January 13, 2021 KSM JOB # :210319-1d/CH/ct
CONTRACTOR:First Choice Renovations
120 SE 1st Street
Pompano, FL 33060
JOB LOCATION:5242 Slash Pine Trail
Ft. Pierce, Florida
PERMIT #:2006-0542
To Whom it may concern,
Should you have any question, please feel free to contact our office.
Respectfully,
Julie E. Keller, P.E.
President
PE # 68366 01/13/21
Email to: beachg@comcast.net
Proudly Serving Florida since 1990
Enclosed, please find the nuclear density test results performed on the footer pads at the above referenced
project.
Headquarters
11345 U.S. Highway 1
Sebastian, FL. 32958
Orlando
723 Progress Way
Sanford, FL. 32771
Mailing
PO Box 78-1377
Sebastian, FL. 32978
Phone: 772-589-0712
C.A.# 5693
KSMengineering.net
January 12, 2021 KSM JOB # :210319-1d/CH/ct
2006-0542 NUC #417
First Choice Renovations Nuc Model:3500
5242 Slash Pine Trail Nuc Serial #:3417
Ft. Pierce, Florida
Footer Pads
#TEST LOCATION
OF SAMPLE DEPTH PEN
READ
DRY
DENSITY
MAX. DRY
PROCTOR VALUE (P.C.F.)
PERCENT
COMPACTION
1 N.E.0" - 12"50+110.7 112.6 98.3%
2 S.E.""111.5 "99.0%
3 Center ""111.2 "98.8%
4 N.W.""110.8 "98.4%
5 S.W.""111.1 "98.7%
Proctor Optimum Moisture:
@ Test Locations the Density &
1/13/2021
Proudly Serving Florida since 1990
Disclaimer:Contractor is responsible to maintain
the tested area in the condition that KSM
completed the indicated passed compaction
test.KSM is not responsible if the tested area
has been altered from the approved inspected
condition
112.6
Penetrometer reading indicate the
for Staked Foundation
Julie E. Keller, P.E.
President
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 6938
Soil Description:
Brown Sand with
Some Clay
In Place Moisture:
Proctor Max. Dry Density: P.C.F.
12.0%
13.4%
PE # 68366
DATE TESTED:
PERMIT #:
CONTRACTOR:
JOB LOCATION:
ITEM TESTED:
Degree of Compaction Meets
Minimum Requirement
Headquarters
11345 U.S. Highway 1
Sebastian, FL. 32958
Orlando
723 Progress Way
Sanford, FL. 32771
Mailing
PO Box 78-1377
Sebastian, FL. 32978
Phone: 772-589-0712
C.A.# 5693
KSMengineering.net
DATE TESTED:January 12, 2021 KSM JOB # :210319-1d/CH/ct
PERMIT #:2006-0542
CONTRACTOR:First Choice Renovations
JOB LOCATION:5242 Slash Pine Trail
Ft. Pierce, Florida
Soil Description:
Brown Sand with
Some Clay
Proctor Optimum Moisture:
12.0%
Proctor Max. Dry Density: P.C.F.
112.6
Julie E. Keller, P.E.
President
PE # 68366 1/13/2021
SOIL COMPACTION REPORT
ASTM D 1557
Proudly Serving Florida since 1990
107.0
108.0
109.0
110.0
111.0
112.0
113.0
114.0
7 8 9 10 11 12 13 14 15
W
E
I
G
H
T
P
.
C
.
F
.
D
R
Y
Moisture -% of Dry Weight