Loading...
HomeMy WebLinkAboutProducts Review; Premium Plus Skirting� F'Ycm:S�ylecr®ct 01//26/2014 'M:22 ivvsaa v,404/OOM l: Solidl'Pan Cent4r:;Ve Top Front Top Back . r% T_ 1 I i P 5ni f � Ventilation: i l; ( Center Vent 8.4 sq. ire./ft, Df panel Available Colois .040 t� Panel .Ci40"'`�f i White I =� i Grey i Tan m -.059": i '; Clay .047 i Li Sand ntllatlor: � 4.9 sq. in./ft. of panel 18AGLIt Vinyl Skirting i able Colors VA -Y:.-. • solid Pane 1 �5„ While ' a p�'ented Panel :. 35„ Grey Tan f p Front Tnnn - 50r Clay• op Sack Trim :. 48„ Sand ottom Trim . 4u 0 Trim iit Con parision: Pre' mltim Plus Eagle ` .0 " i Front 40 59 .050° NOTE, To p Back trim foe a Bank Rail .05W .04W Premium P and Eagle Bottom Charm .04711 ,04V Trim Klts.ar the Same Top Front Trim Wr Vidth 4.725" i a dimensions 4.360 i Upper Leg 59�" i I .550" i installers Premiuin Plgs Trim Kits with (Eagle Panel is because it it HEAVIER; The re�son mart use and, in areas where blow-out is a problem, Premium Pfuls offers more rigid protection against blow-out, OMLW98 90:L® VIK/WL@ 9®/M 39Vd 10d3Q 3WOH 31Y80W I t Ai ATTACH BACK RAIL 1. Determine a place for mounting. Place bottom edge of back rail just below bottom edge of the home. `finis location must offer solid support for attaching and wind load pressure for panels and rails. 2. Keep the back rail straight and level. Snap a chalk line around the home to guide the top edge of the back rail. 3. Correct screwing or nailing method for back rail: Start on the back side of the home. Position screws or nails in the center of the slot. Scsewlnail to allow for a clearance of 1116" from the back rail surface. Now. avoid rightly screwing or nailing back rail. A 1/16" Clearance allows for normal expansion and contraction with temperature change. Place a screw or nail in every other slot. 4. Provide a 1/2" gap between each back rail section for normal thermal expansion. To install around corner, refer to Step E. PPASO A: INSTA,LF, EL RIEL DE AP'OYO 1. Determine un lugar pars el montaje. Coloque el boxde inferior del rill de apoyo justo abajo del boxde inferior de la toss. Esta ubicado'n debe ofrecer un apoyo firme que permit& davar Jos rieles y soportar la preside por cargas de viento en los paneles. 2. Manoenga demcho el riel de soporte y a nivel. Marque una Linea con el cordel entitado alrededor de la Casa pars guiar el boxde superior del riel de apoyo. 3. Mdtodo coxrecto pars clavar el rid de apoyo: Comience en la parte posterior de la casa. Coloque los clavos en el centeo de Is ranum pare clavos. Introd,tzca los clavos y deje una holgura de 111.6" desde is superficie del del de apoyo. Nota: No clave muy ajustadamente el del de apoyo. Una holguta de 1116" con. la cabeza del claw permitiri el espacio ft&ente parts absorber Ia expami6n y contmccidn normales rembattes de los cambios de temperatura. Cologao los clavos en ranuras alternas. 4. Deje un espacio de la' entre calla secd6n de del de apoyo para tenet en cuenta la expansion termica normal. Para instalar el produeto alrededor de las esquinas, consulte el paso P. l EP 8; MOUNT BVITOM RAIL 1. Ground preparation. Pxepare the ground so that it is smooth, free of loose clumps, clods or protruding obstacles. Guard against uneven settling of newly excavated ground by mounting the bottom rail on treated (2" x2") lumber: 2. Mark the ground location directly below the outside, bottom edge of the home. Use a level or plumb bob to determine this location at each corner. 3. Snap a chalk line or stretch a nylon string between each corner to Ode the bottom rail. 4. Position the bottom rail with the back leg toward the inside of'the chalk line perimeter. 