HomeMy WebLinkAbout10200 Isle of Pines- permitAll APPLICABLE INFO MUST BE COMPLETED FOR APPLICATION TO BE ACCEPTED
Date: Permit Number:
LV
Building Permit Application
Planning and Development Services
Building and Code Regulation Division Commercial Residential
2300 Virginia Avenue, Fort Pierce FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1578
PERMIT APPLICATION FOR: (Ozf aywcp fry -rc-
PROPOSED IMPROVEMENT LOCATION:
f
Address v `a� ^� s`rpt�- bi
PropertyTax ID #: 3P t - 766) - Co lwi" nn Lot No.
Site Plan Name: ll la k L C�i� � �'' Block No.
Project Name:
CONSTRUCTION INFORMATION:
Additional work to be performed under this permit- check all that apply:
_Mechanical _ Gas Tank _ Gas Piping Shutters Windows/Doors Pond
Electric _ Plumbing _ Sprinklers _ Generator :— Roof a�-- Pitch
Total Sq. Ft of Construction: t Sq. Ft. of First Floor: —
Cast of Construction: $ � f , Utilities: —Sewer —Septic
Building Height: _ i_
OWNER/LESSEE:
CONTRACTOR:
Name "., yL e rI I ff-
Name: _ ' s i
Address: 1l-) 0 oe ! "�
'
Company: U J 4>ti'
City: JO.-{ S-k [V(i State:
Zip Code: JC�q �tP Fax:
PhoneNo. I _ �1Li
Address: Ski `c , , ]V
City: ;l�f �' �,t<'lI _State:
Zip Code:. Fax:
Phone No �rifq
E-Mail:L) .t c�� InPI ISv`I��- 1¢
Fill in fee simple Title Holder on next page if different
from the Owner listed above)
E-Mail i. CA 00
State or County License I J 611(P
If value of construction is 2500 or more, a RECORDED Notice of Commencement is required.
If value of HAVC is $7,500 or more, a RECORDED Notice of Commencement is required.
SUPPLEMENTAL CONSTRUCTION LIEN LAW INFORMATION:
DESIGNER/€NGINEER: _ Not Applicable MORTGAGE COMPANY: Not Applicable
Name:_
Address:
City:
Zi p:
Phone
FEE SIMPLE TITLE HOLDER:
Name:
Address:
Citv:
Zip: Phone:_
State
Not Applicable
Name:
Address:
Citv:
Zip: ^ Phone:.
BONDING COMPANY:
Name:
Address:
City:
Zip: Phone:
State:
Not Applicable
OWNER CONTRACTOR AFFIDVIT: Application is hereby made to obtain a permit to do the work and installation as indicated.
I certify that no work or installation has commenced prior to the issuance of a permit.
St. Lucie County makes no representation that is granting a permit will authorize the permit holder to build the subject structure
which is in conflict with any applicable Home Owners Association rules, bylaws or and covenants that may restrict or prohibit such
structure. Please consult with your Home Owners Association and review your deed for any restrictions which may apply.
In consideration of the granting of this requested permit, I do hereby agree that I will, in all respects, perform the work
in accordance with the approved plans, the Florida Building Codes and St. Lucie County Amendments.
The following building permit applications are exempt from undergoing a full concurrency review: room additions,
accessory structures, swimming pools, fences, walls, signs, screen rooms and accessory uses to another non-residential use
WARNING TO OWNER: Your failure to Record a Notice of Commencement may result in paying twice for
improvements to your property. A Notice of Commencement must be recorded in the public records of St.
Lucie County and posted on the jobsite before the first inspection. If you intend to obtain financing, consult
.,;+6, Ir,v,.J.,. — — 'ttnrnne, k fnra rnmmc nrinv lAfnrle nr rprnrrfina 11n1lr NntirP of CnmmPne.Pment.
