=r <1 IAT RFPnRT -PROJECT - Title: Express 2605 Hayden R,PSL Bedrooms: 5 Address Type; Street Address Building Type: User Conditioned Area: 2605 Lot # 'Owner Name: Express Homes Total Stories: 2 Block/Subdivision: #'of Unfts: 1 Worst Case: Yes PiatBook: Builder Name: Express Rotate Angle: 90 Street: Permit Office: Cross Ventilation: County. St: Lucie Jurisdiction: Whole House_ Fan: City, State, Zip: ST LUCIE., Family Type: Single-family FL, New/Existing: New (From Plans) Comment: CLIMATE J _ Design Temp. 'Int Design Temp Heating Design Daily Temp Design Location TMY Site 97.5 °/u 2.5 % Winter Summer Degree Days. Molsture Range FL, ST LUCIE CO 1N'TL FL_VERO BEACH_MUNI 39 --- 90 70 75 299 58 Medium ' BLOCKS Number Name, Area. ...,: Volume 1 816ck1 2606.029 22403.3 SPACES Number Name Area Volume Ktch`$n :Occupants. ".Bedrooms Infil ID Finished Cooled Heated 1 First Floor I104.012 - 9494.5 Yes 1 1 1 Yes Yes Yes 2 . Second Floor 1561.017 12908.7 No 5 4 1 Yes Yes Yes FLOORS # ..Floor Type Space : _ . - Perimeter Perimeter R-Value Area Joist.R-Value Tile :: Wood Carpet', _ 1.Slab-On-Grade Edge. Insulatio First Floor 157 It 0 1104 fta — 0.8 0 0.2 2 Moor Over Other Space Second Floor — 1064 f? 13 0.8 0 0.2 • 3 Floor over Garage Second Floor _w: 437 IF 13 0.8 0 0.2 ROOF / Roof Gable Roof Rad Solar SA (mitt -Emitt Deck Pitch # Type Materials Aria. .. Area Color Bari Absor. Tested Tested Insul. (deg) 1 Hip Composition shingles 1723 ft2 0 ftz Medium N 0.85 No 0.9 No 0 26.6 ATTIC V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Vented 300 1.54.1 ftz N N 6/16/2019 10:27 AM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes201.7 FBC 6th Edition (2017) Compliant Software Page 2 of 6 FORM R405-20,17 INPUT SUMMARY CHECKLIST .REPORT GEUN!G # . , Ceiling Type Space 11-va€ue Ins Typir Area Framing •Frac Truss Type 1 UnderAttic (Vented) First'Floor 30 Blown 1104 0 0.11 Wood 2 Under Attic. (Vented). Second, Floor 30 Blown 1501 ft? 0.11 Wood WALLS Adjacent Cavity Width. Height Sheathing Framing Solar Below ... , Space -1 N=.>E' -Exterior Concrete. Black - Int InsulFirst Floor "4.11 39 8 8 8 343.8 ft o 0 6.5 0 2 W=>N Exterior Concrete Block - Int InsulFirst Floor 4.1 36 8 8 8 317.8 ft2 0 0 0.6 0 -3 S-W Exterior Concrete Block- int. lnsul •Fast Floor 4.1 11 4 8 8 98.2 ft2 0 0 0.5 0 - 4 S=>W Exterior Concrete Block - Int InsulFfrst Floor 4.1 6 8 8 8' 57.8 ft2 0 0 0.6 0 5 E=>S Ex€edor Concrete Block - rnt InsulFirst Floor 44.1 2.0 0 8 8 173.3 W 0 0 0.5 0 6 S=>W Garage Frame - Wood 'First Floor 13 211 8 8 8 167.8 ft? 0 0.23 0.5 0 7 E=>S Garage Frame - Wood First Floor 13 20 8 8 8 179.1 ft2 0 0.23 0.5 0 8 W;z>E Exterior Concrete Block - Int Ins&cond Floor 4.11 39 8 8 8 343.8 ft2 0 0 0.5 0 9 W=>N Exterior Concrete Black- Intlns&7econd Floor 4.1 40, & 8 8 352.4#t2 0 0 0.5 0 _10 S=>W Exterior 'Concrete Block= Intlnstilecond Floor 41A 39 8 8 8 343.8 ft2 0 0 0.5 0 11 E=>S Exterior Concrete Block - Int Ins6lecond Floor 4.1 40 8 8 8 352.4 ft2 d 0 6.5 0 DOORS - # Ornt Door Type Space: Storms- U Value efghtin Area Ft in -In Ft 1 S=>W. Insulated FirstiFloor None 4 3 6.... 8 20ft2 2 E=>S Wood First Float Nane .39 2 8 6 8 17.8 ftz WINDOWS Orientation shown fs the entered orfentatbn _> changed to Worst Case, Wall Overhang V # Ornt ID Frame Panes NFRC U-,Factor SHGC I mp Area Depth .Separation Int Shade Screening 1 k-E. 1 Vinyl Low-E Double yes, 0.4 0o31 N ' 46.6 ft2 1. ft 0 in 11 ft 0 n Drapes/blinds None, 2 N=>E 1 Vinyl Low-E Double Yes 0.61 0.34 N 40,0 ft2 2 ft 0 in 1 fi 0 in Drapes?blinds None 3 S=>W 3 Vinyl Low-E Double Yes 0.4 0.31 N 31.0 ft2. 1 ft 0 in 11 ft 0 in Drapes/blinds None 4 S=>W 4 Vinyl Low-E Double Yes. OA 0.31 N 2.5 ft2 6 ft 2 in 2 ft 0 in None None 5 N=>E 8 Vinyl Low E Double Yes 0.4 0.31 N 62.0 ft2 1 ft 0 in 1 ft 0 in Drapes/blinds None 6 S=>W 10 Vinyl Low-E Double Yes 0.4 0,31 N 62.0 42 1 ft ein 0 ft 0 in DrapesJblinds. None: 7 S=>W 10 Vinyl Low-E Double Yes [1.4 0.31. N 6.0 ft2 1 ft 0 in 0 ft 0 in Drapestblinds None GARAGE # EloocArea.. Ceiling Area. Exposed Wall Perimeter. Avg. Wall Height Exposed Wall Insulation 1 436,872 ft2 436.872 ft2 64 ft 8.6 ft 13 51.16/2019 10:27 AM EnergyGaugeQ USA 6.0.62 (Rev. 1) - FlaRes2017 FBG. 6th Edition (2617) Compliant Software Page 3 of 5 FORM R405-201' p►�DI IT c1 itsnnnnQv+u�nvl ITT o�n.,�... - INFILTRATION # Scope Method SLA CFM 5t> ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) 000383.. 2613-7 14$.49 269.85 1!8 7 HEATING SYSTEM # System Type Subtype .. :.: 'Efticlency Capacity Black Ducts 1 Electric Heaf Pump/ Split - H9PF:.6.6' 45.6 kBtAr 1 sys#'1 COOLING SYSTEM # System Type Subtype Efficiency. Capacity Air Flow SHR Block Ducts 1 Central Unit/ None SEER: 16 47.5 kBtu/hr 1425 cfm 0.73 1 sys#i HOT WATER SYSTEM #... -System, Type •SubType Location EF . Cap Use SetPnt Conservation _. 1 Electdc None Garage. 0.93 50 gal- 70 gal 120 deg None SOLAR HOT WATEWS'YSTEM . FS G Cert # Company Name Collector System Made! # Collector Model #:. Area ,,..... . Storage Volume FEF None: None .. ft° bUCTS / '.` Supply =- V # Location R-Value Area - Return --- Air CFM 25 .CFM25 ` Location. Area., Leakage Type. Handler TOT OtJT QN RLF -- HVAC # Heat Coo( 1 Attic,. 8 . 160 ft2 Attic 65 fta. Proposed Qn Second Flo -- cfm 182.4 cfm, 0:07 :.0.50 1 1 TEMPERATURES Programable Thermostat: Y Cooling Jan [� Feb' Mar Heating (X] Jan (XI Feb f X�, Mar 'Venting [ ] Jan Feb X Mar Ceiling [ ] Apr- May Jun Jul Aug Sep I J Apt Mel Jun 11 Jul r [x] � Aug rlSep �X� Oct htov Oct Oct X� Nov - Dec Dec 5/16/2019 10:27 AM EnergyGauge® USA 6:0.02 (Rev. 1) - FlaRes2017 FBC-6th Edition (2017) Compliant Software Page 4 of 5 FORM R405-2017 INPI IT Al IMMARV rWI=rtJV 1--ftT 12;=OhQT- 3' omostieschedulia': HERS: 2006 Rciferende Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WO) a AM 78 78 78 �8 78 78 78 78, so 8 so so . I :pM 80 80 78 78 78' 78 78 78 78 78 78 78 Cooljng,(WF-H) AM- 78 78- 78 78 78 78 781 18 78 78 78 78 PM 78' 78 78 78 78 78 78 78 78 78 78 78. Heating (VVD) AM 86 66 66. 66 66 Be 68 68 Ge 68 68 'es PM 68 68 68 68 68 68 68 68 68 89 66 68 'Heaflnq (WEH) AM 66 66 66 66 66. 68 68: 68 68 68, 68 68 PM -68-1 68 68 68 68 68 68 68 68 68 66 66 MASS Mast Type Area T I hidnbss' Furniture Fraction Space Daftiult(8 lbsisq:�ft'. 