HomeMy WebLinkAboutEnergy CodeFORM R405-2017
FLORIDA ENERGY EFMCIENCY CODE FOR BUILDING. CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential. Performance Method
Project Name: WYN E GRAND CAR TON WPACT
Builder Name: WYNNE BUILDING COPR.
Street: CP, s
Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE', FL,
Permit Number:
Owner: WYNNE BUILDING CROP
Jurisdiction: ST. LUCIE COUNTY
Design Location: FL, Fort Pierce
County: St. Lucie (Florida Climate Zone 2 )
1. New construction or existing New (From Plans)
9. Wall Types (1442.0 sqft.)
Insulation Area
2. Single family or multiple family Single-family
a. Concrete Block - Int Insul, Exterior
R=4.1 1250.00 ft2
b. Frame - Wood, Adjacent
R=11.0 192.00'ft2
3. Number of units, if multiple family 1
c. N/A
R= ftZ
4. Number of. Bedrooms 2
d. N/A
R= ft2
5. Is this a worst case? Yes
10. Ceiling Types (1476.0 sqft.)
Insulation Area
a. Under Attic (Vented)
R=30.0 1446.00ft2
6. Conditioned floor area above grade (ftZ) 1446
b. Knee Wall (Vented)
R=19.0 30.00 ft2
Conditioned floor area below grade (ft2) 0
c. N/A
R= ft2
11. Ducts
R ft2
7. Windows(141.3 sqft.) Description Area
a. Sup: Attic, Ret: Attic, AH: Attic
6 175
a. U-Factor: Sgl, U=1.:04 101.25 ft2
SHGC: SHGC=0.29
b. U-Factor: Sgl, U=1A 1 40.00 ft2
12. Cooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.27
a. Central .Unit
34.8 SEER:15.00
c. U-Factor: N/A ft2
SHGC:
13. Heating systems
kBtu/hr Efficiency
d. U-Factor: N/A ft2
a. Electric Heat Pump
34.8 HSPF:8.50
SHGC:
Area Weighted Average Overhang Depth: 3.832 ft.
Area Weighted Average SHGC: 0.284
14. Hot water systems
8. Floor Types (1445.5 sqft.) Insulation Area
a. Electric
Cap: 50 gallons
a. Slab -On -Grade Edge Insulation R=0.0 1445.50 ft2
b. Conservation features
EF: 0.970
b. N/A R= ft2
None
c. N/A R= ft2
15. Credits
Pstat
Total Proposed Modified Loads: 47.47
Glass/Floor Area: 0.098
PHASS
Total Baseline
Loads: 48.09
I hereby certify that the plans and specifications covered by
Review of the plans and'lyl?,•
this calculation are in compliance with the Florida Energy
specifications covered by this".gyp
Code.
calculation indicates compliance
with the Florida Energy Code.
PREPARED BY; a
Before construction is completed
DATE`
this building will be inspected for
compliance with Section 553.908
I hereby certify that this building, as designed, is in compliance
Florida Statutes.
.
with the Florida Energy Code..
OWNER/'
BUILDING OFFICIAL:
DATE:-
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handier enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an. Air -Barrier And Insulation Inspection Checklist.in accordance with R402.4.1.1 and•this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
f%%
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software
Page 1 of 5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: WYNNE THE GRAND CARL Bedrooms: 2
Address Type:
Street Address
Building Type: User Conditioned Area: 1446
Lot #
Owner Name: WYNNE BUILDING CROP Total Stories: 1
Block/Subdivision:
# of Units: 1 Worst Case: Yes
PlatBook:
Builder Name: WYNNE BUILDING COPR. Rotate Angle: 180
Street:
Permit Office: ST. LUCIE COUNTY Cross Ventilation: No
County:
St. Lucie
Jurisdiction: ST. LUCIE COUNTY Whole House Fan: No
City, State, Zip:
FT. PIERCE ,
Family Type: Single-family
FL ,
New/Existing: New (From Plans)
Comment:
CLIMATE
/ Design Temp
Int Design Temp Heating
Design Daily Temp
V Design Location TMY Site 97.5 % 2.5 %
Winter /Summer Degree Days Moisture
Range
FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90
70
75 299
62
Low
BLOCKS
Number Name Area Volume
1 Entire House 1446 11568
SPACES
Number Name Area Volume Kitchen Occupants
Bedrooms
InfilID Finished Cooled
Heated
1 BEDROOM 30.1 2408 No 0
1
1 Yes
Yes
Yes
2 WIC 63 504 No 0
1 No
Yes
Yes
3 M.BATH 56 448 No 0
