Loading...
HomeMy WebLinkAboutProduct Approval Florida Building Code On* Page 1 of 2 »�..�. BCIS Home Log In User Registration Hot Topics Submit Surcharge Stats&Facts ` Publications FBC Staff BCIS Site Map L Product Approval dopr 4 USER: Public User ti�'''" Product Approval Menu>Product or Application Search>Application List>Application Detail a. FL# FL16027-R1 Application Type Revision THESE PLANS AND ALL PROPOSED WORK Code Version 2014 Application Status Approved ARE SUBJECT TO ANY COFAECTIONS RQUIRE D BY FIELD INSPECTORS THAT Comments MAY BE NECESSARY IN OIIRD2A TO Archived COMPLY WITH All APPLECAME COVES. Product Manufacturer Tri-Built Materials Group, LLC Address/Phone/Email PO Box 70 Rutherford, NJ 07070 (800) 516-1485 david.ruiz@tribuiltmg.com Authorized Signature David Ruiz david.ruiz@tribuiltmg.com Technical Representative C Richard Schurman Address/Phone/Email 9050 Louisiana Street Merrillville, IN 46410 rich.schurman@alliedbuilding.com Quality Assurance Representative C Richard Schurman Address/Phone/Email 9050 Louisiana Street Merrillville, IN 46410 rich.schurman@alliedbuilding.com Category Roofing Subcategory Modified Bitumen Roof System Compliance Method Evaluation Report from a Florida Registered Architect or a Licen Professional Engineer ?TA/1 11C1f}� N Evaluation Report^/�INlakprpl MT1N�ORAI ACHAGlllt7 Florida Engineer or Architect Name who developed the Robert Nieminen 1/U �ARG{�,THiERE`i(PO,N 1810YOFTHE Evaluation Report Florida License PE-59166 Quality Assurance Entity UL LLC Quality Assurance Contract Expiration Date 03/31/2019 Validated By John W. Knezevich, PE Validation Checklist- Hardcopy Received Certificate of Independence FL16027 R1 COI 2015 01 COI Nieminen.pdf Referenced Standard and Year(of Standard) Standard Year ASTM D6163 2000 ST.LUCIE COUNTY ASTM D6222 2005 2008 BUILDING DIVISION ASTM D6Zz2 1992 REVIEWED FM 4470 1992 FOR COMPL FM 4474 2004 REVIEWED BY DATE 22-/ PLANS AND PIE PC IT MUST BE KEPT O JOB OR NO INSPECTION WILL BE MADE — Yttp:�/www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgt... 5/22/2017 Florida Building Code On • Page 2 of 2 Equivalence of Product Standards Certified By Sections from the Code V Product Approval Method Method 1 Option D Date Submitted 03/23/2015 Date Validated 03/29/2015 Date Pending FBC Approval 03/31/2015 Date Approved 06/22/2015 Summary of Products FL# Model, Number or Name Description 16027.1 TRI-BUILT Modified Bitumen Roof SBS and APP modified bitumen roof systems Systems Limits of Use Installation Instructions Approved for use in HVHZ: No FL16027 R1 11 2015 03 FINAL Al ER TRI- Approved for use outside HVHZ: Yes BUILT MODBIT FL16027-Rl.l)d Impact Resistant: N/A Verified By: Robert Nieminen PE-59166 Design Pressure: +N/A/-622.5 Created by Independent Third Party: Yes Other: 1.)The DP noted in this application refers to one Evaluation Reports system. Refer to ER Appendix for all systems and max. design FL16027 R1 AE 2015 03 FINAL ER TRI- pressures. 2.) Refer to ER Section 5 for Limits of Use. BUILT MODBIT FL16027-Rl.pd Created by Independent Third Party: Yes Back FN.-tj Contact Us:: 2601 Blair Stone Road.Tallahassee FL 32399 Phone: 850-487-182-4 The State of Florida is an AA/EEO employer.Copyright 2007-2013 State of Florida. :: Privacy Statement::Accessibility Statement Refun Under Florida law,email addresses are public records.If you do not want your e-mail address released in response to a public-records requeE electronic mail to this entity.Instead,contact the office by phone or by traditional mail.If you have any questions,please contact 850.487.13E Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department'A address if they have one.The emails provided may be used for official communication with the licensee.However email addresses are public r( not wish to supply a personal address,please provide the Department with an email address which can be made available to the public.To de are a licensee under Chapter 455,F.S.,please click here. Product Approval Accepts: M EE M (.mdil Card Safe nlmmqlvl� THESE PLANS AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS "REQUIRED BY FIELD INSPECTORS THAT . MAY BE NECESSARY IN ORD2A TO COMPLY WITH ALL A10PLICABLE CGIX3. http://www.floridabuilding.org/pr/pr—app_dtl.aspx?param=wGEVXQwtDqt... 