HomeMy WebLinkAboutBuilding design specsi
Customer: Victor Melendez Date 12/18/2020
ADDENDUM 1
Confirmation of building specifications and other information
^N& -Building Design Specifications
E V E RSAF E boor and Window Locations Roof Tvpe
cote: Walk door and window locations are approximate and may change slightly when Installed in the field. If
calk door or window installed on the eave side of the building does not fall between legs, a $150 header fe
till be charged. If a walk door (or similarly sized) frame -out does not fall between legs, an $85 header fee wi
e charged. If a window (or similarly sized) frame -out does not fall between legs, a $70 header fee will b
harged.
Building Color Selections:
Walls
Saddle Tan
Roof
Barn Red
Trim
Barn Red
-BOXED SAVE
\tom\\c��`•,, �..
i
VERTICAL'
Note: Obtaining a drainage plan, site survey, site development
plan, floor plan and termite treatment are Buyer's
responsibility.
'Note: As built drawings take approximately 4-6 weeks to complete. Any revisions made to the building after one week of the date on this document that Impacts the drawings lie. a
changes to building dimensions, any changes to door/window/frame out locations) WILL result In an additional charge for new plans and will add an additional 4 6 weeks to the timeline
complete them.
Signed
Date
Victor Melendez
Eversafe Buildings 11175 Cicero Dr Ste 135