Loading...
HomeMy WebLinkAboutLetter; Monitoring Installation of Helical Piers�1120M --' C q c THE SHAFFER GROUP, INC. �Q 2440 SE FEDERAL HWY (SUITE 110) Qa o STUART, FL 34997-1795 p PH: 772.220.4990 rj (2� 07/11/13 001 To: ST. LUCIE COUNTY BUILDING DEPT. PERMIT #: 13030179 OWNER: SILVER LINE PLASTICS 3206 ENTERPRISE ROAD FORT PIERCE, FL. r RE: MONITORING INSTALLATION OF HELICAL PIERS WITH TRU-LIFT BRACKETS PER APPROVED PLAN LOCATED @ ABOVE ADDRESS CERTIFICATION Gentlemen, We have observed some of the installation and the completion of (64) helical piers placed according to the approved plans for this job. In addition we reviewed the "Log Report" and observed that all piers developed more than 25kips which exceeds the design values. Concrete pads were formed at each pad & the location of piers were set per plan. The brackets. were; installed per the manufacturer's specifications. We hereby certify that this installation meets or exceeds the design values of the structural design required by Chubb Engineering the "Engineer of Record" on this _project..The work done is in substantial accordance with the plans and specifications as submitted. In addition, the finished product (piers) appears to have been done in a good workmanship like manner. 2013 ,redrick`D: Shaffer, F ° fKFE a ° �40R19'-' s6r�f f 11 f lA f 1100 0���� ;a