1 Yes
Yes
Yes
4 KITCHEN 192 1536 Yes 0
1 No
Yes
Yes
5 BATH 45 360 No 0
1 Yes
Yes
Yes
6 . BEDROOM 2 204 1632 No 0
1
1 Yes
Yes
Yes
7 ENTRY 55 440 No 0
1 Yes
Yes
Yes
8 LAUNDRY 42 336 No 0
1 Yes
Yes
Yes
9 GREAT/DINING 488 3904 No 0
1 Yes
Yes
Yes
FLOORS
# Floor Type Space Perimeter Perimeter R-Value
Area
Joist R-Value
Tile Wood
Carpet
1 Slab -On -Grade Edge Insulatio BEDROOM 52 ft 0
301 ft2
----
0 1
0
2 Slab -On -Grade Edge Insulatio WIC 1 ft 0
63 ft2
____
0 1
0
3 Slab -On -Grade Edge Insulatio M. BATH 8 ft 0
56 ft2
____
0 1
0
4 Slab -On -Grade Edge Insulatio KITCHEN 1 ft 0
192 ft2
____
0 1
0
5 Slab -On -Grade Edge Insulatio BATH 5 ft 0
45 ft2
____
0 1
0
6 Slab -On -Grade Edge Insulatio BEDROOM 2 32.2 ft 0
203.5 ft2
___
0 1
0
7 Slab -On -Grade Edge Insulatio ENTRY 7 ft 0
55 ft2
___
0 1
0
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5
FORM R405-2017 INPUT. SUMMARY CHECKLIST REPORT
FLOORS
# Floor Type Space Perimeter Perimeter R-Value
Area
Joist R-Value
Tile Wood Carpet
8 Slab -On -Grade Edge Insulatio LAUNDRY 6 ft
0
42 ft2
___
0
1
0
9SIab-On-Grade Edge Insulatio GREAT/DINING 46 ft 0
488 ft2
____
0
1
0
ROOF
/ Roof
Gable
Roof
Rad
Solar
SA Emitt
Emitt Deck
Pitch
V # Type Materials Area
Area
Color
Barr
Absor.
Tested
Tested Insul.
(deg)
1 Gable or Shed Metal 1524 ft2
240 ft2
Light
N
0.6
No 0.9
No 0
181.4.
ATTIC
V # Type Ventilation
Vent Ratio (.1 in)
Area
RBS
IRCC
1 Full attic Vented
150
1446 ft2
N
N
CEILING
# Ceiling Type Space
R-Value
Ins Type
Area
Framing Frac
Truss Type
1 Under Attic (Vented) BEDROOM
30
Blown
301 ft2
0.1
Wood
2 Under Attic (Vented.) WIC
30
Blown
63 ft2
0.1
Wood
3 Under Attic (Vented) M.-BATH
30
Blown
56 ft2
0.1
Wood
4 Under,Attic (Vented) KITCHEN
30
Blown
192 ft2
0.1
Wood
5 Under Attic (Vented) BATH
30
Blown
45 ft2
0.1
Wood
6 Under Attic (Vented) BEDROOM 2
30
Blown
204 ft2
0.1
Wood
7 Under Attic (Vented) ENTRY
30
Blown
55 ft2
0.1
Wood
8 Under Attic (Vented) LAUNDRY
30
Blown
42 ft2
0.1
Wood
9 Under Attic (Vented) GREAT/DINING
30
Blown
488 ft2
0.1
Wood
10 Knee.Wall (Vented) GREAT/DINING
19
Blown
30 ft2
0.11
Wood
WALLS
Adjacent Cavity Width
Height
Sheathing Framing Solar
Belo()Mt
TO Wall T�ipe Space
w
1 NE=>SW Exterior Concrete Block - Int InsuBEDROOM
4.1 10
0 8
0
80.0 ft2
0
0
0.4
0
2 SW=>NE Exterior Concrete Block -a Int InsuBEDROOM
4.1 28
0 8
0
224.0 ft2
0
0
0.4
0
3 NW=>SE Exterior Concrete Block - Int InsuBEDROOM
4.1 14
0 8
0
112.0 ft2
0
0
0.4
0
4 SW=>NE Exterior Concrete Block - Int Insul M. BATH
4.1 8
0 8
0
64.0 ft2
0
0
0.4
0
5 NE=>SW Exterior Concrete Block - Int Insul BATH
4.1 5
0 8
0
40.0 ft2
0
0
0.4
0
6 NE=>SW Exterior Concrete Block - Int Ins8EDROOM 2
4.1 16
0 8
0
128.0 ft2
0
0
0.4
0
7 SE=>NW Exterior Concrete Block - Int Ins81EDROOM 2
4.1 10
0 8
0
80.0 ft2
0
0
0.4
0
8 S=>N Exterior Concrete Block - Int InsUEDROOM 2
4.1 4
3 8
0
34.0 ft2
0
0
0.4
0
9 SW=>NE Exterior Concrete Block - Int InsIREDROOM 2
4.1 2
0 8
0
16.0 ft2
0
0
0.4
0
10 SE=>NW Exterior Concrete Block - Int Insul ENTRY
4.1 6
0 8
0
48.0 ft2
0
0
0.4
0
11 SW=>NE Exterior Concrete Block - Int Insul ENTRY
4.1 1
0 8
0
8.0 ft2
0
0
0.4
0
12 SW=>NE Exterior Concrete Block - Int InsuLAUNDRY
4.1 6
0 8
0
48.0 ft2
0
0
0.4
0
13 NE=>SW Exterior Concrete Block - Int Ins0REAT/DINI
4.1 26
0 8
0
208.0 ft2
0
0
0.4
0
14 NW=>SE Exterior Concrete Block - Int Inst0REAT/DINI
4.1 20
0 8
0
160.0 ft2
0
0
0.4
0
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5
FORM R405-2017 INPUT SUMMARY'CRECKD_IST REPORT
WALLS
Adjacent
Space Cavity Width Height Sheathing Framing Solar
Below
15 N=>S Garage Frame - Wood
KITCHEN 11 24 8 192.0 ft2
0.23 0.4
0
DOORS
# Ornt
DoorType
Space
Storms U-Value Width
Ft In
Height
Ft In
Area
1 SE=>NW
Insulated
ENTRY
None .39 3 1
6 8 20.6 ft2
WINDOWS
Orientation shown is the entered. orientation => Chan ed to Worst Case.
