Loading...
HomeMy WebLinkAboutEvans Residence Energy R1EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 41/13/2021 3:33 PM Project Name: Owner: Builder Name: Permit Office: Jurisdiction: ST. LUCIE COUNTY EVANS RESIDENCE Street: City, State, Zip: FT. PIERCE , FL , 5911 BIRCH DRIVE Permit Number: Design Location: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) 1. New construction or existing 2. Single family or multiple family 3. Number of units, if multiple family 4. Number of Bedrooms 5. Is this a worst case? 6. Conditioned floor area above grade (ft²) Existing (Projected Detached 1 No 1644 7. Windows a. U-Factor: S H G C : b. U-Factor: S H G C : c. U-Factor: S H G C : d. U-Factor: S H G C : Sgl, U=1.05 94.83 ft² SHGC=0.25 Sgl, U=1.05 40.00 ft² SHGC=0.30 N/A f t ² N/A f t ² 8. Floor Types a. Slab-On-Grade Edge Insulation b. N/A c. N/A R=0.0 1644.00 ft² R=f t ² R=f t ² 9. Wall Types a. Frame - Wood, Exterior R=19.0 1192.00 ft² b. Frame - Wood, Adjacent R=11.0 296.00 ft² c. N/A R=f t ² 10. Ceiling Types a. Roof Deck (Unvented)R=30.0 1644.00 ft² f t ² R=b. N/A c. N/A R = f t ² 11. Ducts a. Sup: Attic, Ret: Attic, AH: Main 12. Cooling systems 13. Heating systems 14. Hot water systems a. Electric Cap: 50 gallons b. Conservation features None d. N/A R=f t ² Area Weighted Average Overhang Depth:2.000 ft. Area Weighted Average SHGC:0.265 Description Area Insulation Area Insulation Area Insulation Area 15. Credits Pstat 3 (134.8 sqft.) (1488.0 sqft.) (1644.0 sqft.) (1644.0 sqft.) Conditioned floor area below grade (ft²) 0 a. Central Unit a. Electric Strip Heat k B t u / h r 32.8 SEER:16.00 Efficiency k B t u / h r Efficiency 34.0 COP:1.00 f t ² R 6 225 EF: 0.950 Glass/Floor Area: 0.082 Total Proposed Modified Loads: Total Baseline Loads: 45.12 48.86 PASS I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code. PREPARED BY: DATE: I hereby certify that this building, as designed, is in compliance with the Florida Energy Code. OWNER/AGENT: DATE: BUILDING OFFICIAL: DATE: Review of the plans and specifications covered by this calculation indicates compliance with the Florida Energy Code. Before construction is completed this building will be inspected for compliance with Section 553.908 Florida Statutes. - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory-sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2). FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method FORM R405-2017 1-13-2021 PROJECT Title: Owner Name: # of Units: Builder Name: Permit Office: Jurisdiction: ST. LUCIE COUNTY 1 EVANS RESIDENCE Family Type: New/Existing: Bedrooms: Conditioned Area: Total Stories: Worst Case: Rotate Angle: 0 No 1 1644 3 Existing (Projected) Detached Address Type: Lot # Block/Subdivision: PlatBook: Street: County: City, State, Zip: FL , FT. PIERCE , St. Lucie 5911 BIRCH DRIVE Street Address Comment: Building Type: User Cross Ventilation: Whole House Fan: TMY Site Design Temp Int Design Temp Heating Design Daily Temp Design Location 2.5 %97.5 %Degree Days Moisture RangeWinter Summer CLIMATE 90 70 75 299 62 Low39FL_VERO_BEACH_MUNIFL, Fort Pierce______ Number Name Area Volume BLOCKS 1 Block1 1644 13152 Number Name Area Volume SPACES Kitchen Occupants Bedrooms Cooled HeatedInfil ID Finished 1 Main 1644 13152 Yes 2 3 Yes Yes1 Yes # Floor Type Area Tile Wood Carpet FLOORS R-ValueSpace Perimeter 1 1644 ft² 0 0 1______ Slab-On-Grade Edge Insulation - - - -0156 ft Main # Type Materials Color Absor. Roof Solar Deck Insul. Pitch ROOF Tested Roof Area Gable Area Emitt Tested EmittSA (deg) Rad Barr 1 Hip Composition shingles 1781 ft² Medium 0.6 30 22.62______No0 ft² 0.7 NoN ATTIC # Type Ventilation Area RBS IRCCVent Ratio (1 in) ______ 1 Full attic Unvented 1644 ft² N N0 # Ceiling Type R-Value Area Framing Frac Truss Type CEILING Space Ins Type 1 Under Attic (Unvented)30 1644 ft² 0.11 Wood______Main Spray Foam 1/13/2021 3:33 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT WALLS #Wall Type R-Value Area Adjacent Framing Solar Ornt Fraction Absor. HeightWidth Ft In Ft InTo Cavity Sheathing R-ValueSpace Grade% Below 1 19 0Main36 8WFrame - Wood 0.50.23Exterior288.0 ft² ____ 2 19 0Main47 8NFrame - Wood 0.50.23Exterior376.0 ft² ____ 3 19 0Main36 8EFrame - Wood 0.50.23Exterior288.0 ft² ____ 4 19 0Main30 8SFrame - Wood 0.50.23Exterior240.0 ft² ____ 5 11 0Main37 8NFrame - Wood 0.50.23Garage296.0 ft² ____ #Door Type U-Value AreaStorms DOORS Ornt Space Width Ft In Ft In Height 1 Wood .2 .1 ft² None______N Main .1.1 # Ornt Panes NFRC U-Factor SHGC Area Depth Separation Int ShadeFrame Screening WINDOWS Overhang Orientation shown is the entered, Proposed orientation. Wall ID Imp 1 W Low-E Single 1.05 0.3 20.