Loading...
HomeMy WebLinkAbout30 day power release planning Development wises J. Cods Building a RequlaVlon Division 2300 Virginia Ave Fort Pierce, FL 34982 772p4 -216 Fax 772-462-6443 Request for 30-Day Tempomy Power Release Date: tv Pert-nit Number: 050 Project Andress: 950r3 b1 Gt��c�- THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. ibis temporary power release is requested for the above stated purpose only,and there will be no occupancy of any type,other than that permitted by construction during this time period. Z. As witness by our signatures,we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled"Requirements for 30 Day Posner for Testing"have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A Pee of$100.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNT Y, AND THEIR EMPLOYEES FROM ALL LIABILI i LES AND CLAIMS OF ANY 1 YPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT 4F THIS TRANSACTION INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE D S ONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLA-EON OF THIS AGREEMENT. r7 /1'7 04 SIGNATURE DArr I ` GEN RAL C TRACTOR SIGNATURE DATE ELECIRICAt NTRACTOR SIGNATURE DA E R EC JUL 2 0 2017