Signature of Owner/ Less e Contractor as Agent for owner
Signature of Con ac o License Holder
STATE OF FLORIDA I
t�,Z--
STATE OF FLORIDA I
COUNTY OF L,�t
COUNTY OF
Sworn •o (or affirmed) and subscribed before me of
Swor�to (or affirmed) and subscribed before me of
Notarization
Physical Presence or Online Notarization
✓ Physical Presence or Online
this z9O day of JQ,%\ , 202f by
this o'C;--) day of JW) 2021 by
_
Name of person making statement.
Name of person making stateme
IdentificaCo
n
Personally Known OR Produced Identification
Personally Known OR Produced
? o
Type of Identification
Type of Identification
Produced
Produced
o
CL
m m
:N
(Signature of Notary Public- State of Florida
(Signature of Notary Public_ State of FI rida)
M G- 2
Commission No. (Seal)
Commission No. (Seal)
N m W
0-o cri 0
,';�' W ��
X
REVIEWS
FRONT
ZONING
SUPERVISOR
PLANS
VEGETATION
SEA TURTLE
MANGROVE
COUNTER
REVIEW
REVIEW
REVIEW
REVIEW
REVIEW
REVIEW
DATE
RECEIVED
.--•-
DATEr
OI�lS7q�lr
COMPLETED
`' :;
Rev. 5
pJ n ..-`;an 0 GG ' uu,
.4. Si; �%op rihi551017 t;xPir,,
w � �
www StLucieRoofing.net
1919 SW South Macedo Blvd • Port St. Lucie, FL 34984
Office (772) 344-7193 • JeffH.SLR@Gmail.com
License #CCC 1330816
Date: 1 /14121
Owner Name: Buddy Merritt
Address: 10200 Isle Pines Court
Port 5t Lucie FL 34986
Phone #: 864-710-8196
Email Address: 0uala1247@bllsouth.net
bell ISM- W-
PROPOSAL/CONTRACT
SCOPE OF WORK: STLU CIE ROOFING HEREBY SUB MITS THE FOLLOWING SPECIFICATIONS AND ESTIMATE:
n Complete removal of existing roofing materials down to plywood decking
21 Inspect plywood sheathing for nailing patterns and damages. Re -Nail to meet current local building code
A Replace up to 2 sheets of damaged plywood if necessary; Any additional sheets of plywood will be charged at S7S.00 per sheet
U Replace damaged fascia as needed, additional charges per foot will apply
✓ All accessory metals to be 26GA
21 Bid includes new pipe stacks and standard vents to existing locations as needed
21 Complete installation of peel and stick underlayment Boral Tile Seal underlayment
❑ Installation of galvanized steel metal roof system Gauge Profile r J
❑ Complete installation of 301b A5TM D-226 felt paper using tin tabs or round caps
❑ Installation of Limited Lifetime Warranted —FL Building Code Approved -architectural shingle roof system
A installation of tile roof system Boral Manufacturer HOA approved Profile HOA approved Color
❑ Flat roof to receive a single ply modified bitumen rubber roof system _ torch applied _ peel and stick
A Bid includes 3 off ridge vents (this excludes Standing Seam Metal Roof Systems)
❑ Skylights:_ Replace existing with new _ Close up skylight (does not include any interior work) �2x2-2x4 _Custom
D6 Gutters: — Under drip edge ✓ Must be removed prior to tear off _ No gutters
❑ Cable/Network Antennas — Active _ Not Active
❑ Solar panels _ Remove and dispose _ Must be removed prior to tear off
J Bid includes taxes, permit fees (if applicable,] daily trash removal, dump fees, labor and materials
❑ REPAIRS ONLY: All repairs come with a year workmanship warranty at leak area only
Remove existin* Roof down toplywood renail to Code with 8d, Install Boral Tile underla ment to Code
Install HOA approved Boral Tile wit�olyfoam and 3 off ridd e vents with Permit
New roof comes with a __year workmanship warranty and manutacturer'Swarranty.