5/22/2017 TRINITY ERD APPENDIX 1:ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE Table Deck Application Type Description Page 3A-1 Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 4 1A-2 Wood New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 5 18 Wood New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 5 1C Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 6 1D Wood New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 6 1E-1 Wood New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 7 1E-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 8 1F Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 8 • 2A Steel or Conc. New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 9 2B Steel or Conc. New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 10 2C Steel or Conc. New,Reroof(Tear-Off)or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 11 3A-1 Concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 12-14 3A-2 Concrete New or Reroof(Tear-Off) A-1 Bonded Temporary Roof,Bonded Insulation,Bonded Roof Cover 15 3B Concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 15 4A LWIC New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 16-17 4B LWIC New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 17 4C LWIC New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 18-20 5A CWF New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 21 5B CWF New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 22 5C CWF New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 22 SD CWF New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 23 5E CWF New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 23 6A Gypsum New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 24 6B Gypsum New,Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 25 6C Gypsum New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 25 6D Gypsum New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 25 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 26-27 • 7B Various Recover F Non-Insulated,Bonded Base Sheet,Bonded Roof Cover 27 The following notes apply to the systems outlined herein: 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the AHJ. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 2. Insulation/base sheet fasteners shall be of sufficient length for the following deck engagement: ➢Wood: Minimum 0.75-inch penetration. ➢ Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck. ➢ Concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions. 3. Unless otherwise noted,insulation may be any one layer or combination of polyisocyanurate,polystyrene,wood fiberboard,perlite,Dens Deck,Dens Deck Prime,SECUROCK Gypsum-Fiber Roof Board or SECUROCK Glass-Mat Roof Board that meets the QA requirements of F.A.C.Rule 61G20-3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC 2603.4.1 or 2603.6,when installed with the roof cover. Exterior Research and Design,LLC.d/b/a Trinity]ERD Evaluation Report A42970.10.12-R1 for FL16027-R1 Certificate of Authorization#9503 Revision 1:03/23/2015 Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 27 EXTERIOR RESEARCH&DESIGN,LLC. Certificate of Authorization#9503 353 Christian Street TRINITY ERD Oxford,CT 06478 PHONE:(203)262-9245 FAX:(203)262-9243 EVALUATION REPORT TRI-BUILT Roofing Products Evaluation Report A42970.10.12-111 9050 Louisiana Street FL16027-R1 Merrillville, IN 46410 Date of Issuance:10/23/2012 Revision 1:03/23/2015 SCOPE: This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of construction materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen, P.E.for use of the product under the Florida Building Code. The product described herein has been evaluated for compliance with the 51h Edition(2014) Florida Building Code sections noted herein. DESCRIPTION: TRI-BUILT Modified Bitumen Roof Systems LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted herein. CONTINUED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced Quality Assurance documentation changes,or provisions of the Code that relate to the product change. Acceptance of this Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product changes or the referenced Quality Assurance documentation changes. TrinityJERD requires a complete review of this Evaluation Report relative to updated Code requirements with each Code Cycle. ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in advertising literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety. INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This Evaluation Report consists of pages 1 through 4,plus a 27-page Appendix. Prepared by: `pvtNlt ttnzz,,y.