0 W Oft 0.3 First Floor 0 ft, Oft 0.3 866ond Floor 5/16=1 9 1 V,27,AM EnergyGauge@) USA 6.0.02(Rov. 1) - FlaRes2017 F80,6th Edition (2017) Comp!lant Software Page 5 of 5 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPQ DISPLAY CARD ESTIMATED ENE MY PERFORMANCE INDEX* = 99 The lower the Energy Performanoe Index, the moreVIRielent the 146the. 1. New home or, addition 1. New (From Plans) 12. Duct-s; location & insulation level a) Sqpply ducts R 8.0 2. Single-family ormultiplem-family 2. Sincile-family b) Return ducts R� 8.0 c) AHU location Second Floor 3. No. of units (if multiple -family) 4. Nurinb& of bedrooms 4. 5 5. Is.this a Worst case? (yes/no) 6. Yes 6. Cbriditlon,ed.floor area (sq. ft.) 6. .2605 7. Windows, type and: area 6) q4actor:(weighted dVdrap) 7a. 0.434 b)'Solar Heat Gain toeffl'61e-n't'(SHGQ 7b. 0.315 .315 6) Area. to.' 250.0 8. Skylights q) U4actor:(weighted average) Ba. - NA b) Sblar.Heat. Gain Cdeffidi6ht (SHGC) 86. 9. Floor type, insulation level: a,j:Slzib-on-grade (R.-value) ga. 0.0. b) Mood, raised (R-value) 9b- c) Concrete,- raised (R-value) 9c. 10. Wall type and insulation: A. Exterior: ulation R-value) 1. Wood frame (insulation I0Al. 2. Masonry (Idsulitidn R-Value) I GA2. 4.1 B. Adjacent; 1. W6od.frarrie (insulation R- ' value) 101. 113.0 ,2. Masonry (Insulation. RmvalUO 10B2.- 11. Ceiling type and insulation level a) Under attic I Ia. 30.0 b) Single assembly cy Khee,walls[skylight Walls Ile. d) Radiant barrier installed Ild. No 13. Cooling system: (japacity.�7.5 a.)'Split zyste�rfi SEEF�_ b) Single package SEER- c),:Qround[water source SEER/COP d):.R66munit1PTAC: EER a) Other 15.0 14. Heating system: Capacity 45.5 a) Split system heat pump HSPF ..8.5 b) Sirigle, package heat pump HSPF_� c).Efectric resistance COP d)Gas furnace, natural gas AFUE a): Gas:f4ma.ce, LPG AFUE_ � Other 15. Water heating system a) Electrtc resistance EF0.93 b) Gas.fired, natUral gas EF-�_ c) Gas fired, LPG EF d): Solar system with tank EF e,), Dedicated heat pump with tank. EF- 0 Heat rebovOry Unit HeatRecl/a g), Other 16. HVAC credits claimed (Pedbrmahbe Method) a) Ceiling tans b) Cross ventilation Whole house fan No Multizone, cooling credit e) Multizone. heating credit 0 ProgfarriftiabiLa- thermostat Yes, *Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if, not DEFAULT. I certify that this, home has complied. With the Florida Building Code,, Energy Conservation,.tKrough the above energy rgy . caving, featured which will bd installed (or excedd6d) in this home befordt fihalinspectlori. Otherwise, anew EPL display card Will be completed based on installed code compliant features< Builder Signature. Z�),�;� Aa4,,2l�L9 Date-, 1/15/20 Address of Now Home: 3227 Trinity Cir. FT Pierce City/FL Zip: STLUC1E,FL 51-16/2019 10:27:40 AM EnergyGauge(D USA 6.0.02 (Rev. 1) - F,IbRes2017 FEC 6th Edifida (2017) Compflant Sdftira Page 1 of 1 Florida. Building Code, Energy Coi serva#ion, 6th Edition (2017! Mandatory Requirements for Residential' Performance,: Prescriptive -and ERI Methods ADDRESS; Permit Number: - St LUCIE , FL , IVJMI'V I .A I VKT Kr_tAUlFFtn LN1. b See. individual code sections for full details. V SECTION R401 GENERAL © 14401.3 energy Performance Levef (EPL) display card (Mandatory). The building official shall require that an energy perormance level (EPL) display card be completed and certified by builder to b4 accurate and correct before final approval -of the. building for occupancy. Florida law (Section 553 9085, Florida Statutes)' requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the.energy performance -level. and efficiencles of components instalted in a dwelling unit. The building 6fficial7sttall verify that the EPL display card completetl and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card;can be found in Appendix RD, E R402A Air leakage (Mandatory). The building .thermal envelope shall be: constructed to limit al ' leakage_ In accordance with the requirements of Sections_ RA02.4.1 through R402.4:5. Exception: Dwelling units of 11-2 0ccupancles and Multiple attached single family dwellings shall be permitted to comply with Section C402.5: © R402.4.1 Building thermal enveloTte building thermal envelope -shall comply with Sections R402.4.1.1 and-R402.4.1.2. The:sealing methods between dissimilar materials shall allow for differential expansion and 'contraction. 11402.4.1.1 Instailation.The components of the building thermal envelope as listed. in•Table R402.4.1.1 shall be installed in accordance with the. manufacturer's instructions:and the criteria listed in Table R402.4.1.1 as applicable to the method of construction. Where required by fife code,offlcial,-ah approved third party shall inspect ail components and verify compliance. R402.4.7:2 Testing. The building or dwelling unit shall be tested and verified -as having an air leakage rate not exceeding seven air changes per hour in Climate Zones 1 and 2, and three airchanges.per hour in Climate Zones 3 through 8. Testitigahall be -conducted in accordance with ANSURESMET%ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shalt be conducted by either individualvas defined in Section'553.993(5).ot (7); Florida Statutes, o individuals licensed ,as set forth in Section 489.105(3)(i), (g) or (i) or an approved thud party. A written report of.the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any after creation of all penet a'tions of -the building thermal envelope. - Exception: Testing is not required for additions, alierationsi renovations, or repairs, of the building thermal envelope of existing buildings in which the new construction is less'than 85 percent of the building thermal envelope. During testing: 1. Fader'ior windows and doors,'fireplace and stove doors shall be closed, but not sealed; beyond the intended weatherstripping -or .;. other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed,'but not sealed beyond intended infiltration'cohtrol treasures. 3. Interior doors, if installed at the time of the test, shall be. open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooiing systems, if installed at the time of the test, shall be turned off. 6. Supply and retuin registers, if installed at the time of the test, shall 'be- fully open. E] R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight -fitting doors on -masonry -fireplaces, the doors'shali be.listed and labeled in accordance with UL 907. R402.4.3 Fenestration air leakage -Windows, skylights -and sliding.glass.doors shall have an air infiltration rate of no more than 0.3 cfrn per square foot (1.5 Uslm2),. and swinging doors no more than 0.5 cfm per square foot (2.6 Usfm2), when tested according to. NFRC 400 or AAMAI WDMA/CSA 1A1/i.S.2/A440 by an accreditetl; independent laboratory:and:listed and labeled by the manufacturer. Exception: Site -built windows, skylights and doors. 5/1612019 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) -. FlaRes2017 FBC 6th Edition (2017) Compliarit'Software Page 1 of 5 MANDATORY REQUIREMENTS (Continued) ❑ R402.4.4 Rooms containing fuel-burriing,appliances: In Climate lanes 3 through 8, where operi combustion air ducts provide combustion air to open combustion fuel burning .appliances, the appliances and combustion ale opening shall be located outside the building thermal: envelope or enclosed in.a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requireinents Of Table R402.1.2, where the -walls, floors and ceilings shall meet not less than the basement wall R-value requirement.. The, door into the roomshall:be fully gasketed and any water lines and ducts in the room insulatedin accordance with Section R403. The combustion air.duct shall be insulated; where it passes through conditioned space to a minimum of R78. Exceptions: Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. Fireplaces:andIstoves�complying with: Section R402.4.2 and Section R1006.6f the Florida Building Code, Residential. ❑ R402.4.5 Recessed lighting. Recessed luminaires installed in the buitdng thermal envelope shall be. sealed to limit air leakage between conditioned=and unWric ition6d spaces. All recessed.luminaires-shall tie IC4ated and labeled as having an air leakage rate not more than 2.0 dM (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. Allsecessed luminaires shall'be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. R403.1 Controls. SECTION R40�3 SYSTEMS R403.1.1-Thermostat provision;(Maildatory). At least one thermostat shall be provided for each separate heating and cooling system. 11403.1.3 Heat pump supplementary heat (Mandatory). Heat p0ios having supplementary electrl(wesistance heat shalE have controls that, except d6drig defrost, prevent supplemental heat operation when they beat pump compressor can meet the heating load. R403.32 Sealing (Mandatory) All ducts, air handlers,,fi€ter boxes and building cavities that form the prirpary air containment passageways forairdistribution systems shall be considered ducts:or plenum chambers, shall be constructed and sealed in accordance with section C463:2.'9.2 of the Gominercial Pfovislons of this code and.shaltbe shown to meet dactt ghtness criteria below. Duct tightness shall be verified by testing .in:accordance. with ANSWRESNET/1CC.380 by either individuals as oeflned in section 553.993(5) or (7) Florida Statutes, or individuals. licensed as set forth in Section 489.105(3)(f), (g) or. (1), Florida Statutes, to be °'substantially leak free".in accordance with Section R463:3;3: R403.3.2.1 Sealed air handier. Air handlers shall have a manufacturer's designation for an air: leakage of no more than 2: percent a of the design airflow rate when tested in' accordance with ASHRAE 193. R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine -air leakage by one of the following methods: 1. Rough -in test: Total leakage shallbe measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the systeat[, including the manufacturer's air handler enclosure if installed at time of the test. All registers shall be taped or otherwise: sealed during; the test. 2. Postconstruction test: Total leakage shall. be.measured with a pressure differential of 0.1 inch.w:g. (25 Pa) across the entire system, including the manufacturer's air handier enclosure. Registers shalt be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage, test shalt not be. required where the ducts and air handlers are located entirely. within the building thermal envelope. 2. Duct testing -is not mandatory for buildings, complying by Section 406 of this code. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. ❑ R4'03.3.5 Building cavities (Mandatory): Building framing cavities shall not be used as ducts or plenums. R443.4 Mechanical system piping Insulation (Mandatory), Mechanical system.piping capable of.carrying fluids above 105'F (41°C) or below 55'F (13°C) shalt be'insulated to a minimum of R-3. R403.4.1 Protection of piping insulation. Piping insulation exposed to weather; shall be protected from damage, including that caused,by sunlight, moisture, equipment maintenance and wind, and shall provideshielding from solar radiation that can cause degradation, of the,material. Adhesive tape shall trot be pe4nifted. R403.5,1 Heated water circulation and temperature maintenance systems (Mandatory). Heated water circulation systems:shall be in accordance with Section R403.5,1A. Heat tracetemperature Malntenanc6 'systems shall be In accordance with Section 114031.1.2: Automatic controls, temperature sensors and pumps shalfbeaccessNe. Manual controls shall be readily accessible. R403:5.1.1 Circulation systems. , Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall be a dedicated return pipe or a cold water sup pipe..Gravity and fhe'[mosiphoii circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the ' Ump based on the identification of a demand for hat water within the occupancy. The controls shall automatically. turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. 0 . R403:5.1.2 Heat trace systems. Electric heat trace systems.shall comply with IEEE 515.1 or UL 515. Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature io the piping in accordance with the times when heated water is used in'the occupancy. 