HomeMy WebLinkAbout30 day power releasePlanning & Development Services
Building & Code Regul?tion Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
for 30-Day Temporary Power Release
—/ Date: _0Request
r l Permit Number: 3�
ProjectAddress: `v-� � �i//Jr- �1 ti n
711E UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. DAYS,
CONSIDERATION OF APPROVAL OF THE
REQUEST WE HERFBY ACKNOWLEDGE AND AGREE AS FOLLOWS:
1 • This temporary power release is requested for the above stated purpose only, and them will be no
occupancy of any type, other than that permitted by construction during this time period.
Z. As witness by our signatures we hereby agree to abide by all terms and conditions of this agreement,
including Building Division Policy, which is incorporated herein by reference.
3. Ahl conditions and requirements listed in the attached document entitled "Requirements for 30 Day
Power for Testing" have been fulfilled and the premise is ready for compliance Jnspeetion.
9. All requests for an extension beyond 30 days must be made in viriting to the Building Official stating
the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if
the final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIA8ILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT,
Q1VN SIGNATURE
GENERAL CONTRACTOR SIGNATURE
a��- i Ml;.-"L I.VIN f KAt,. I UK SIGNATURE
i
DAT
D4TE
DATE