/ Wall
# Ornt ID Frame
Panes
NFRC
Overhang
U-Factor SHGC Imp Area Depth Separation
Int Shade
Screening
1 NW=>SE 3 Metal
2 SW=>NE 4 Metal
3 SE=>NW 7 Metal
4 NE=>SW 13 Metal
5 NW=>SE14 Metal
Low-E Single
Low-E Single
Low-E Single
Low-E Single
Low-E Single
Yes
Yes
Yes
Yes
Yes
1.04 0.29 Y 32.9 ft2 1 ft 0 in 1 ft 5 in
1.04 0.29 Y 6.9 ft2 1 ft 0 in 1 ft 5 in
1.04 0.29 Y 24.0 ft2 6 ft 0 in 1 ft 5 in
1.04 0.29 Y 37.5 ft2 1 ft 0 in 1 ft 5 in
1.11 0.27 Y 40.0 ft2 8 ft 0 in 1 ft 5 in
Drapes/blinds
None
None
None
Drapes/blinds
Exterior 5
None
None
None
Exterior 5
GARAGE
# Floor Area
Ceiling Area
Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation
1 315ft2
315ft2
24ft 8ft
11
INFILTRATION
# Scope Method
SLA
CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Proposed ACH(50) .000356
1349.6 . 74.09 139.34 .1233
7
HEATING SYSTEM
# System Type
Subtype
Speed Efficiency Capacity
Block
Ducts
1 Electric Heat Pump/
Split
Singi HSPF:8.5 34.8 kBtu/hr
1
sys#1
COOLING SYSTEM
# System Type
Subtype
Subtype Efficiency Capacity Air Flow
SHR Block
Ducts
1 Central -Unit/
Split
Singl SEER: 16 34.8 kBtu/hr cfm
0.8 1
sys#1
HOT WATER SYSTEM
# System Type
SubType
Location
EF Cap Use SetPnt
Conservation
1 Electric
None
Garage
0.97 50 gal 60.9 gal 120 deg
None
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cert # Company Name
System
Model #
Collector Model
#
Area Volume
FEF
None None
ftz
DUCTS
/ ---- Supply ----
---- Return ---
Air
:CFM 25 CFM25
HVAC #
# Location R-Value Area
Location
Area
Leakage Type
Handler
TOT OUT QN RLF
Heat Cool
1 Attic
6 175 ftz
Attic
65 ft'
Default Leakage
Attic
(Default) (Default)
1 1
TEMPERATURES
Programable Thermostat: Y
Ceiling Fans:
Coolin Jan Feb
Heating f X� Jan f X� Feb
Mar
Mar
HX
Apr
Apr
may
]May
Jun
M
Jul
��
X AugSe
Oct
Nov
Dec
H
[ ]Jan [ ]Feb
Mar
Jun
Jul
Aug
Sep Oct X
Nov
DecVenting
Thermostat Schedule: HERS 2006 Reference
Hours.
Schedule Type
1
2
3
4
5
6
7
8
9 10
11
12
Cooling (WD) AM
78
78
78
78
78
78
78
78
80 80
80
80
PM
80
80
78
78
78
78
78
78
78 78
78
78
Cooling (WEH) AM
78
78
78
78
78
78
78
78
78 78
78
78
PM
78
78
78
78
78
78
78
78
78 78
78
78
Heating (WD) AM
66
66
66
66
66
68
68
68
68 68
68
68
PM
68
68
68
68
68
68
68
68
68 68
66
66
Heating (WEH) AM
66
66
66
66
66
68
68
68
68 68
68
68
PM
68
68
68
68
68
68
68
68
68 68
66
66
MASS
Mass Type
Area
Thickness
Furniture Fraction
Space
Default(8 Ibs/sq.ft.
