Loading...
HomeMy WebLinkAboutSoil Compaction Report'Headquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 DATE TESTED: PERMIT #: CONTRACTOR: JOB 1OCATIONr 1k, Ar ENGINEERINA AV& AND TESTIL ..SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 September 16, 2019 DR Horton Greekside Subdivision Parcel B, Lot 65 Fort Pierce, Florida PO Box 78. 377 Sebastian, FL. 32978. 'Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB. #: 184153-Lot 65/SS/jt ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.Fj COMPACTIOM:- 1. N.W. 0" -12" 50+ 114.2 115.9 98.51YG " 2. Center 50+ 113.6 98.0% 3. S.E. 50+ 112.1 96.7% Soil Description: Light Brown Sand with Shell and Silt In Place Moisture: 1.1.9% Optimum Moisture: 11.0% Max. Dry Density: P.C.F. 115.9 @ Test Locations The Density & Penetrometer Readings Indicate the Degree of Compaction Meets Minimum Required for Unstak V datio 00 R ••��' No.81439 ` � e • o TATE QF e Disclaimer: Contractor is responsible to maintain •••4 G 1; �O�• �`,,�`' the,, building .,pad in the condition that KSM ••.. i..• completed the indicated passed compaction test. Bryan E.:Uafllwilp" KSM is not responsible if the building pad has been V.P. of Engineering altered from the approved inspected condition. PE # 81439 9/18/2019 - Email to: metbournepermitting@drhorton.com; ryan@mjclanddev.,com Proudly Serving Florida since 1990 117.0 W E i r r l i i G 116.0 i—.._ _ - _..__._.._- T P 115.0 C 114.0 _ 1 ' _ R 11 12 13 14 _. _, Mosture.�°10 of Dry Weight