Loading...
HomeMy WebLinkAboutEnergy CodeFORM R405-2017 FLORIDA ENERGY EFMCIENCY CODE FOR BUILDING. CONSTRUCTION Florida Department of Business and Professional Regulation - Residential. Performance Method Project Name: WYN E GRAND CAR TON WPACT Builder Name: WYNNE BUILDING COPR. Street: CP, s Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE', FL, Permit Number: Owner: WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY Design Location: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) 1. New construction or existing New (From Plans) 9. Wall Types (1442.0 sqft.) Insulation Area 2. Single family or multiple family Single-family a. Concrete Block - Int Insul, Exterior R=4.1 1250.00 ft2 b. Frame - Wood, Adjacent R=11.0 192.00'ft2 3. Number of units, if multiple family 1 c. N/A R= ftZ 4. Number of. Bedrooms 2 d. N/A R= ft2 5. Is this a worst case? Yes 10. Ceiling Types (1476.0 sqft.) Insulation Area a. Under Attic (Vented) R=30.0 1446.00ft2 6. Conditioned floor area above grade (ftZ) 1446 b. Knee Wall (Vented) R=19.0 30.00 ft2 Conditioned floor area below grade (ft2) 0 c. N/A R= ft2 11. Ducts R ft2 7. Windows(141.3 sqft.) Description Area a. Sup: Attic, Ret: Attic, AH: Attic 6 175 a. U-Factor: Sgl, U=1.:04 101.25 ft2 SHGC: SHGC=0.29 b. U-Factor: Sgl, U=1A 1 40.00 ft2 12. Cooling systems kBtu/hr Efficiency SHGC: SHGC=0.27 a. Central .Unit 34.8 SEER:15.00 c. U-Factor: N/A ft2 SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a. Electric Heat Pump 34.8 HSPF:8.50 SHGC: Area Weighted Average Overhang Depth: 3.832 ft. Area Weighted Average SHGC: 0.284 14. Hot water systems 8. Floor Types (1445.5 sqft.) Insulation Area a. Electric Cap: 50 gallons a. Slab -On -Grade Edge Insulation R=0.0 1445.50 ft2 b. Conservation features EF: 0.970 b. N/A R= ft2 None c. N/A R= ft2 15. Credits Pstat Total Proposed Modified Loads: 47.47 Glass/Floor Area: 0.098 PHASS Total Baseline Loads: 48.09 I hereby certify that the plans and specifications covered by Review of the plans and'lyl?,• this calculation are in compliance with the Florida Energy specifications covered by this".gyp Code. calculation indicates compliance with the Florida Energy Code. PREPARED BY; a Before construction is completed DATE` this building will be inspected for compliance with Section 553.908 I hereby certify that this building, as designed, is in compliance Florida Statutes. . with the Florida Energy Code.. OWNER/' BUILDING OFFICIAL: DATE:- DATE: - Compliance requires certification by the air handler unit manufacturer that the air handier enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an. Air -Barrier And Insulation Inspection Checklist.in accordance with R402.4.1.1 and•this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). f%% 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: WYNNE THE GRAND CARL Bedrooms: 2 Address Type: Street Address Building Type: User Conditioned Area: 1446 Lot # Owner Name: WYNNE BUILDING CROP Total Stories: 1 Block/Subdivision: # of Units: 1 Worst Case: Yes PlatBook: Builder Name: WYNNE BUILDING COPR. Rotate Angle: 180 Street: Permit Office: ST. LUCIE COUNTY Cross Ventilation: No County: St. Lucie Jurisdiction: ST. LUCIE COUNTY Whole House Fan: No City, State, Zip: FT. PIERCE , Family Type: Single-family FL , New/Existing: New (From Plans) Comment: CLIMATE / Design Temp Int Design Temp Heating Design Daily Temp V Design Location TMY Site 97.5 % 2.5 % Winter /Summer Degree Days Moisture Range FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Entire House 1446 11568 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 BEDROOM 30.1 2408 No 0 1 1 Yes Yes Yes 2 WIC 63 504 No 0 1 No Yes Yes 3 M.BATH 56 448 No 0 1 Yes Yes Yes 4 KITCHEN 192 1536 Yes 0 1 No Yes Yes 5 BATH 45 360 No 0 1 Yes Yes Yes 6 . BEDROOM 2 204 1632 No 0 1 1 Yes Yes Yes 7 ENTRY 55 440 No 0 1 Yes Yes Yes 8 LAUNDRY 42 336 No 0 1 Yes Yes Yes 9 GREAT/DINING 488 3904 No 0 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio BEDROOM 52 ft 0 301 ft2 ---- 0 1 0 2 Slab -On -Grade Edge Insulatio WIC 1 ft 0 63 ft2 ____ 0 1 0 3 Slab -On -Grade Edge Insulatio M. BATH 8 ft 0 56 ft2 ____ 0 1 0 4 Slab -On -Grade Edge Insulatio KITCHEN 1 ft 0 192 ft2 ____ 0 1 0 5 Slab -On -Grade Edge Insulatio BATH 5 ft 0 45 ft2 ____ 0 1 0 6 Slab -On -Grade Edge Insulatio BEDROOM 2 32.2 ft 0 203.5 ft2 ___ 0 1 0 7 Slab -On -Grade Edge Insulatio ENTRY 7 ft 0 55 ft2 ___ 0 1 0 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5 FORM R405-2017 INPUT. SUMMARY CHECKLIST REPORT FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 8 Slab -On -Grade Edge Insulatio LAUNDRY 6 ft 0 42 ft2 ___ 0 1 0 9SIab-On-Grade Edge Insulatio GREAT/DINING 46 ft 0 488 ft2 ____ 0 1 0 ROOF / Roof Gable Roof Rad Solar SA Emitt Emitt Deck Pitch V # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Gable or Shed Metal 1524 ft2 240 ft2 Light N 0.6 No 0.9 No 0 181.4. ATTIC V # Type Ventilation Vent Ratio (.1 in) Area RBS IRCC 1 Full attic Vented 150 1446 ft2 N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic (Vented) BEDROOM 30 Blown 301 ft2 0.1 Wood 2 Under Attic (Vented.) WIC 30 Blown 63 ft2 0.1 Wood 3 Under Attic (Vented) M.-BATH 30 Blown 56 ft2 0.1 Wood 4 Under,Attic (Vented) KITCHEN 30 Blown 192 ft2 0.1 Wood 5 Under Attic (Vented) BATH 30 Blown 45 ft2 0.1 Wood 6 Under Attic (Vented) BEDROOM 2 30 Blown 204 ft2 0.1 Wood 7 Under Attic (Vented) ENTRY 30 Blown 55 ft2 0.1 Wood 8 Under Attic (Vented) LAUNDRY 30 Blown 42 ft2 0.1 Wood 9 Under Attic (Vented) GREAT/DINING 30 Blown 488 ft2 0.1 Wood 10 Knee.Wall (Vented) GREAT/DINING 19 Blown 30 ft2 0.11 Wood WALLS Adjacent Cavity Width Height Sheathing Framing Solar Belo()Mt TO Wall T�ipe Space w 1 NE=>SW Exterior Concrete Block - Int InsuBEDROOM 4.1 10 0 8 0 80.0 ft2 0 0 0.4 0 2 SW=>NE Exterior Concrete Block -a Int InsuBEDROOM 4.1 28 0 8 0 224.0 ft2 0 0 0.4 0 3 NW=>SE Exterior Concrete Block - Int InsuBEDROOM 4.1 14 0 8 0 112.0 ft2 0 0 0.4 0 4 SW=>NE Exterior Concrete Block - Int Insul M. BATH 4.1 8 0 8 0 64.0 ft2 0 0 0.4 0 5 NE=>SW Exterior Concrete Block - Int Insul BATH 4.1 5 0 8 0 40.0 ft2 0 0 0.4 0 6 NE=>SW Exterior Concrete Block - Int Ins8EDROOM 2 4.1 16 0 8 0 128.0 ft2 0 0 0.4 0 7 SE=>NW Exterior Concrete Block - Int Ins81EDROOM 2 4.1 10 0 8 0 80.0 ft2 0 0 0.4 0 8 S=>N Exterior Concrete Block - Int InsUEDROOM 2 4.1 4 3 8 0 34.0 ft2 0 0 0.4 0 9 SW=>NE Exterior Concrete Block - Int InsIREDROOM 2 4.1 2 0 8 0 16.0 ft2 0 0 0.4 0 10 SE=>NW Exterior Concrete Block - Int Insul