5/16/2019 10:27 AM ErWgyGaugeO USA 6.0.02 (Rev: 1) - FlaRes2617 FBC 6th Edition (2017) Compliant Software Page 2 of 5 MANDATORY REQUiREMENTS. (Continued) R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps. installed on both the inlets and outlets. External heat traps shall. consist of either a commercially available heat trap or a downward and upward bend of at least 3 % inc6es"(89 mm) in the hot water distribution line and cold water line located as close :as possible to the storage tank. R403.6.6 Water heater efficiencies (Mandatory). R403.6.6.1.1 Automatic controls. Service water -heating systems shall be,equipped with. automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting range "shalt be from 100°F to 140T (38°C to 60°C). ® R463.5.6.1.2 Shut down: A separate switch or a clearly. marked circuitbreaker shall be provided to permit the power supplied to electric service systems to be turned.off_A separate valve shall be provided to permit the energy supplied to the main bumer(s) of combustion:types of service water -heating systems to be turned off. ® R403.5.6.2 Water=heating equipment Water -heating equipment installed in residential uriit`s shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code,. Ene€gy Conservation; Commercial Provisions; for the type of equipment Installed. Equipment used to provide heating functions as part of. a combination system shall satisfy all stated requirements for the appropriate water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1. R403.5.6.2.1'Solar. water -heating systems. Solar systems for domestic hot water production are rated• by the annual solar energy factor of the system; The solar energy factor of a system shall be determined'from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors sliall.be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors, and'SRCC Standard TM-1, Solar Domestic Hot Water System and Component. Test Protocol. Collectors in ins talled'solar waterheating systems should meet the following criteria: 1. Be Installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and 2. Be installed at an. orientation within 45 degreesaf true south. a R403.6 Mechanical_ventitation (Mandatory). 'The building shall be provided with ventilation .that meets the requirements of the FloridaBuilding Code, Residential, or Florida", Building Code, Mechanical, as applicable, or with, other: approved means of ventilation including: Natural, Infiltration or. Mechanical means'. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system; is not operating. t—t 111403.6.1 Whole -house mechanical ventilation system fan efficacy, When installed to function as a whole -house mechanic_ al ventilation system; fans shalt meet the efficacy.requirements of'Tab[e'R403.6.1. Exception: Where whole -house rnedhanical ventilation fans are integral to tested and listed HVAC equipment, they shall be powered by an electronically commutated motor. i-"i R403.6.2 Ventilation air. Residential. buildings designed to be operatedat a positive indoor pressure or for mechanical ventilation U shall meet thefollowing criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided'to conditioned space from attics, crawlspades, attached enclosed garages or outdoor -spaces adjacent to swimming pools or spas. 3. if ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment (Mandatory). R403.7.1 Equipment sizing, Heating and.cooling equipment shall be sized in accordance with AC.CA Manual S based on the equipment loads calculated in accordance with.ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described' in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local'intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems..New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is Installed. - TABLE R403.6.1 WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM' (CFM) MINIMUMEFFICACY a _ (CFMtWATT) AIRFLOW RATE MAXIMUIV (CFM) Range hoods Any 2.8 cfm/watt Any In -line fan Any 2.8 cfnilwMtt. Any Bathroom, utility room 10 1.4 cfm/watf <90 Bathroom, utility 90 2.8 cfm/watt Any For SI: 1 cfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916 5/16/2019 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software, Page 3 of 5 1VIANDATQRY RE..ENTS (Continued) © 11403.7.11.1 Cooling equipment capacity. Cooling only equipment shalt be selected so that its total capacity is not less than the calculated total load but nat more than 1.15 times greater'than.the total load calculated according to the procedure, selected In Section 403.7, or the closest available size provided' by the manufacturer s,pradtrct lilies. The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The. published value forAHRI total capacity is a nominal, ratingwtest value and shall not tie: used for equipment sizing; Manufacturer's expanded -performance data shall be used to select cooling-bnly equipment. This sefecilon shall be based on the outdoor design dry-bulb. temperature for the toad calculation (or entering wafer terperature'for water -source equipriient), the blower CFM'prWded by the expanded performance data, the de§igii value for entering wet -bulb temperature and the'deMgn value for entering dry-bulb temperature. Design values for entering wet -bulb and dry-bulb ternperaturos. shalt be for the indoor drybulb and relative humidity used for the load calculation and shall be adjusted -for return side gains If the return.duct(s) is installed in an unconditioned space. Exceptions:. 1. Attached`- srr gle= and multiple -family residential equipment sizing may beselected so that Its cooling capacity hi less than the calculated total sensible load but not less than 80 percent of that load. 2.. When .signed and sealed by a.Florida-registered engineer, in attached sfngt6- and multfple4amily units, the capacity of equipment may be sized in accordance with good design practice. :R403.T.T.2 Heating equlprnent capacity. t t R403.7 J.2.1 Heat puierps. feat pump sizing shall. be based on the coaling requirements as calcufatedl according to Section t_€ (4031.1.1, and the heat prcmp total cooling capacity shall €iot be.more than -1.15 tiies.greatertha. tha design'cbeling load even'if the design Beating toad ls'1.15 tires greater than the design cooling foal. I-1 R403:71.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design LJ requirements calculated .according to the procedure selected in Section 9403.7.1. El - R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural, draft atmospheric burners. shall not be less than the: design load calculated in aceordarice wjth Section R403.7.1. R403.7.1.3 Extra capacity required for special occa"slons. Residences requiring excess cool€ng: or heatingequIpTgnl capacity on an intermittent basis', such as•anticipate d additional loads -caused bjrrMjor entertainment events, shall have 64� fprr►ent sizedor controlred'to prevent continuous space coolingOr heating within that space by one or more ofthe following: options: 1: A separate coaling or heating system is utilized to provide cooling be heating to the major entertalament areas. 2. A variable capacity system sized for optimum performance during base load,pertods is: utilized. R403.8 Systems serving muftiplo dweffing units (Mandatory): Systems serving muld1P le dwelling units shall coinofy with, Sections. C403 and C404 of the IEt C—Corrfrnerc€al Provisions in lieu of Section R403. 12403.9 Snow melt and ice system controls (Mandatory) - Snow= and ice melting systems, supplied through energy sorvfce' to the building, shall include automatic controls capabfe of shutting off the.systern when the pavement temperature Is above 5W (10°'0), and no precipitation Is falling and an.arltomoltic or manual control €hat: will allow shutoff when fhe,outdoor temperature is afaove 40aF (4.8°C). O R403.10 Pools and permanent spa energy consumption (Mandatoryl.. The energy consumption of profs. and permanent spas shalt be in accordance with Sections R:403.10.1 through R40a.10.5. R403,10.1 Heaters. The electric power to heaters shall be controlled by'a readily accessihre on -oft switch that is. an integral part. of the heater mounted on the exterior of the heatesi or external to and within 3 feet (914 milt) of fFte heafer 00draffon of such switch siiall not change the setting of the heater thermostat i Such switches shall be in addition.to. a c rccr t breaker for the power to the heater. Gas -fired heaters shall not be equfpped with continuously burning ignition pilots, R403.10.2 Time switches. Time'switches or other control methods that can automatically tum off'and on according to a. preset schedule shall be installed for heaters and pump motors. Heaters and pumpmotors-that have built-in time switches shall be in cornplrarice: with this section. Exceptions: 1: Whete public health standards require 24-hour purrtp operation. 2. Pumps that operate soias and•waste-heat-recovery pool heating systems. 3. Where pumps are powered exclu_siveiy from on -site renewable generation. F, R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant: cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Euceptlon: Where more than 70 percent of the energyfor heating, computed over an operation season, fs from site -recovered energy, such as from a heat pump orsofar energy source covers or other vapor-retardant.rneans shall not be regrvfred. R403.10.4. Gas acid all -fired pool and spa heaters. all gas- and 614 red pool and spa heaters afrall have a minimum thermal efficiency of$2 percent for heaters manufactured on of after April 16, 2013, when tested in accordance with ANSIi Z 21.56: Pool heaters fired by natural or LP gas 'shall not have continuously burning pilot lights. 5/16120/9 10.27 AM EnergyGaugeO IISA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2o17) Compliant Software Page 4 of 5 R403:10:5 Heat:puinp pool heaters. Heat pump pool heaters shall have.a minimum GOP of 4.0 when. tested in accordance with AHRI 1160, Table.2, Standard xiatih Conditions Low Air Temperature. A test report f'rom'aii independent laboratory is required to verlfy procedure compliance. -Geothermal swimming pool heat pumps are not requi e.d:to-meet this standard. ® R403.11 Portable spas (Mandalor0 a energy consumption.of electric powered portable spas."shall be controlled by the requirements of APSPA4. -SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS. El R,WA Lighting equipment (Mandatory). Not less than 75 percent of the lamps in permanently installed lighting foitures shalLbe high -efficacy lamps or not less than 75 percent of tHe-permanently installed lighting fixtures shall contain only high -efficacy lamps. Exception: Ldw=vo)tage lighting. R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights. 5/16/2019 1.0:27 AM EnergyGauge@ USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5 2017 - AIR BARRIER AND INSULATION. INSPECTION COMPONENT CRITERIA TABLE 401.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name., Express 2605 Hayden R Ps(.2bl 9 VINYL CARRIER Builder Name: Exprdss Street; Permit OM14-:. pity, State, Zip: ST LUCIE, FL, Permit Number. Owner. '.Express Homes Jurisdiction: Lu Design Location: 'FL, ST_1LUCIE�_COjNTL COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA Oe'n -era] A coniinu-ddia air bar'dershall be installed ire ihe buirdIn­ OenvstOPe Air- erm6 . able insulation -shall p requirements • The exterior thermal enveldpe contains. a 6fiffiluous air barrier.. I not be used as a, sealing material. Breaks or joints irk the air.barrier shall be*s661ed. Ceiling/atffe The air barrier fna:ny dropped ceilingfsoffitshaff be aligned with The: insulation in any dropped cailing4offit the insulation and any gaps in the air barrier shall be sealed. shag be with the airbarrier. Access openings, drop down, stairs or knee wall dodrs:td .aligned unconditioned attic s0ab4§ shall be sealed.