� OF The facsimile seal appearing was authorized by Robert Nieminen, Robert J.M.Nieminen,P.E. ''i f�'•.:^41�.r'::' P.E.on03/23/2015.This does not serve as an electronically signed Florida Registration No.59166,Florida DCA ANE1983 document.Signed,sealed hardcopies have been transmitted to the Product Approval Administrator and to the named client CERTIFICATION OF INDEPENDENCE: 1. Exterior Research&Design,LLC.d/b/a Trinity ERD does not have,nor does it intend to acquire or will it acquire,a financial interest in any company manufacturing or distributing products it evaluates. 2. Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or distributing products it evaluates. 3. Robert Nieminen,P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for which the evaluation reports are being issued. 4. Robert Nieminen, P.E.does not have, nor will acquire,a financial interest in any other entity involved in the approval process of the product. 5. This is a building code evaluation. Neither Trinity I ERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained specifically for that purpose. TRINITY ERD ROOFING SYSTEMS EVALUATION: -: 1. SCOPE: Product Category: Roofing i Sub-Category: Modified Bitumen Roof Systems Compliance Statement: TRI-BUILT Modified Bitumen Roof Systems, as produced by Allied Building Products Corp. /TRI-BUILT Roofing Products, have demonstrated compliance with the following sections of the Florida Building Code through testing in accordance with the following Standards. Compliance is subject to the Installation Requirements and Limitations/Conditions of Use set forth herein. 2. STANDARDS: Section Property Standard Year 1504.3.1 Wind FM 4474 2004 1504.7 Impact FM 4470 1992 1507.11.2 Physical Properties ASTM D6163 2000 1507.11.2 Physical Properties ASTM D6164 2005 1507.11.2 Physical Properties ASTM D6222 2008 3. REFERENCES: Enti Examination Reference Date ERD(TST6049) Physical Properties P10490.10.08-2 10/30/2008 ERD(TST6049) FM 4470/4474 P13760.09.09 09/10/2009 ERD(TST6049) FM 4470/4474 P13770.09.09 09/10/2009 ERD(TST6049) FM 4470/4474 P30540.11.09-111 11/30/2009 ERD(TST6049) FM 4470/4474 P30550.12.09 12/02/2009 ERD(TST6049) Physical Properties P33960.12.10 12/30/2010 ERD(TST6049) FM 4470/4474 P33970.03.11 03/15/2011 ERD(TST6049) Physical Properties P37590.03.13-3A 03/06/2013 ERD(TST6049) FM 4470/4474 P39680.03.13 03/04/2013 ERD(TST6049) Physical Properties P37590.03.13-1-R1 06/26/2013 ERD(TST6049) Physical Properties P37590.03.13-2-R1 07/01/2013 ERD(TST6049) Physical Properties P37590.07.13-2 07/01/2013 ERD(TST6049) Physical Properties P37590.03.13-5-RS 07/01/2013 ERD(TST6049) Physical Properties P37590.07.13-1 07/02/2013 ERD(TST6049) Physical Properties P45940.09.13 09/04/2013 ERD(TST6049) Physical Properties P44370.10.13 10/04/2013 FM Approvals(TST1867) FM 4470 2W7A7.AM 08/04/1994 FM Approvals(TST1867) FM 4470 OD3A3.AM 04/04/1997 FM Approvals(TST1867) FM 4470 2DOAO.AM 12/23/1998 FM Approvals(TST1867) FM 4470 2D5A9.AM 06/22/1999 FM Approvals(TST1867) FM 4470 3006646 01/04/2000 FM Approvals(TST1867) FM 4470 3001334 01/25/2000 FM Approvals(TST1867) FM 4470 3001334 02/15/2000 FM Approvals(TST1867) FM 4470 3000857 01/12/2000 FM Approvals(TST1867) FM 4470 3004091 01/12/2000 FM Approvals(TST1867) FM 4470 3006115 05/02/2001 FM Approvals(TST1867) FM 4470 3012321 07/29/2002 FM Approvals(TST1867) FM 4470 3014692 08/05/2003 FM Approva Is(TST1867) FM 4470 3014751 08/27/2003 FM Approva Is(TST1867) FM 4470 3007170 01/13/2004 FM Approvals(TST1867) FM 4470 3019317 06/30/2004 FM Approvals(TST1867) FM 4470 3020703 07/30/2004 FM Approvals(TST1867) FM 4470/4474 3018332 01/31/2006 FM Approvals(TST1867) FM 4470/4474 3023368 03/20/2006 FM Approvals(TST1867) FM 4470/4474 3024594 05/23/2006 FM Approvals(TST1867) FM 4470/4474 3023458 07/18/2006 FM Approvals(TST1867) FM 4470/4474 3030668 09/12/2007 FM Approvals(TST1867) FM 4470/4474 3032172 06/12/2009 PRI(TST5878) Physical Properties PUSA-062-02-01 12/04/2007 PRI(TST5878) Physical Properties PUSA-061-02-02 01/28/2008 PRI(TST5878) Physical Properties PUSA-064-02-02 02/27/2008 Exterior Research and Design,I.I.C. Evaluation Report A42970.10.12-117 Certificate of Authorization p9503 FL16027-R1 Revision 1:03/23/201S Page 2 of 4 QC TRINITY ERD Enti Examination Reference Date PRI(TST5878) Physical Properties PUSA-062-02-02 12/04/2008 Miami-Dade(CER1592) HVHZ Compliance Various NOAs Various Miami-Dade(CER1592) Proposal for Review 10-0823 10/12/2010 UL LLC (QUA9625) Quality Control ML