DATE TESTED:KSM JOB #:210062-2d/MH/ct
PERMIT #:NUC #630
CONTRACTOR:St. Pierre Construction Nuc Model:MC-1DR-P
JOB LOCATION:15358 Navion Drive Nuc Serial #:30630
Port St Lucie, Florida
ITEM TESTED:Compacted Founndation Fill - 1st & Final Lift
TEST LOCATION
OF SAMPLE DEPTH PEN
READ
DRY
DENSITY
MAX. DRY
PROCTOR VALUE (P.C.F)
PERCENT
COMPACTION
1. S.E.12" - 24"42 112.8 114.5 98.5%
2. Center "44 113.8 "99.4%
3. N.W."43 113.6 "99.2%
4. S.w.0" - 12"43 113.7 "99.3%
5. Center "45 114.4 "99.9%
6. N.E."44 113.9 99.5%
Soil Description:
Brown Clayed Sand
with Shell Fragments
In Place Moisture:
9.3%
Proctor Optimum Moisture:
12.0%
Proctor Max. Dry Density: P.C.F.
114.5
@ Test Locations the Density &
Penetrometer readings indicate the
Degree of Compaction Meets
Minimum Requirement
for Unstaked Foundation
Respectfully Submitted:
Bryan E. Dahlke, P.E.
V.P. of Engineering
PE # 81439 1/22/2021
Email to: wstpierreconstruction@gmail.com
SOIL COMPACTION REPORT
ASTM D 1557 and ASTM D 6938
January 21, 2021
2012-0364
Disclaimer:Contractor is responsible to maintain
the tested area in the condition that KSM
completed the indicated passed compaction test.
KSM is not responsible if the tested area has been
altered from the approved inspected condition.
Proudly Serving Florida since 1990
111.0
112.0
113.0
114.0
115.0
116.0
9 10 11 12 13 14 15
W
E
I
G
H
T
P
.
C
.
F
.
D
R
Y
Moisture -% of Dry Weight