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes1 N 2 W Low-E Single 1.05 0.25 17.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes1 N 3 N Low-E Single 1.05 0.25 17.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes2 N 4 N Low-E Single 1.05 0.25 17.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes2 N 5 N Low-E Single 1.05 0.25 6.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes2 N 6 E Low-E Single 1.05 0.25 17.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes3 N 7 E Low-E Single 1.05 0.25 6.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes3 N 8 S Low-E Single 1.05 0.25 2.8 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes4 N 9 S Low-E Single 1.05 0.25 12.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes4 N 10 E Low-E Single 1.05 0.3 20.0 ft² 2 ft 0 in 1 ft 4 in Drapes/blindsMetal Exterior 1______Yes3 N # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation GARAGE 1 312 ft² 312 ft² 37 ft 8 ft 11______ Method CFM 50 ACH 50ELASLAScope INFILTRATION ACHEqLA# 1096 560.13.000254Wholehouse .0902112.89Proposed ACH(50)1 HEATING SYSTEM # System Type Efficiency Capacity DuctsSubtypeBlockSpeed 1 Electric Strip Heat/COP:1 34 kBtu/hr ______sys#1None1 1/13/2021 3:33 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT # System Type Efficiency Capacity Air Flow SHR COOLING SYSTEM DuctsSubtypeBlockSubtype 1 Central Unit/SEER: 16 32.8 kBtu/hr 984 cfm 0.8______sys#1None1Single # System Type EF Cap Use SetPnt Conservation HOT WATER SYSTEM SubType Location 1 Electric 0.95 50 gal 60 gal 120 deg None______None Garage FSEC Company Name System Model #Collector Model # Collector SOLAR HOT WATER SYSTEM Storage FEFCert #Area Volume None None f t ² ______ # Location R-Value Area Location Area ---- Supply -------- Return ---- Leakage Type Handler CFM 25Air QN RLF DUCTS Heat Cool HVAC # TOT OUT CFM25 1 Attic 6 225 ft² Attic 40 ft² Default Leakage Main (Default) c______1 1 (Default) c TEMPERATURES Programable Thermostat: Y Ceiling Fans: Cooling [ ] Jan [ ] Feb [ ] Mar [ ] Apr [ ] May [X] Jul [X] Aug [X] Sep [ ] Oct [ ] Nov [ ] Dec [ ] Dec[X] Dec[X] Nov[X] Nov[ ] Oct[X] Oct [ ] Sep[ ] Sep[ ] Aug[ ] Aug[ ] Jul[ ] Jul[ ] Jun[ ] Jun[X] Jun[ ] May[ ] May[ ] Apr[X] Apr[X] Mar[X] Mar[X] Feb[ ] Feb[X] Jan[ ] JanHeatingVenting Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD)AMPM 7880 7880 7878 7878 7878 7878 7878 7878 8078 8078 8078 8078 Cooling (WEH)AMPM 7878 7878 7878 7878 7878 7878 7878 7878 7878 7878 7878 7878 Heating (WD)AMPM 6668 6668 6668 6668 6668 6868 6868 6868 6868 6868 6866 6866 Heating (WEH)AMPM 6668 6668 6668 6668 6668 6868 6868 6868 6868 6868 6866 6866 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 lbs/sq.ft.0 ft² 0 ft 0.3 Main 1/13/2021 3:33 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 4 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT Project Name: Owner: Builder Name: Permit Office: Jurisdiction: ST. LUCIE COUNTY EVANS RESIDENCE Street: City, State, Zip: FT. PIERCE , FL , 5911 BIRCH DRIVE Permit Number: Design Location: FL, Fort Pierce CHECKAIR BARRIER CRITERIA A continuous air barrier shall be installed in the building envelope. The exterior thermal envelope contains a continuous air barrier. Breaks or joints in the air barrier shall be sealed. The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier shall be sealed. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. The junction of the foundation and sill plate shall be sealed. The junction of the top plate and the top of exterior walls shall be sealed. Knee walls shall be sealed. The space between window/door jambs and framing, and skylights and framing shall be sealed. Rim joists shall include the air barrier. The air barrier shall be installed at any exposed edge of insulation. Exposed earth in unvented crawl spaces shall be covered with a Class I vapor retarder with overlapping joints taped. Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Narrow cavities Shafts, penetrations Crawl space walls Floors (including above-garage and cantilevered floors) Rim joists Windows, skylights Walls Ceiling/attic General COMPONENT Garage separation Recessed lighting Plumbing and wiring S h o w e r / t u b HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub-floor or drywall. The air barrier shall be installed behind electrical or communication boxes or air-sealed boxes shall be installed. The air barrier installed at exterior walls adjacent to showers and tubs shall separate them from the showers and tubs. Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Recessed light fixtures installed in the building thermal envelope shall be sealed to the drywall. Air sealing shall be provided between the garage and conditioned spaces. When required to be sealed, concealed fire sprinklers shall only be sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or ceilings. C o n c e a l e d Electrical/phone box on exterior walls Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA INSULATION INSTALLATION CRITERIA EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software1/13/2021 3:33 PM Page 1 of 1 Air-permeable insulation shall not be used as a sealing material. The insulation in any dropped ceiling/soffit shall be aligned with the air barrier. Cavities within corners and headers of frame walls shall be insulated by completely filling the cavity with a material having a thermal resistance of R-3 per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Rim joists shall be insulated. Floor framing cavity insulation shall be installed to maintain permanent contact with the underside of subfloor decking, or floor framing cavity insulation shall be permitted to be in contact with the top side of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. and doors on exterior wall requirements Recessed light fixtures installed in the building thermal envelope shall be air tight and IC rated. sprinklers Where provided instead of floor insulation, insulation shall be permanently attached to the crawlspace Exterior walls adjacent to showers and tubs shall be insulated. 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 92 The lower the Energy Performance Index, the more efficient the home. 1. New home or, addition 1. __________ Existing (Projected) 2. Detached or multiple-family 2. __________Detached 3. No. of units (if multiple-family)3. __________1 4. Number of bedrooms 4. __________3 5. Is this a worst case? (yes/no)5. __________No 6. Conditioned floor area (sq. ft.)6. __________1644 7. Windows, type and area a) U-factor:(weighted average)7a._________1.050 b) Solar Heat Gain Coefficient (SHGC) 7b._________0.265 c) Area 7c._________134.8 8. Skylights a) U-factor:(weighted average)8a._________NA b) Solar Heat Gain Coefficient (SHGC) 8b._________NA 9. Floor type, insulation level: a) Slab-on-grade (R-value)9a._________0.0 b) Wood, raised (R-value)9b._________ c) Concrete, raised (R-value)9c._________ 10. Wall type and insulation: A. Exterior: 1. Wood frame (Insulation R-value) 10A1.________19.0 2. Masonry (Insulation R-value)10A2.________ B. Adjacent: 1. Wood frame (Insulation R-value) 10B1.________11.0 2. Masonry (Insulation R-value)10B2.________ 11. Ceiling type and insulation level a) Under attic 11a.___3____0.0 b) Single assembly 11b.________ c) Knee walls/skylight walls 11c.________ d) Radiant barrier installed 11d.________No 12. Ducts, location & insulation level a) Supply ducts R_______6.0 b) Return ducts R_______6.0 c) AHU location Main 13. Cooling system: Capacity_______32.8 a) Split system SEER_______ b) Single package SEER_______ c) Ground/water source SEER/COP_______ d) Room unit/PTAC EER_______ e) Other __________16.0 14. Heating system: Capacity_______34.0 a) Split system heat pump HSPF_______ b) Single package heat pump HSPF_______ c) Electric resistance COP_______1.0 d) Gas furnace, natural gas AFUE_______ e) Gas furnace, LPG AFUE_______ f) Other 15. Water heating system a) Electric resistance EF_______0.95 b) Gas fired, natural gas EF_______ c) Gas fired, LPG EF_______ d) Solar system with tank EF_______ e) Dedicated heat pump with tank EF_____ f) Heat recovery unit HeatRec%_______ g) Other 16. HVAC credits claimed (Performance Method) a) Ceiling fans _________ b) Cross ventilation _________No c) Whole house fan _________No d) Multizone cooling credit _________ e) Multizone heating credit _________ f) Programmable thermostat _________Yes *Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL display card will be completed based on installed code compliant features. Builder Signature:_________________________________________ Date:____________________________________ Address of New Home: ____________________________________ City/FL Zip: ________________________________5911 BIRCH DRIVE FT. PIERCE, FL 1/13/2021 3:33:52 PM EnergyGauge® USA 7.0.00 - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1