Agreement 02/27/2012 UL LLC (QUA9625) Quality Control ML Correlation,R27202 08/20/2012 UL LLC (QUA9625) Quality Control Service Confirmation,R14571 Exp.06/27/2016 4. PRODUCT DESCRIPTION: This Evaluation Report covers TRI-BUILT Modified Bitumen Roof Systems installed in accordance with Allied Building Products Corp. / TRI-BUILT Roofing Products published installation instructions and the Limitations / Conditions of Use herein. The following membranes make up the subject systems. Table 1:Roll-Goods for TRI-BUILT Modified Bitumen Roof Systems Type Product Specification Reference Grade Type TriBuilt SA SBS Base ASTM D6163,Table 2 S 1 SBS Membranes TriBuilt SBS Granular ASTM D6164 G I TriBuilt SA SBS Cap ASTM D6164 G I Tn uilt APP Smooth ASTM D6222 S I APP Membranes TriBuilt APP Granular ASTM D6222 G I TriBuilt SA APP Cap ASTM D6222 G I S. LIMITATIONS: 5.1 This is a building code evaluation. Neither Trinity)ERD nor Robert Nieminen,P.E.are,in any way,the Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained specifically for that purpose. 5.2 This Evaluation Report is not for use in HVHZ. 5.3 Refer to a current Roofing Materials Directory for fire ratings of this product. 5.4 For steel deck installations,foam plastic insulation shall be separated from the building interior in accordance with FBC 2603.4 unless the exceptions stated in FBC 2603.4.1 and 2603.6 apply. 5.5 Unless otherwise noted in Appendix 1, roof decking and its attachment shall be specified and installed to meet project design criteria to the satisfaction of the AHJ. 5.6 For recover installations,the existing roof shall be examined in accordance with FBC 1510. 5.7 For mechanically attached insulation or membrane or strip-bonded insulation, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are RAS 117 and FM LPDS 1-29. Assemblies marked with an asterisk'carry the limitations set forth in Section 2.2.1.5.1(a)of FM LPDS 1-29 for Zone 2/3 enhancements. 5.8 For fully-adhered insulation,the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No rational analysis is permitted for these systems 5.9 For mechanically attached insulation or membrane over existing roof decks,fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be in accordance with TAS 105 or ANSI/SPRI FX-1. 5.10 For bonded insulation or membrane over existing substrates in a re-roof(tear off) or recover installation, the existing deck or existing roof surface shall be examined for compatibility with the adhesive to be installed. If any surface conditions exist that bring system performance into question,field uplift testing in accordance with ASTM E907,FM LPDS 1-52,ANSI/SPRI IA-1 or TAS 124 shall be conducted on mock-ups of the proposed new roof assembly. 5.11 For bonded insulation or membrane over existing substrates in a recover installation,the existing roof system shall be capable of resisting project design pressures on its own merit to the satisfaction of the AHJ,as documented through field uplift testing in accordance with ASTM E907,FM LPDS 1-52 or TAS 124. Exterior Research and Design,U.C. Evaluation Report A42970.10.12-R3 Certificate of Authorization#9503 l FL16027-R1 1 Revision 1:03/23/2015 Page 3 of 4 i TRINITY ERD 5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with FBC Chapter 16 and tested for resistance in accordance with ANSI/SPRI ES-1 or RAS 111, except the basic wind speed shall be determined from FBC Figure 1609. 5.13 All products in the roof assembly shall have quality assurance audit in accordance with the FBC and F.A.C.Rule 61G20-3. 6. INSTALLATION: 6.1 TRI-BUILT Modified Bitumen roof systems shall be installed in accordance with Allied Building Products Corp./TRI-BUILT Roofing Products published installation instructions,subject to the Limitations/Conditions of Use noted below. 6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads,and reflects the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind loads. 7. BUILDING PERMIT REQUIREMENTS: As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of this product. 8. MANUFACTURING PLANTS: Contact the noted CIA agency for information on product locations covered for F.A.C.Rule 61G20-3 CIA requirements. 9. QUALITY ASSURANCE ENTITY: UL LLC—QUA9625;(314)578-3406,k.chancellor@us.ul.com -THE 27-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT- FILE COPY Exterior Research and Design,U.C. Evaluation Report A42970.30.12-R3 Certificate of Authorization#9503 FL16027-R1 Revision 1:03/23/2015 Page 4 of 4