Loading...
HomeMy WebLinkAboutpower ReleaseDate: 1 /22/2021 planning at Development Selrvices Building & Code,Regulatlon Division 2308 Virginia Ave Fort Pierce, FL 34982 772462-2165 Fax 772462.m 443 I�equ�st far 3t��t�a7 '�emnparary Parer Release Permit Number: 2007-0398 Project Address: Waterstone Lot 53 - 5205 Armina Place THE UNDERSZGIVED HEREBY REQUEST RELEASE QF ELECTRICAL POIIVERTO THE ABOVE DESCRIBED. PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OL THE BEQUEST WE HEREBY ACKNOWLEDGE AND -AGREE AS FOLLOWS: i. This temporary power release is requested `for the ebove stated purpose only, and there will be no occupancy of any type, other than that permitted by conskruction during this time period. 2, As witness key our signatures, we her0by agree to abide. y all terms and conditions of this agreement, including Building,Divislon Policy, which Is incorporated herein by -reference. 3: All conditions and requirements listed In the attached document entitled ``Requirements For 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance inspection. �+. All requests for an extension beyond 30 days must be made in writing:to the Building Official stating the reason for the request. Power may. be removed from the site and/or a Stop Work OrderoIssuedif the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the.Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILrfIES AND CLALMS OF ANY TYPE OF NATURE VIlHICH. MAY ARISE. NO_W OR IN THE.FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAYBE INCURRED DUE TO THE. DISCONNECTION OF ELECTRICAL, POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT, Bolicen�lage>dl 1/22/2021 OWN R c ATURE DATE Joseph 5palt 1 /22/2021 GENERAL CONTRACTO SIGNATURE DATE CONTRACTOR;SICNATURE 1 /22/2021 DATE