- Walls hel-une The junction of tf6datf66-and sill plate be sealed. Cavities within comers:'and: headers of frame7walls . . The fuh6tloh of the top plate and the top of exterior walWshal I be- shall be Insulate d by completelyfilliqg the cavity ity sbal6d. with a, material having a thermal msfatan oe, of R-3 knee walls shall be sealed. per inch ffikiiiiium- Exterior thermal erwelqpe.insulation for framed walls shall be installed in substantial contact and continuous alignrnent with f he air Barrier; . Windows, skylights Theisoace, between. windoW/ddor iambs and framIngi and' - -and docirs skylights and framing shall b6 sealed:. RirnJoi6t6 Rim joists shall ificlude the air barrier. Rim,joists shall be.insdfated.. Floors the'air barrier shall be iMtalfid at any exposed edge of Floor framii g.cavity insulations shall 6e.4ristafled W (including. fris'ufation. maintain permanent contact with thei underside of above -garage subfloor decking, or floor friaming, cavity [asulatlon and cantilevered Vq shall be permitted to be Ift, contact with the top'side floors) of sheathirig; or continuous insUlition Installed on the underside of floor framing arid extends from the bottom to the top of all.perlm6ferfloor framing members. Crawl spaciaw611s; Exposed earth in unvented crawl spaces�§hall be -covered with Where provided, instead of floor insuration., Insulation' a Class I vapor retarder with overlapping joints.taped. shall be permanently attached, to theibrawlspace 'Shafts, pe netratl0s Duct shafts, utility. penetration s and flue shafts open!667to: extedororundoriditioned space shall be -sealed. 13atts in narrdw-caviti6s -shall be- cut to fit-, or narrow Narrow cavities cavities shall be filled by insulAtion. that on, installation readily confornis to the available cavity spaces. Garag6i'sboaratlon Air sealing: shall be provided between. the garage and conditioned sp c? a A Recessed fighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures Installed In the building shall, be sealed to the drywall, thermal envelope shall be air tight and IC rated. Plumbing- and wiring Batt insulation shall be!cu.t neatly to fit around wiring and plumbing, in exterfor walls, qr Insulation suration, that on Installation readily conforms to avaK&d space shall extand behind 2120na gnd w1drig Shower/tub Tfiii air barrier installed at exterior walls adjacent to showers: and Exterior walls adjacight:td showers. and tubs shall on exterior Wall tubs shall sap drate them from the shbWeks and tubs. be Insulated. Electri6allphone box or The air barrier shall be installed behind electrical or Communication exteriorwalls boxes orair-seared boxes, shall be installed. VAC registerboots HVAC register boots that penetrate building thermal envelope shall besealed to: ,thd:sub-ffqorordrywall. Concealed When required to be sealed, concealed fire spdrtkldrs shall only be sprinklers sealed in a manner that.is recommended by the manufacturer. Cablking-or other adhesive sealants shall not be used to fill voids bctwpan fim sf;fr�nkler cover plates and walle, or=iM!;fs, a. 11 omuttivit, 111opcRAIU11 WE IVU Wdilb %ilkill W ill accuruance.with the provisions Or ICU-41U.U. 5/16/2619 16:27 AM En.L-rgyGaug'e'@'USA 6.0.02.(Rev . . 1) - FaRes2o`11, F.BiC, Gth Edition. (201.7)'.Compliant Software Page 1 of I Envelope LeAkage Tett -Report (Blower Door Test) Residential Prescriptive, PorfOrtnahce or ERI Method Compliance 2017 Florida- Building Code, Energy ergy Conservation, 6th Edition Jurisdiction: 'r ,on: Permit Job n., Builder. Express Community: Lot: NA Address: City: LUCIE State: FL Zip: Air Lea F'as6inMsO6 t nedte' tth6rth&Re* c6i tivd.-or'ER.Ale th-p d "s ,q buildingK rate n' t.--e in r. r Oressi� -and'2 a -an" I -elf W'z ":c Onqes" Yr YM '0 PSRFQIR MANC :the ,s6lect6-AC, 7 R A W Jpe 05'9 ergy- (�q�anpq)'.br R,�O 7.006 CH �Wl cfflqO�K" R4 x 60 22463 Method for calculating .building volume: CFM(60) Ouildin' g- Volume AtH(60) 7 ORetrieved from architectural plans Code software calculated F1 PASS i OWhen.ACH(40) is less than 3,-Mechani'cal-Ven - Of . ation installatio . n O.Field. measured'and calculated must be verified by building department. R402A.1.2 Testing. Testing shall be: conducted in accordancP.Wittf ANSI/RESNETIICQ 380 And reported at a.prossmte(bf 0.2 inch w.g. (50 Pascals) Testing shall be conducted by either individuals as defined in section 553.993(5) or (7), Fldh'di Statues.or individuals licensed as set forth in Section 105(3)(4,'(g), or (l.):or.an approved third party..A. written rie-port-6f the results,of the test shall be signed by the party conductingthetest and provided to tfi'e'cod& official. Testing shall be performed at any time after creation on of all penetrations of the building thenn6l envelope. (. During testilig- 1. Exteribr'Whdows and doors, fireplace and stove doors shall 66 closed, but not seated, bdyohd the Intended w6atherstripping or other infiltratloh cOritr6rmeasure's. 2. Dampers including exhaust, intake, makeup air, back draft and flue-dampars shall be closed, but not seated beyond intended infiltration control measures. 3.,interforldoors, if installed at the time, of the test, shall be open. 4. Exteriordoorsfor continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of .the test, . shall be tuined off.. 6. Supply and return registers, if installed at the time ,of the test, shall be fully'open. T Company Name: Phone,.. . . I hereby verify that the above Air Leakage results are in'adtordance with the 2017 6th Edition Florida Building Code rn Energy Conservation reqqireehtiaccordin compliance g to the compliance method selected. -0bove. Signature of Tester: Date of Test: Printed Name of Tester: License/Certifl6ati6n 9: I§suing Authority; 5/16/2019 10:27:44 AM EnqTgyqaugeg) USA 6.0.02 (Rev. - I ) -'FlaRes2017 FBC 6th Edition (_2)17) Compliant Software ftware Page 1 of 1 Duct, Leakage. Test Report Retidential Prescri ptive, Perforhiahce: or ERI Method. Complianco 2017 Fl - oridg Building Code., Energy Conservation, Vation, 6th Edition Jurisdiction: Permit #' �4 Builder: lExpress Community.:: Lot: NA Address; City: -ST State: FL Zip* O'et,6rrdAncWERU Meth od System I cft-n25 System-2 cfiri25 System 3 -,c.fm25. $um of6irly dfryi25 Total of all cfrn25 + 2605 Total of Total -Gonditlofied I systems Square Footage PASS FAIL Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by dither individuals as d6fln6d in Section 553.993(5) or (7)-, Rorida Statutes, or individuals licensed as set forth ip'Section 489.105(3)(t), (g) or (i), Florida- Statutes. -"Testlrg CoPalmYw..:.