Loading...
HomeMy WebLinkAbout30 day Temporary Power ReleasePlanning. ,&.. - Development. Services Wlldl.qgmde:;Regulatlon Division .." I., i 2$0,V-sigin VirginiaAve RECEIVED Fort Pierce, FL.34982 77 i-4,62--2-1,65 Fax 772-462-6,44MAR 2 2019. ST. Lucie County, Permitting Request. -for -3.0.-Day Temporary Power Release Date: J-2 7 -ZO)? Perm. itNurriber: 171Z - opo Project Address: V,4 7;-'-.S 4ofa /'dfr �1_,4eee THE UNDERSIGNED, HEREBY REQUEST .RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A,PERIOD NOT TO EXCEED THIRTY (30),DAY-S,TOR THE PURPOSE OF TESTING -SYSTEMS AND EQUIPMENT IN PREPARATION INSPEC'--T'.I'ON.--' IN CONS-IDERATIO&O"F'APPROVAL OF THE REQUEST WE HEREBY ACKNOWL%1GE, AND -AGREE AS FOLLOWS: 1. This temporary power release1s: requested for the above stated purpose only, and there will be no occupancy of any type, other-th6nAhat. permitted by, -construction during this time period. 2. As witness by our signatures, w6.hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy,: which.,is incorporated herein by reference. 3. All conditions and requ.1irem,erits,listed-In the attacheoAocumententitled "Requirements -for. 30 Day Power for Testing" have,.beentulfille -and the prem complia fice inspection. d premise is ready,for 4. All requests for an exten'siowbeyprid 30 days must, be mide,in writing to -the Building -Qffitial stating the reason for the request", -Power -may be removed---frorn the site.and/or a Stop Work Order Issued if the Final Inspection has..,h-ot,,j�ei!h,,-,.approved within.J.0 days. Afee -of $100.00 wi . lFbe reqUired,tb lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS,, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW, OR IN THE FUTURE, OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE -WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF-ELECTRICALPOWERIN THE E-VENTOFVIOLAT-ION VIOLATION ;OF AGREEMENT. EMENT. R - E 7- 2619 OWNER SIGNATURE DATE GENERAL CONTRACTOR SIGNATURE DATE