Loading...
HomeMy WebLinkAboutPower Requestbate: 1 /22/2021 Plannling. at Development selrvices Building' & Code:Regulat�on Dv no 2.3.06 Virginia Ave F Drt Pierce, F 34932 i72462-2165 Pax 772462.m 443 Permit Number: 200�-0400 Project Address: Waterstone Lot 54 - 5209 Arming Place THE UNDFRSIG(VED HERESY REQUEST Ft�L�ASE aF ELECTRICAL P01lVER T`Q THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE BEQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS. FOLLOWS: i. This temporary power release is requested for the above stated purpose only, and there wilt. be ho occupancy of any type, other than that permitted by construction during this time period. 2, As, witness by our signature_ s, we hereby agree to abide by all terms and conditions of this agreement, Including Building Division Policy, which is incorporated herein by reference, 3: All conditions and requirements listed In the attached document entitled `'Requirements for 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance inspection. All requests for an extension beyond 30 days must be made in writing:to the Building Official stating the reason for the request. Power may. be removed from the site and/or a Stop Work Orderd issued if the Final. Inspection has.not been approved. within 30 days. A fee of $100.00 will be required.to lift thestop Work Order, WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH. MAY ARISE_ NO,W OR IN THE.FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO.THE. DISCONNECTION OF ELECTRICAL. POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT. / Kevin Borlce�lagei� 1 /22/2021 OWN R ATURE DATE Joseph Spalt 1/22/2021 GENERAL CONTRACTOF7SIGNATURE CONTRACTOR SIGNATURE DATE DATE 1