ENTRY 4.1 6 0 8 0 48.0 ft2 0 0 0.4 0 11 SW=>NE Exterior Concrete Block - Int Insul ENTRY 4.1 1 0 8 0 8.0 ft2 0 0 0.4 0 12 SW=>NE Exterior Concrete Block - Int InsuLAUNDRY 4.1 6 0 8 0 48.0 ft2 0 0 0.4 0 13 NE=>SW Exterior Concrete Block - Int Ins0REAT/DINI 4.1 26 0 8 0 208.0 ft2 0 0 0.4 0 14 NW=>SE Exterior Concrete Block - Int Inst0REAT/DINI 4.1 20 0 8 0 160.0 ft2 0 0 0.4 0 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 FORM R405-2017 INPUT SUMMARY'CRECKD_IST REPORT WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below 15 N=>S Garage Frame - Wood KITCHEN 11 24 8 192.0 ft2 0.23 0.4 0 DOORS # Ornt DoorType Space Storms U-Value Width Ft In Height Ft In Area 1 SE=>NW Insulated ENTRY None .39 3 1 6 8 20.6 ft2 WINDOWS Orientation shown is the entered. orientation => Chan ed to Worst Case. / Wall # Ornt ID Frame Panes NFRC Overhang U-Factor SHGC Imp Area Depth Separation Int Shade Screening 1 NW=>SE 3 Metal 2 SW=>NE 4 Metal 3 SE=>NW 7 Metal 4 NE=>SW 13 Metal 5 NW=>SE14 Metal Low-E Single Low-E Single Low-E Single Low-E Single Low-E Single Yes Yes Yes Yes Yes 1.04 0.29 Y 32.9 ft2 1 ft 0 in 1 ft 5 in 1.04 0.29 Y 6.9 ft2 1 ft 0 in 1 ft 5 in 1.04 0.29 Y 24.0 ft2 6 ft 0 in 1 ft 5 in 1.04 0.29 Y 37.5 ft2 1 ft 0 in 1 ft 5 in 1.11 0.27 Y 40.0 ft2 8 ft 0 in 1 ft 5 in Drapes/blinds None None None Drapes/blinds Exterior 5 None None None Exterior 5 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 315ft2 315ft2 24ft 8ft 11 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000356 1349.6 . 74.09 139.34 .1233 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Singi HSPF:8.5 34.8 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central -Unit/ Split Singl SEER: 16 34.8 kBtu/hr cfm 0.8 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.97 50 gal 60.9 gal 120 deg None 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model # Collector Model # Area Volume FEF None None ftz DUCTS / ---- Supply ---- ---- Return --- Air :CFM 25 CFM25 HVAC # # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 Attic 6 175 ftz Attic 65 ft' Default Leakage Attic (Default) (Default) 1 1 TEMPERATURES Programable Thermostat: Y Ceiling Fans: Coolin Jan Feb Heating f X� Jan f X� Feb Mar Mar HX Apr Apr may ]May Jun M Jul �� X AugSe Oct Nov Dec H [ ]Jan [ ]Feb Mar Jun Jul Aug Sep Oct X Nov DecVenting Thermostat Schedule: HERS 2006 Reference Hours. Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ftz 0 ft 0.3 MASTER BEDROO Default(8 Ibs/sq.ft. ftz ft 0.3 WIC Default(8 Ibs/sq.ft. ftz ft 0.3 MASTER BATH Default(8 Ibs/sq.ft. ftz ft 0.3 M. BATH Default(8 Ibs/sq.ft. ftz ft 0.3 LAUDRY Default(8 Ibs/sq.ft. ftz ft 0.3 BEDROOM 2 Default(8 Ibs/sq.ft. ftz ft 0.3 DINING/GREAT R Default(8 Ibs/sq.ft. ftz ft 0.3 KITCHEN Default(8 Ibs/sq.ft. ftz ft 0.3 BATH Default(8 Ibs/sq.ft. ftz ft 0.3 HALL Default(8 Ibs/sq.ft. ft. ft 0.3 FOYER Default(8 Ibs/s .ft. ftz ft 0.3 BEDROOM 3 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017. FBC 6th Edition (2017) Compliant Software Page 5 of 5 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE:402.4.1.1 AIR BARRIER:AND INSULATIOWNSPECTION COMPONENT CRITERIA Project Name: WYNNE THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR. Street: Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE, FL, Permit Number: Owner: WYNNE BUILDING CROP Jurisdiction: _ ST. LUCIE COUNTY z Design Location: FL, Fort Pierce U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA . General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the.top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed.in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be; installed. to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the' underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I .vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be.provided between the garage and conditioned spat as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope.shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or cenlinaq a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 4/21/2020 10:32 AM EnergyGauge® USA 6.0:02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (E.PL) DISPLAY BARD ESTIMATED ENERGY PERFORMANCE INDEX* =. 99 The loafer the Energy Performance Index, the more -efficient the home. 1. New home or, addition 1. New From Plans) 12. Ducts, location & insulation level a) Supply ducts R 6.0 2. Single-family or multiple -family 2. Single-family -b) Return ducts R 6.0 c) AHU location Attic 3. No. of. units (if multiple -family) 3. 1 4. Number of bedrooms 4. 2 13. Cooling system: Capacity 34.8 a) Split system SEER 15.0 5. Is this a worst case? (yes/no) 5. Yes b) Single:package SEER c) Ground/water.source SEER/COP 6. Conditioned floor area (sq. ft.) 6. 1446 d) Room unit/PTAC EER e) Other 7. Windows, type and area a) U-factor:(weighted average) 7a. 1.060 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.284 14. Heating system: Capacity 34.8 c) Area 7c. 141.3 a) Split system heat pump HSPF 8.5. b) Single package heat pump HSPF 8. Skylights c) Electric resistance COP a) U-factor:(weighted average) 8a. NA d) Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace, LPG AFUE f) Other 9. Floor type, insulation level: a) Slab -on -grade (R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R-value) 9c. a) Electric resistance EF 0.97 b) Gas -fired, natural gas EF 10. Wall type and insulation: c). Gas fired, LPG EF A: Exterior: d) Solar system with tank EF 1. Wood frame (Insulation R-value) 10A1. e) Dedicated heat pump with tank EF I Masonry (Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec% B. Adjacent: g) Other 1. Wood frame (Insulation R-value) 1061. 11.0 2. Masonry (Insulation R-value) 1dB2. 16. HVAC credits claimed (Performance Method) 11. Ceiling ,type and insulation level a) Ceiling fans a) Under attic 11a. 30.0 b) Cross ventilation No b) Single assembly 11b. c) Whole house fan No c) Knee walls/skylight walls 11 c. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11 d. No e) Multizone heating credit f) Programmable thermostat Yes "Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving.features which will be installed (or exceeded): in this home before final inspection. Otherwise, a new EPL display card will .be completed based on installed code compliant features. Builder Signature: Date: Address of New Home..\ -I _`�c"" � City/FL Zip: FT: PIERCE, FL-;!�-Ac S7 4/21/2020 10:32:17 AM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1