- Company Name: Phone: I hereby verify that the above duct. leakage testing results -are in accordance with the Florida Building Code" requirements with the selected compliance path as stated above, either the P'rescriptive- Method or Performan.ce.Metbod. Signature of"rester. ... ... Date of Test: Printed Name. of Tester: License/Certification Is -suing Authority: 5116/2019 10:27:45 AM EnergyGaugeS USA 6.0.02 (Rev. 1) - FIaRe - s2017 FBC 6th Edition {2017) Compliant Software Page 1 of 1 Express 2605 Hayden Right :Ps! 2099 Vinyl Carrier HVAC Load Calculations for Express Homes 0 91a K 1. ..: ii"VA C RgsiowmAL, _. HVAq:LDwDS Prepared By: Kristin Kelly Florida Breeie 6928 Vikie Circle Suite B West Melbourne, FI 329174 321-951-8767 Wednesday, May 15, 2019 Rh' is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Editiori, Version 2, and ACCA Manual D. FRh Flo� We� Ttia- I �&LIEFh-tCommerci a U HVA--CLdad ,,FL 32664 o nnrf • Elite Software QeVelopment,,inC.� 0 16r Express 2605 Hpydr 13.9pt Ps 20, 'ag Project Title, Express 2605 Haydefi'Right Psi 2019 Vinyl Carrier Designed By., Kristin Kelly Prqjedt-Dato: Wednesday, May 15,20'19 Client Name: Ex s'Hom'es Company Name: Florida Bre eze C6mpppy'Representative: Kilstin Kelly Company Addres�s:, 6928 Vikle Circle Suite',g Company City, West Mell.boOrrip, FI $2904 -C6mpanyPhone1 321-951-8767: �ST RefereMceCity�--- L U�CtS, Florida Building-Orienta.flAw- Front dd&l`aces South Daily Teimoetature Range: Medium Latitude* 27 06&ees It I § v A'i o n: 25 ft. Altitude Factor: G.999 Outdobr' Outdoor Outdoor Indoor Indoor Grains .Div BU16 Wet Bulb F�eLkb- hi Ik6l: H6ni Dry Bulb Difference Winter. 42 49.4- n/a n1i 70 6/a -Summer. 90 59% 50% 75--' 61 Total Building Supply CFM: 1,257 CFM1 Per Square ft.,: 0.483 .Square ft. of RoomArea: 2,605 Squares ftPer Ton. . 733 Volume (fP)f• 22,404 j":Vu1ldiqq1`b6ds, Total Heating Required. Including Ventilation ir: 39;66-6 '!BtUh 39.666 -MSH 'total Sensible Gain: 33-864 1 :BtU . h 79 % Total Latent Gain: 13,811 Stuh 21 % Total Cbolihg'Reqqired Including Ventilation Air: 42,674 t uh B 3.66 Tons (Based On Sensible + Latent) Notes" Wm Rhvac is a �CC�a pro e• . Manual D1and S computer program. Calculations are performed erACCA an a Version 2,and ALGA Manual D. Al_cOmputedresUitsare estimates es building ather.mayvay. Be sure to selecta unit that meats both sensible Patent loads'according to the manufacturers performaike data at your design conditions. C:k ... NExpreiss 2605 tarrierjhg Wednesday, May 15, 2019, 3:25,PM Rhvac Residential & L!ght Commerciaf:HVAC Load's. Florida Bceeze . , Elite Software DeuelopinentE Express 2606 Hayden Right Psl 2M19 Vinyl C _ tAlest Melbourne, FL 3290.4 ' a P Miscellaneous -Report . 'System 1 Whole House. O"utdoor O,ufdoor Qutdoor, Indoor Indoor-' i Grains input Data.-; ' Dry Bulb° .:. Wet Bulb :Rel:HumRelHum Dry'Bulb' " Difference Winter.. '42: ' . _ --39.4 ' 80% n/a ' 70 n/a. .Summer: 90' 78 59% 60% 75- 61.09 Duct Sizin Inputs Main -Trunk - Runouts Calculate: 'Yes Yes Use'Schedule: Yes Yes Roughness Factor: 0.01000 0.01000 Pressure Drop: 0.1000 in.wg./l00 ft. 0-.1000 in.wg./100 ft. Minimum: Velocity: 550 ft./min 450 ft.imin Maximum Velocity: 600 ft./min 750 ft./min Minimum Height: 0 in. '0 in. Maximum Height: 0 in. 0 in. [Qutside`Air Data:. .Winter Summer. Infiltration Specified: 0:41.0 AC/hr 0.210 AC/hr 153 CFM 78 CFM Infiltration Actual: 0.410 AC/hr 0.210 -AC/hr Above Grade Volume: X 22,404 'CU.,ft. X '22,404 Cu.ft: %1-86 Cu.ft./hr : 4,705 Cu.ft:/hr X 0.0167 f X 0.0167. Total Building Infiltration: 153 CFM -78 CFM Total Building Ventilation: 0 CFM 0 CFM. ---System 1--- Infiltration & Ventilation Serisible'Gain Multiplier: 16.49 = (1.10 X.0.999 X 15.00 Summer Temp. Difference) Infiltration &. Ventilation Latent Gain Multiplier: 41.50 = (0.68 X 0.999.X 61.09 Grains Difference) Infiltration &Ventilation Sensible Loss Multiplier: 30.77 _: {1.10 X 0.999 X 28.00 Winter Temp. Difference) Winter Infiltration Specified: 0.410 AC/hr (153 CFM), Construction: Average. Summer Infiltration Specified: 0.216 ACihr (78'CFM),_ Construction: Average Duct Load: Factor. Scenarios for S stein. 9 ' �No Attic Duct 77 .`Duct � -Suda-d-W-7. From Type Descripfion 'Ucatron� . Ceiling_ :.Leakage, - Insulation_ �-Area �750 MT MDD 1 Supply Attic 185 -0.12 8 No 1 Return Attic I 1613- 0.12 8 705 No C I i G:1... \Express 2605 ... Carrier.rh9 Wednesday, May 15, 2019, 3:25 PM RhVac -:Residential& Light —45—mrnerciall.HVAC Lidads E1Ite'Softwa�e,DevdIOpmqhtj Inc. 'a Express 2605 Hayden Rig�t, Carrier CA ... NExpress 2605 ... Carrier.rh9 We'dnesday, May 1'5,'2019, 3:25 PM R.hyac -Residential & Lighf Commercial HVAC Loads T- Florida Breeze i :. Elite Software Development, Inc: Exptes_. 2605 Hayden Right Psl -2019:Vinyl Carrier Vilest Melbourne FL 32004.- - Total Building. $umrhary Loads -r _ Area Sen Lat- Sen Total j lComponent be'scription,: Quan Loss -Gain-.'Gain"' • Gain- 2A-v-o_ Glazing -Double pane low-e (e = 0.60), operable 208.8 ' ':2,342 -0 2,636 •'2,636 window, vinyl frame, U=value OA, SHGC 0.31 2A-v-d: Glazing -Double pane low-e (e = 0:60), sliding 46.8 697 0 665 665 1 glass door, vinyl frame, U-value 6.61, SHGC 0.34 2B-v-o: Glazing -Double pane,lovir=e (e = 0.60), fixed sash, 2.5 28 0 31 31 vinyl frame, Uwalue 0.4, SHGC 0.31. 11J: Door -Metal -Fiberglass Core, U-value'0.6 -20.4 343 0 318 318 1.1 D: Door -Wood - Solid Care;, U-value 0.39 ' '19 208 0 193 193 13AB-Ofcs: Wall -Block, no blanket. or board insulation, 2156.3 11,050 0 6,865 6,865 filled core,--sidirig finish„ L14alue 0.183 12C=0sw: Wall-FEame, R-13 insulation in 2 k 4 stud 355.8 907 0 696. 696 cavity, no board insulation, siding finish, wood studs, U-value 0.091 1613-30: Roof/Ceiling=Under Atti -with Insulation on. Attic 2605 2,334 0 4,168 4,168 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-30 insulation, U-value-0.032 22A-pm: Floor -Slab on ghade, No edge•insulation, no 157 5,187 0 0 0 insulation below floor, any floor cover, passive, heavy dry or fight Wet soil, U-value 1.18 Subtotals for structure: 23,096 0 15,672 15,572 People= 6 1,200 1,380 2,580 Equipment: 950 3,600 4,550 Lighting: 0 0 0 Ductwotk: 11,859 3,406 12,019 15,424 Infiltration: Winter CFM: 153, Summer CFM:.78 4,711 3,255 1-,293 4,548 Ventilation: Winter CFM: 0, -Summer CFM: 0. 0 0 0 0 Total Building Load Totals: f 39,666 8,811 33,864 42,674 :Check Figures ,. .., ., .. _ .. :.... Total Building Supply'CFM: 1,257 CFM Per Square ft: 0.483 Square ft. of Room Area: 2,605 Square ft. Per Ton: 733 Volume: (ft3): 22,404 Buiidfng Loads -. ,... .... -, .