Loading...
HomeMy WebLinkAboutPermit WorksheetsW °CZZ ®Q:) W W L W LU Lai CC ® ' pERIfiT NUMBER �yN ti, i t ; .... r,';... Installer _UyAJOe, lu► l ., ts:i,, GU License # �1 H — 10 i (at Zia Address of home. being installed Manufacturer 686 6k- WeJ-.t' ' Lengthxwidth 51 7 NOTI«• ' If home Is a single Wlde fill out one half of the blocking plan If honfe is a triple or quad Wide sketch In remainder of home �ERMIT WORK -SHEET page 1 0 w Home . ❑ Used Home me installed fo the Manufacturer's installation Manual Cow, [] Home is installed in accordance with Rule 16.0 jam. Singip wide ❑ Wind Zone II 0 Wind Zone 111 r-• Double wide installation Deca�ll# �V1� 'frlple/Quad ❑ serial # Cr S GS-- 3 i I4 I understand Lateral Arm Systems'cannot be used on any home (new or •) _ PIER SPACihIG TABLE FOR USED HoMEs where the sidewali ties exceed 5 ft 4 in. installer's initials / Typical pier spacing 2' IL,/ ' lateral Load beattng capaolly Footer size (sq ln) 16' x 16' (25e) 181/�' x 1 S 1/2' 20' x 20' (342) (400) 22' x 22s (484)' 24' X 24' (576)• 2( 100D 361 0.0 s 4 6 6 DDO s 6 8 8 2,500 s 6 8 8 30s 00 8 8 3 0 $• g PIER PAD SIZES I-beam pier pad size iG22 Perimeter pier pad size %cZ 7— Other pier pad sizes (required by the mfq:) ®'Draw the approximate locations of marrial wall openings 4 foot or greater. Use this symbol to show the piers. List all marriage wall openings greater than 4 foot and.their pier pad sizes below. POPULAR AD'S1 Ann, 4 ft L---' 5 It FRAM E T1E5 within 2' of end.of horr spaced at Cl 4" oo _ TIEDOWN COMPONENTS OTHER TIES Nurr, L.0119ltudinal Stablllzing Device (LSD) Sidswall Manufacturer. wr,A)vt ^v.. 5v_s4e r.J Longitudinal Longitudinal S ablllz! Devlcg w/ ateral Ardrs Marriage wall Manufacturer�r� JSrS J Shearwall Opening Pier pad -.size ZS�7f/ (7 k2Z f ,� j .. f :.• ': PERMIT WORKSHEET ( page 2 of 2 PERMIT NUMBER POCKET PENETROMETER TEST The pocket penetrometer tests are round d to psf or check hereto declare 1000 lb, soil Le without testing. X POCKET PENETROMETER TESTING METHOD i. Test the perimeter of the home at 6 locations, 2. Take the reading at the depth of the•fcoter S. UAIng 600 lb, increments, take the lowest readiniq and round down to that increment. X TORQUE PROSE TEST The results of the torque probe test is 3 C/o inch pounds or check here if you are declaring 5' anchors without testing . A test ds showing 275 inob pounor less will require 5 foot' Note: -A state approved lateral arm system is being used and 4 ft. .anchors are allowed at'the sidewall locations. i understand 52 anchors are required at all centerline tie points where the torqus test reading Is 275-or less and where the mobile i ome manufacturer may requires anchors with 4000 lb holding capacity. Installer's initials ALL VESTS DUST BE PERFORMED BY A LICENSED INSTALLER Installer Name (iU Y A) N e Date Tesfed - - • Electrioaa - 'bnnW electrical conductors between multi -wide units, but not to the main power ource. This•Ingludes the bonding wire between molt -wide units. Pg. — Plumbirig ", Site Pre aratlon Debris and organic material removed Wafer drainage; NaturalSwale >° Pad Other_ irk° Z Fastenin multiwldeunit� Q Floor. Type Fastener lA% - Length; ��� Spacing: Zy Walls. Type Fastener. _ A�. Length: !_ Spacing: ?,V �� Roof: Type Fastener: t,+4•�_ Length;.'! Spacing: Zy�� For. used homes a min. 30 gauge,;8" wide, galvanized metal strip be will centered over the peak of the •roof and fastened with gaiv. O roofing nails at 2" on center on both sides of the centerline, LU (.) C) Gasket worth reolln' ulrm&.t 1 understand a properly installed gasket Is a requirement of all new and used homes and that condensation, mold, meldsw grid buckled marriage walls are a result of a poorly Installed or no gasket being installed. I understand trip of tape will not serve as a gasket, installer's initialsZ. Type gasket ?C'-W installed: Pg. Between Floors Yes _ 4! Between Walls Yes - Bottom of ridgebeam Y` weatherprooftnt7 The bottomboard will be repaired and/or taped, Yes ---�Pq, Siding on units is installed to manufacturer's specifications, as Fireplace chimney Installed so as not to allow intrusion of rain water. Yes MisaelianeoUs Skirting to be.installed. Yes No Dryer vent installed outside of skiiiing. Yeses N A Range downflow vent installed'outside of skirting. _Yes - `-WA Drain lines supported at 4 foot intervals, Yes Electrical crossovers protected, Yes Other: nnneot all sewer drains to an existing sewer tap or septic tank. Pg, �� L verifies all. inform- anon given. with thfa� permit Workshest is sopurate and true based'on the onnect all potable water supply piping to an axis ' g water meter, water tap, or other Installer signature �r.���� Date SL511�11 idependent water supply systems, Pg,