For Office Use Only
Shingle Color_____ Manufacturer __---^—MetalColor(IfApplicablel_
LlnderlaymentL)pgrade(If Applicable)___ HOMEOWNER INITIALS
THIS AGREEMENT IS SUBJECT TO ALL APPLICABLE LAWS, REG ULATIONS AND ORDINANCES, AND TO TH E FOLLOWING TERMS AND CONDITIONS
1. We have the right to stop work, without first giving notice to you If any payment requested by this agreement is not paid by its due date. We are not required to start work again until the
required payments have been made, You agree to ,pay all reasonable attorney's fee and costs incurred by us if we have any attorney to enforce any part of this agreement. Should we file a
mechanic's lien against the property, you agree to pay the costs of preparing, sorving and filing the mechanic's lien, including reasonable attorney fees. If any payment required by this
agreement is not received by its due date you agree to pay interest on the unpaid balance at the rate of 18%per year.
2. We are not responsible for damages from fire, windstorm, acts of god or other hazards that are normally covered by homeowner's insurance.
3. Replacement of the deteriorated decking, roof jacks, ventilators, flashing or other materials, unless stated otherwise in this contract, are not included and additional charges will apply.
(tabor rate $93.00 per hour)
4. We are not responsible for delays caused by (i) anythingdone or not done by owner oranyone hired or employed by homeowner( ii) unauthorized changes to the work(M) anywork
delayed by homeowner for reasons at her than weather/acts of god or not authorized by contractor (iv) disputed labor (v) fire or other casualties (vii) delays in material delivery by
suppliers
5. Duringthe period of the any warranty we are not responsible far anydamage below the roof due to leaks caused bywind/rain storms In excess of SSMPH winds
6, Flat Roofs: Contractor accepts no responsibility whatsoever for pond!ng or standing water
1. St Lucie Roofing's Warranty is not valid until contract price (including upgrades and change orders items) are paid in full
9. Soffit repair orreplacement is not included in this hid
9. Building material supply companies and St. Lucie Roofing are not responsible for damages to the drive way during de very and or damages beyond our control
10. Final payment Is due prior to final inspeLl
11. Issues regarding damage to the property in or around the construction area will be addressed on a case by case basis. With substantia! evidence, repairs to the damage will be considered
by St. Lucie Roofing. This could require obtaining three quotes and the homeowner may he responsible for the cost of the repafr(s.)
12. ALL ROOF SURFACES WILL BE LEFT IN A WATER PROOF CONDITION AT THE END OF EACH WORK DAY
13. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders
14, This contract represents the entire agreement of the parties. It may not be amended or modified, unless in writing and signed Jay the parties. In the event of any dispute between the
parties relating to orarising out of this agreement, the parties shall submit to pre -suit mediation in St Lucie County prior to filing suit. Venue forany litigation related to orarising out of
the work performed shall lie solelyln St Lucie County. The parties furtherwaive trial by jury. In the eventof any litigation related to or arising out of the work performed the prevailing
party shall be entitled to an award of reasonable attorney's fees
WE PROPOSE HEREBYTO FURNISH MATERIAL AND LABOR — COMPLETE IN ACCORDANCE WITH THE TERMS ABOVE FOR THE SUM OF:$ 39,995.00
Roof Replacement Payment Schedule — 30% Contract Signing 40% Progress and 30% at completion / Roof Repair Payment Schedule — 50% Contract
Signing, balance on completion. We accept payments via check,cash,money order orcredit card (4.99%credit card fee pertransaction)
Please Note: Due to sudden price increases from supply companies due to demand/acts of god lie. Hurricanes, floods etc.) by manufactures and/or utors, bid is subject to Chang .
TH 15 PROPOSAL MAY BE WITHDRAWN BY 5T LU CIE ROOFING IF NOT ACCEPTED W �IN/.4Ur
Authorized Signature Jeffrey Hampson Date 1/14/21 Homeowner Signature lr-f Date 2 {
j� n � 0 � 1 1 Ii 1 p
Deposit Arri t: C✓ Form of Deposit: C_.�' `� 1 1 Employee Initials: