HomeMy WebLinkAboutApproved Plan THESE PLANS AND a1LL PROj✓pSEn V110hY
ARE SUBJECT TO ANY CORRECTIONS
REQUIRED BY FIELD INSPECTORS THATWAYBE HE -TO
�
11 d
COI�I�LY.If F�ACLAI�PLICA®LE COMS... ..
0
Kitchen
Scope of Wo k
Install New Cabine s & Tops Guest Bath
umb New Kitchen Si k& Faucet yONCEALED FASTEN ATTACHMENTS cope of Work large L--
hru Opening ARE THE RESPONSIMM OF THE Install Vanity &Top
AD Underer Cou Counte Lighting Plumb Vanity Sink& Faucet
CONTRACTOR OF RECORD New Tile @ Tub Surround
Install New Shower/Tub Faucet
'*NOTE** Existing Tub Remains
ST. mp; a.�
A (1-U1, Rai 7liiwjG D-MSIO\'
REVIEWED FORiC,01NIPLIANCE
REVIE,WED BY cS Uc 2CUM
DATE 7 }
° PLANS ANTD PETaUT MUST BE KEPT ON JOB
OR NO INSPECTION WILL 13E)d=E.
Master Bath
Scope of Work
\ Install Vanity &Top
Plumb Vanity Sink& Faucet Note:This drawing is an artistic Designed:3/22/2017
Remove Door @Toilet interpretation of the general Printed:3/23/2017
appearance of the design.It is
Install New Shower Pan &Walls to be Tiled not meant to be exact rendition. Cri
Install New Shower Faucet
Lora-Renovation rawing 1 Orawing#: 1