•.; ... .... ... .... _ ... Total Heating Required'Including Ventilation Air. 39,666 Btuh 39.666 MBH Total Sensible Gain: 33,864 Btuh 79 6/6 Total Latent Gain: 8,811 Btuh 21 % Total Cooling. Required Including Ventilation Air: 42,674 Btuh 3.56 Tons (Based On, Sensible + Latent) Notes77 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary: Be sure to selecta unit that meets both sensible and latent loads.according to the manufacturer's performance data at your design conditions. I c CA ...1Express 2605 ... Carrier.rh9 Wednesday, May 15; 2019, 3:25 PM RhVald- Resid'nOal,&,UgbtCom?nercikl,HVAC. Loads And. 'ElitelaftwareDe Development; �je 1. Tlorida Breeze 'u664..' EcpFqss'�26-05 Hayden Right Psi Carrier West Melbou�ne,'FL P896-6- Systeml Wh016,H0-us'e Summary -Loads Component ;Area Sen Cat Total] "Description . ... .... Quan -,-Loss-, Gain- Gain,," Gain. I 2A-v-o: Glking-Double pane IPWme- (e-= 0.60), operable 208.8 2,342 .0 2,636 window, vinyl frame, U-valu e'OA SHGC 0.31 2A-v-d: Glazing -Double pane low-e (e = 0.60),. sliding 40.8 60 0 665. 665 glass. door, vinyl frame, U-value 0.61, SHGC 0.34. 213-v-o: 016zi rig-Db . ouble pane low.;e (e = 0.60). fixed. s-a'shi 2.5 28 0 31 - 31 vinyl frame, U-value 0.4, SHGC 0t31 11): Door-Mdtal 717ibdrb!cjst Core, U-value 0.6 20.4 343 0 318 318 110: Door -Wood. -. Solid .Core, U-value 0.39 .19 208 0 1,93 193 13AB--fts! Wall -Block, no-blainkefor board insulation, 2156.3 11,050 0 6,866 .6,8 - 65 fklled cord, siding finish, U=yalue,Un 12C-0sw: Wall.;F " me1- RA 3 insulation iri 2 x 4 stud 355.8 . rp. . . 907 0 696 cavity, no board-ifisdiation, siding fin.ish,'W-6.od studs, U-value 0.'091' 16B 30: Reof/Ceiling-Under Attic:with Insulation on Attic 2605 21334 0 4,168 4,1�68 Flobr (also use for Kn66 Waldis .and . nd Partition Ceilings), Vented Attic, No Radiant Barrier;,Dark Asphalt brbark-Mekil, Tar iand"Graven or Membrane, R-30 insulation, U�-value 0.032 22A-pm: Flo'oi-'-Slab on grade, No. . edge ge insulation, no 157 5,187 0 0 0 insulation below floor, any floor cover, passive, issW, heavy dry or.light Wet soil; :U-Value .1 A 8 SubtotbW f6r-structure: 23j096 0 15,572 15,572. People: 6 1,200 1,380 2'HO' Equipment: 950 39'600 4,550 Lighting: 0 0 .0 Ductwork: 11,859 3,406 12,019 15,,424 Infiltration,'Winter.CFM; 153, Sdtnm6r CFM: 78 4,711 31-255 1,293 4,548-1 Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 System I Whole House Lbad totals: 39-666 8,61-1 33'864 42,,674 ;Supply CFM: 1,257 'CFM Per Square ft.". 0.483 Square ft. of Room Area-2,605 Square, ft. Per Ton: 733 Voldme (fr). 22,404 '-=7= 7- '..Total Heating Requir6d.Including Ventilatioti Air: 39.666 Btuh 39.666 MBH Tota]Spnsib.ie Gain: , 33,864 Btuh -79 % Total Latent Gain: 8,811 Btuh 21 % Total Cooling Required Including Ventilation Air: 42,674 Stuh 3.56 Tons (Based On Sensible + Latentj [Notes Rhvac is.an ACCA approved Manual J, D and S computer program. - Calculations. are performed per Ad.CA Manual J-8th Edftidn, Version 2, and ACCA Manual D. ary. All computed results are estimates as building.us,e--and weather.may vary. Be sure to select a unit ' that meets both sensible and latentloadstic'cording to the manufacturers performance data at your ur design conditions. CN...\Express2605... darrijerA9 Mdnetday, May 15, 2019, 3:25 PM --Residential & Light Commercial HVAC Loads � 1 e S me Inc. Breeze , : Express 2865 Hayden R ght Ps 2019.Vinyt G trier lelbourne, FL 32904 Pa 7 System. T -.Whole House _. Cooling System Type: Air Source Heat Pump Outdoor Model: 25HBC848A*030* Indoor Model: FX4DN(B,F)049L Tradename: GOMFORT15 HP Outdoor Manufacturer: CARRIER Description: Air Source Heat Pump AHRI Reference No.: 9155626 Capacity: 47,749 Efficiency: 15 SEER Heating System Type: Air Source.He'at Pump Model: 25HBC548A*030* Tradename: COMFORT1.8 HP Manufacturer-: CARRIER Description: Air Source Heat .Pump Capacity: 45,500 Efficiency: 8.5 HSPF This system's equipment was selected in accordance with ACCA: Manual S. Manual S equipment sizing data: SODB: 90F, SOVIB:. 78F, WODB: 42F, SIDB: 75F, SIRH: 500/6, WIDB: 70F, Sen. gain: 33,864 Btuh,: Lat. gain: 8,811 Btuh,. Sen. loss: 39,666 BEt$h, Entering clg. coi(:DB: 79.5F, Entering cig. coif WB; 64F, Entering htg. coil DB: 66.4F, Clg. coil TD: 20F, Htg. coif TD: 70F,:Req. clg. airflow: 1257 CFM, Req.'htg. airflow: 490 CFM C:1... \Express 2605 ... Carrier:rh9 Wednesday; May 15, 2019, 3:25 PM hvaiD =Aesidential & Lfght,Commercfil-HVACLoads Elite SclftwAire, D801V0ment, I C. Florida Breeze HaydenqRight0sl %iny[Carrler West-M&166urhe,.FL 11904 page,8 tg Min 7 - 'h. u % . Rfjn� Old: Ig Mih, Act R6=.�, - Area Se6k' Duct- Sep -Lat, " ' ' Sys-, No 'Name-', SF Btoh, CM -'Size v6r.' Btuh. Btuh,, _CFM CFM I First Floor 1,104 21,713 282 479 12,403 2,258 564 564 2 Second Floor 1,501 15,055 208 74 504 15,233 3,1.47 693 693 atent Duct. Latent 596 • R&tUrh Duct 1,958 6,228 2,B10 System I total 2,605 39,666 490 33,864 8,811 1,261- 1,257 System 1 Main Trunk -Size: 13x18 in. Velocity: 550 ft./min Loss per 100 ft.- 0,04.5- in.wg I Net Required. 3.56 79/0 1210/0 3;j,ufj4 - ts,tsl I 80%./20% 3.8,435 .9,314. 47,749 EqUipMeirit-Data: .... H6at1nC1 Sys em uoming zjysiem Type: Air $&rci Heat Pump Air So.u.rce Heat Pump . Model: 25H13G548A*030* 25HBG548A* 030* Indoor Model' FX4DN(13,F).0.4,9L Brand: .60MFORT15 HP COM * FORT15 HP. Description: Air Source H e-a-t: Pump. Air 966rce Heat. Pump. Efficiency: 6.514sp ' r 1'6 SEER Sound: 0 0 Capacity: 45,500 13fuh 147,749 Btuh Sensible Capacity: 61a. $9,435-13tuh Latent Capacity: n4 9 314- 13tuh . 1, , , AHRI'R6ferdfice No.: n/a 9155626 This system's equipment was sefected In accordance with ACCA:Ma.nual S. SOWS:. 78F, VVODO:.42F, SIDB: 75F, SIRHI: 50%, WIDE: 70F,.Sen. gain: Manual S equipment sizing data: SODB: . 90F, 38,864 Btuh, -Ldt.� 8,811 � Btuh, S66. loss:' - 39,666 15tuh,'Efiterind'clo. coil.uts: f 9.5F, Entering cl . coil WB: 64F, gain: Entering f t4.. coil DB: 66.4F, Clg7 "doil TD: 20F, Htg. coil TD: 70F, Req.- clg..airflow: 1267 CFM, Req. htg. airflow: 490 CFM 0 CA .. AEkpress 2605 ... CaMer.M Wednesday, May 15, - 2019, 3:25 PM