0 ftz
0 ft
0.3
MASTER BEDROO
Default(8 Ibs/sq.ft.
ftz
ft
0.3
WIC
Default(8 Ibs/sq.ft.
ftz
ft
0.3
MASTER BATH
Default(8 Ibs/sq.ft.
ftz
ft
0.3
M. BATH
Default(8 Ibs/sq.ft.
ftz
ft
0.3
LAUDRY
Default(8 Ibs/sq.ft.
ftz
ft
0.3
BEDROOM 2
Default(8 Ibs/sq.ft.
ftz
ft
0.3
DINING/GREAT R
Default(8 Ibs/sq.ft.
ftz
ft
0.3
KITCHEN
Default(8 Ibs/sq.ft.
ftz
ft
0.3
BATH
Default(8 Ibs/sq.ft.
ftz
ft
0.3
HALL
Default(8 Ibs/sq.ft.
ft.
ft
0.3
FOYER
Default(8 Ibs/s .ft.
ftz
ft
0.3
BEDROOM 3
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017. FBC 6th Edition (2017) Compliant Software Page 5 of 5
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE:402.4.1.1
AIR BARRIER:AND INSULATIOWNSPECTION COMPONENT CRITERIA
Project Name: WYNNE THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR.
Street: Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL, Permit Number:
Owner: WYNNE BUILDING CROP Jurisdiction: _ ST. LUCIE COUNTY
z
Design Location: FL, Fort Pierce
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
.
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the.top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed.in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be; installed. to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the' underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I .vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be.provided between the garage and conditioned spat
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope.shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinkler cover plates and walls or cenlinaq
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
4/21/2020 10:32 AM EnergyGauge® USA 6.0:02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (E.PL) DISPLAY BARD
ESTIMATED ENERGY PERFORMANCE INDEX* =. 99
The loafer the Energy Performance Index, the more -efficient the home.
1. New home or, addition
1. New From Plans)
12. Ducts, location & insulation level
a) Supply ducts R
6.0
2. Single-family or multiple -family
2. Single-family
-b) Return ducts R
6.0
c) AHU location
Attic
3. No. of. units (if multiple -family)
3.
1
4. Number of bedrooms
4.
2
13. Cooling system: Capacity
34.8
a) Split system SEER
15.0
5. Is this a worst case? (yes/no)
5.
Yes
b) Single:package SEER
c) Ground/water.source SEER/COP
6. Conditioned floor area (sq. ft.)
6.
1446
d) Room unit/PTAC EER
e) Other
7. Windows, type and area
a) U-factor:(weighted average)
7a.
1.060
b) Solar Heat Gain Coefficient (SHGC)
7b.
0.284
14. Heating system: Capacity
34.8
c) Area
7c.
141.3
a) Split system heat pump HSPF
8.5.
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance COP
a) U-factor:(weighted average)
8a.
NA
d) Gas furnace, natural gas AFUE
b) Solar Heat Gain Coefficient (SHGC)
8b.
NA
e) Gas furnace, LPG AFUE
f) Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
9a.
0.0
b) Wood, raised (R-value)
9b.
15. Water heating system
c) Concrete, raised (R-value)
9c.
a) Electric resistance EF
0.97
b) Gas -fired, natural gas EF
10. Wall type and insulation:
c). Gas fired, LPG EF
A: Exterior:
d) Solar system with tank EF
1. Wood frame (Insulation R-value)
10A1.
e) Dedicated heat pump with tank EF
I Masonry (Insulation R-value)
10A2.
4.1
f) Heat recovery unit HeatRec%
B. Adjacent:
g) Other
1. Wood frame (Insulation R-value)
1061.
11.0
2. Masonry (Insulation R-value)
1dB2.
16. HVAC credits claimed (Performance Method)
11. Ceiling ,type and insulation level a) Ceiling fans
a) Under attic 11a. 30.0 b) Cross ventilation No
b) Single assembly 11b. c) Whole house fan No
c) Knee walls/skylight walls 11 c. 19.0 d) Multizone cooling credit
d) Radiant barrier installed 11 d. No e) Multizone heating credit
f) Programmable thermostat Yes
"Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving.features which will be installed (or exceeded): in this home before final inspection. Otherwise, a new EPL
display card will .be completed based on installed code compliant features.
Builder Signature: Date:
Address of New Home..\ -I _`�c"" � City/FL Zip: FT: PIERCE, FL-;!�-Ac S7
4/21/2020 10:32:17 AM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1