5. Drive ground spikes very 19 inches. Mvo sets ofltoles are provided in the bottom rail. They are located inside the channel, and on the back leg. Ground spikes maybe driven in either hole at intervals of 19 inches. 6. Znsts1lation on concrete. Use a 3/4' masonry nail. You may also drill a hole for a 3/1.6" molly screw and plastic sleeve. (Nail and screw materials are available at most hardware stores.) To install around corner, refer to Step E. PASO Bi MONTME DEL RIEL INFERIOR 1. Preparaci6a del plsa de tierra. Prepare el piso de mantra que este uniforme, sin rotas sueltas, termnes ni obsticulos que sobxesalgan del plso: Proteja la instalacidn contra el asentm iento no uniforme enpisos recien cxcavados, montando el riel inferior en unapieza de roadera tratada (2" x 2"). 2. Margot la ubicW6n en el piso directamentc abajo del horde inferior externo de la casa. Use un nivel o rota plomada pars determ inar esta ubicaddn en cada esquina. 3, Marque una line* con of cordel entixado o coloque una. aterds de ag6n entre cads esquina para oat el xtel de apoyo. 4. Coloque el Aelde apoyo con la pats de mpaldo hacia elinte4ordel. perimeteo marcado pot is iinea de 6za. S. Introduzea los claws gmesos en d piso a calla 19 pulgadas. En e1 080-3 P0001ti000d L81-1 60L8-658-008-1 awTjd/oTjaRTjV-W0f33 8E:60 5L,-LO-1;0 4 riel inferior se proporcionan dos conjuntos de agujeros. &tos se enmentran dentro dd canal, en la pate de soporte. Los davos gruems pare el piso se pueden c).4var a travel de cudgtiera de lw agujems a una distancia do 19 pulgadas entte si. 6. Instalacibn en pisos de concreto. Use ua claw de 3/4" pare mamposter£a..Asi mismo se puede taladrar un *ero pare un tornillo de 3/16" tipo Molly cots ancla plestica. (Los matcriales de clavos y los tomillos estan disponibles en la mayoda de las fcrretedas). 1. Para lnstalar el producto alrededor de las esquinas, consulte el piso E. EP Ci PANAL INSTALLATION 1. 114nning 24" away £tone the lowestcorner of the home, measure fmm the ground up to 1-112" above the bottom edge of the back rail. (If the temperature is below 407, with frozen ground, measure to 3" above the bade red edge.) 2. Mcasusements on st*ng ground should be taken every 16" (width of panel). , 3. Cut the bottom of each panel to angle with the ground. Each cut panel section should aliga 90° to the bottom edge of the home. Use w6ation snips or a power saw (with a fine toothed saw blade turned backwards) for cutting. 4. Punch lock tabs every a along the top and bottom edge of cut panel sections (or outside portion; of each panel face for 13" VFMast). A. Malco (SL-8) Snap Lock Punch tool is recommended. Consult your skirting supplier for obtaining this tool. Tabs ate to be positioned outwa to catch an the hooked edge of the rails. S. Interlock panels and insert into the bottom rail. Begin with the first panel inserted into the bottom rail. Lock tabs should snap past the hooped edge of the bottom rail. Insert next panel section into the interlock hooks along the vertical edge of the panels. Seat each panel securely into the bottom rail. Repeat interlocking panels, forming about a 12-foot section. Resume panel cut and interlock method. To install around corner, refer to Step E. PASO Ci 1Nsikkdm oR Los Pwus 1. Comerraarrdo a 24" do la esquins inferior mes baja de la Casa, Saida desde la superf Cie del piso haste I VT arriba del borde inferlorr del riel de spoyo. (Si la tenperatum ambiente durance la instalacidn es inferior a los 40T y el piso estd congclado, mida hasty 3" aaiba del borde del riel de apoyo). 2. Las mediciones en prisos con: desnivel deben hacerse a cads, 16" (mcho del panel). 