Loading...
HomeMy WebLinkAboutApproved Plan THESE PLANS AND a1LL PROj✓pSEn V110hY ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THATWAYBE HE -TO � 11 d COI�I�LY.If F�ACLAI�PLICA®LE COMS... .. 0 Kitchen Scope of Wo k Install New Cabine s & Tops Guest Bath umb New Kitchen Si k& Faucet yONCEALED FASTEN ATTACHMENTS cope of Work large L-- hru Opening ARE THE RESPONSIMM OF THE Install Vanity &Top AD Underer Cou Counte Lighting Plumb Vanity Sink& Faucet CONTRACTOR OF RECORD New Tile @ Tub Surround Install New Shower/Tub Faucet '*NOTE** Existing Tub Remains ST. mp; a.� A (1-U1, Rai 7liiwjG D-MSIO\' REVIEWED FORiC,01NIPLIANCE REVIE,WED BY cS Uc 2CUM DATE 7 } ° PLANS ANTD PETaUT MUST BE KEPT ON JOB OR NO INSPECTION WILL 13E)d=E. Master Bath Scope of Work \ Install Vanity &Top Plumb Vanity Sink& Faucet Note:This drawing is an artistic Designed:3/22/2017 Remove Door @Toilet interpretation of the general Printed:3/23/2017 appearance of the design.It is Install New Shower Pan &Walls to be Tiled not meant to be exact rendition. Cri Install New Shower Faucet Lora-Renovation rawing 1 Orawing#: 1