HomeMy WebLinkAboutCompactionUES Project No:
Workorder No:
Report Date:
3360.1800067.0000
222643-1
01/19/2021
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In-Place Density Test Report
Client:D.R. HORTON, INC. EAST FLORIDA DIVISION UES Technician:Johnnie Smith
1430 Culver Drive, NE
Palm Bay, FL 32907
Date Tested:01/12/2021
Project:CMT CREEKSIDE
Various Locations,Vero Beach, County, FL 32967
Type of Test:
Area Tested:3213 Trinity, Lot 69, Foundation Pad Field:ASTM D-6938 Nuclear Gauge Method
Material:Fill Laboratory:ASTM D1557 Modified Proctor
Reference Datum:0 = Top of Final Grade
The tests below meet the 95% minimum compaction requirement.
Test
No.Location of Test Range
Maximum
Density
(pcf)
Optimum
Moisture
(%)
Field Dry
Density
(pcf)
Field
Moisture
(%)
Soil
Compaction
(%)
Pass
or
Fail
1 W section 1-2 ft 118.6 10.8 118.2 10.7 100 Pass
2 E section 1-2 ft 118.6 10.8 118.4 10.6 100 Pass
3 Center section 1-2 ft 118.6 10.8 118.7 10.9 100 Pass
Remarks:0-1’ HCP=50+, > 95 % Compaction, PASS. HCP tests are empirically correlated to the relative density of the soil.
Permit # 2002-0063
Reviewed By
GFA International, Inc
Certificate of Authorization No. 4930
John Kent
Senior Project Engineer
STATE OF FLORIDA
Professional Engineer No. 63218
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1