HomeMy WebLinkAboutpower ReleaseDate:
1 /22/2021
planning at Development Selrvices
Building & Code,Regulatlon Division
2308 Virginia Ave
Fort Pierce, FL 34982
772462-2165 Fax 772462.m 443
I�equ�st far 3t��t�a7 '�emnparary Parer Release
Permit Number: 2007-0398
Project Address: Waterstone Lot 53 - 5205 Armina Place
THE UNDERSZGIVED HEREBY REQUEST RELEASE QF ELECTRICAL POIIVERTO THE ABOVE DESCRIBED.
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OL THE
BEQUEST WE HEREBY ACKNOWLEDGE AND -AGREE AS FOLLOWS:
i. This temporary power release is requested `for the ebove stated purpose only, and there will be no
occupancy of any type, other than that permitted by conskruction during this time period.
2, As witness key our signatures, we her0by agree to abide. y all terms and conditions of this agreement,
including Building,Divislon Policy, which Is incorporated herein by -reference.
3: All conditions and requirements listed In the attached document entitled ``Requirements For 30 Day
Power for Testing" have been fulfilled and the premise is ready for compliance inspection.
�+. All requests for an extension beyond 30 days must be made in writing:to the Building Official stating
the reason for the request. Power may. be removed from the site and/or a Stop Work OrderoIssuedif
the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift
the.Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILrfIES AND CLALMS OF ANY TYPE OF NATURE VIlHICH. MAY ARISE. NO_W OR IN THE.FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAYBE INCURRED DUE TO THE.
DISCONNECTION OF ELECTRICAL, POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT,
Bolicen�lage>dl 1/22/2021
OWN R c ATURE DATE
Joseph 5palt 1 /22/2021
GENERAL CONTRACTO SIGNATURE DATE
CONTRACTOR;SICNATURE
1 /22/2021
DATE