3. Cone is pate inferior de cads panel en angulo sego el desnivel del piso. Coda seccidn de panel corWo debt ester a escuadra (9(°) con of borde inferior de Is case, Use tijeras de hojatatero o una slem electrica (con una boja de corte de diente fino colocada al reves) PM cortex Ios panties. 4. Perforce las lengtiew de cierm cads 4" a to laW del borde superior e inferior de las ser4ones de paneles conados. Se recoauieuda el use de una punzonadom de inane Mdco A-8) Snap Lock Punch. Consulte con su praveedor de cenefas sobve c6mo obtenex ate herramients. Las leng,etas deben colocane ha& afuera a fin de poder enganchat el borde de gambo de )as titles. _ _-- •__-- _ __ ^Ml^ .lam *An r atnT.t1h1T1f1PT1H_llnu-7 MAS U.-I.0-TA 5. Engenche los pantiles c introddacalos en el riot inferior, Comienee corn el primer panel introducido an el tie! inferior. I." leng,etas de cierte deben enganchaUs NO nods gild del borde con gaucho del rief do apayo. Intradttaca Da giguiente seccidn de panel en los gauchos de enclavamiento a. to largo del horde vertical de los paroles. Asiente cads. panel firmemente en el del inferior,-ReP14 of enclavamietnto de los panelcs hasty forwax uaa section de opmAmadameute 12 piee. l?made cl ootte de los pantiles y el merodo de enclavatniento- Para instalar el producto an lag esquinas, eonsulte el paso E. 0 YMMMP Di INTERLOCK. FRONT RAIL WH BACK, RAIL 1. Stan strapping one end of the front top rail into the back top rail, creating the interlock. Push the front top rail uprvtrard, its entire length until the front top rail is completely inw1acked with the back tail, 2. Overlap V ea h top rail sect}OB. To instag around corner, refer to Step E. PASO Di F.NCLAYAMIWM DES, RIEL FRONTAL COI EL REEL DF APOYO 1, Congence engarnchando un aftmo del riel frontal superior ern el ti l superior de aPoyo, pare foxtnar el rnetanismo de welavarniento. Empuje el riot superior de apayo hacia a►Yiba an Coda su longitad pasta que el riel frontal superior eats completamente enganchado en el riot de spoyo. 2. Ttaslape V cada seceik del riel superior. Para instalar ei producto art lag esquinas, Consul% el Paso E. MP E: AT��N SCORNER IIWALL 1. Top back rail — Make a 1" vertical. slit from the top. Top irmlock hook should be corapletelY out &=gb, Noah 45° onbovom cumedleg 2. Bottom rail— Notch the back portion with snips, as illus=d. Bend around a corner and attach to the ground. I Pmels — Cut panel to proper hdOt. let FJWue point of corner bend; bend over a table edge, forming a unif M angle, 4. Tag fftmt rail —Notch at both the top and bottonn books of the from rail, as illustrated, Bend around the comer and fit into the interlock with the top back rail. Refer to Step D. 1:OUR PmNO%HEDTOP F1WW RAILS ARE IMCW090 IN TRIM PAL PA�O '1'A 1" I�A s DEL PRODUCrO EN LAS UQUINA 1. P% superior de aPor — Hap un torte vertical de V desd�: la parse superior. E1 gancho superior de enclavamiento debt cortarse cornpletamente. Hqa. una muesm a 4S° err is past cwYada inferior. 2. Riot inferior — Corte la porsifin posterior con tijetas de hgalatew seg& se muestm an la ilustrsc't6n. Milo altededor de una esquitasy dtivelo ai Piso. 3. Pantiles — Corte el panel a la altars. apropiada. Determine el panto dedobl= dobiecl panel sobrc el borde de una mesa, Pam former un &wb recto. Q. Riel froatd superiat — Corte Dos gauchos superior a inferiar del riot frontal, seg4n sa gusts on l L figura: Doble la pitza okededot de 12 esquina y engbMa en el enlavamietnta con el riel supedw de apoyo. Comulte el pass D. EN EL CONJUNTO TRIM PAK SE 1HCLOYEN CH,ATRO RIFLES SUPERIORES FRtaNIALES YA COKWOL nnrh__.7 t:.raM210t MAJ tar—r @WT.zd/3Tjt1ej1V—W0H3 89:60 5Lf—LO-10