Loading...
HomeMy WebLinkAbout210708-1d compaction - signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net DATE TESTED:KSM JOB #:210708-1d/CF/ah PERMIT #:NUC #234 CONTRACTOR:St. Lucie Structure Nuc Model:MC-DR JOB LOCATION:3416 Industrial 31st Street Nuc Serial #:MD60308234 Ft. Pierce, Florida ITEM TESTED:Compacted Foundation Fill TEST LOCATION OF SAMPLE DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1. N.E.0" - 12"50+107.5 110.9 96.9% 2. Center ""108.5 "97.8% 3. S.W.""108.8 "98.1% Soil Description: Brown Sand In Place Moisture: 10.1% Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 110.9 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for Unstaked Foundation Respectfully Submitted: Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 1/28/2021 Email to: St. Lucie Building Department ; bigbmorris@aol.com SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 January 25, 2021 2011-0405 Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Proudly Serving Florida since 1990 106.0 107.0 108.0 109.0 110.0 111.0 8 9 10 11 12 13 14 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight