Loading...
HomeMy WebLinkAboutTermite Treatment _ _ Planning &Development Services r r- `m~ Building &Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT P RMIT #: )-703'oS6 JOB ADDRESS: E Y BUILDER/CONTRACTOR: ✓L R-�vy� PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Chemicals used: DOMINION 2L Percentage of solution: •05% Total gallons used: Date-of Treatment: / 7 Time of Treatment: - Footing ----- .Slab -- - - —-- - - - -- -- 11t Treatment moist Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other Perimeter f inal Inspection 1st Treatment Re-Treat J4; re- 7 7 Signature of Exterminator 6atd Note. There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall pro vide the product used, Identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. .St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 Planning &Development Services Building &Code Regulation Division 2300 Virginia Ave • Fort Pierce,FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT , PERMIT #: 7 03­0-74-7 JOB ADDRESS: �' BUILDER/CONTRACTOR: C,on C c �)q dd PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:J13175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. 6 Square feet if area treated: Chemicals used: DOMINION 2L Percentage of solution: .05% Total gallons used: Date of Treatment: ul e Time of-Treatment: 1 -3 RECEIVED Footing Slab 15t Treatment 15t Treatment MAR 21 2018 Re-Treat Re-Treat Driveway Pools ST. Lucie county, Permitting Is Treatment 1st Treatment Re-Treat Re-Treat Other Perimeter for F. al Inspection 1st Treatment Re-Treat k/6112 Signature of a ator Date Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the Inspector at time of each inspection or the scheduled Inspection will fail and a re-inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certlficates as each required protective treatment Is completed, providing a copy for the person the permit Is issued to and another copy for the bullding permit tiles The Treatment Certificate shall provide the product used,identity of the applicator;time and date of the treatment,site location, area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment: If the soil chemical barrier method for termite prevention Is used, final exterlor treatment shall be completed prior to final bullding approval. St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 • Termite Inspection 05U5 Christ is to 0772-323_7921 r • Termite Pretreatment �e q • Pest Control ® EUICf A-Bug Toll Free: 1-877-365-9990 Termite & Fax: 772-340-5990 • Rodent Service _ °' Pest • Fire Ant Lawn Service Control, Email: Evictabug@gmail.com • Whitefly Treatment Inc. 2373 SW Woodridge St. • Licensed & Insured �'� JB17575 Port St. Lucie, FL 34953 Notice of Preventative Treatment for Termites (as required by Florida Building Code(FBC)104.26 and Broward County Chapter FBC 105.2.2) PEST PREVENTIONWIFIRE ANT SERVICE I TERMITE SERVICE I RODENT EXCLUSION&REMOVAL I WHITEFLY TREATMENT DATE OF SERVICE J r� TIME 1 DEVELOPMENT NAME(PROJECT) / CONTRACTOR'S NAME CONTACT PERSON A/o STRUCTURE ADDRESS(LOT/BLOCK)' 4 r CITY,STATE _ COUNTY / /' �� i L? 1'..'�/�.I �"..M.��'.•-� Ia�•C�' / ��Cs�✓��' Il�n,�l.�' _ J i� L�^l✓L.(�1\�_ NOTES ZIP CODE 3—D s ) ; ^�n - ��Yl ct r tit �•I u v,.s` J�,= J TREATMENT TYPEIAREA ❑FLOATING ❑MONOLITHIC ❑PATIO ❑GARAGE ❑DRIVEWAY ❑STEM WALUFOOTERS ❑ADDITION ❑CUTOUTS ❑FOOTER ❑FRONT ENTRY ❑RETREAT ❑BORA CARE TREATMENT ❑PLUMBING CUTOUTS ❑SIDEWALKS ❑TAMP&TREAT DIREAT ONLY 17 FINAL ❑POOL DECK ❑OTHER PRODUCTS ❑BASELINE O.,DOMINION 2LACTIVE INGREDIENT ❑TERMIDOR SC ❑BORACARE ❑PREMISE ❑TALSTAR ❑OTHER ACTIVE INGREDIENT P IMIDACLAPRID ❑BIFENTHRIN ❑DISODIUM OCTABORATE TETRAHYDRATE CONCENTRATION / ✓ ❑.06% ❑.12% ❑.25% O(05% ❑23% ❑9% ❑OTHER GALLONS APPLIED /C ' `Y SQUARE FOOTAGE LINEAR FOOTAGE 30 0 i RECEIVED SQUARE FOOTAGE VERIFIED y `12 YES ❑NO --@VEASURED OR VERIFIED PER PLANS MAR 2 12018 / JOB READY CONDITIONS MET ST. 6y, Permitting YES ❑NO DETAILS As per 104.2.6 FBC-If soil chemical barrier method for termite prevention is used.Final exterior treatment shall be completed prior to final building approval. Certificate of Compliance:The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services.(Per the Florida-Building Code.) If this notice is for the final exterior treatment,initial and date this FINAL STICKER f ❑ELECTRICAL PANEL ❑WATER HEATER ! Q-OTHER /� Payment Terms: Payment due at time of service. 4, Date Applicator:(Evict A Bug Termite and Pest Control, ca�i Date CustoJner(Property Owner or Agent) www.evittabugpestcontrol.com