Loading...
HomeMy WebLinkAboutRules for Contractors at Islandia IIATTF-NTION ALL CONTRACT"'RS ! a.WESF©R 1. All contractors must provide the office with a copy of workmen's comp, liability insurance and licenses. If the Islandia 11 office does not have the proper credentials on file no contractor or workman will be allowed on the property. scope of work for he uni you are working in is required, listin of subcant ,a to s and materials to be used, he star Ma.volanutelpected com Ietlon date If you have sub -contractors make sure they are aware of these `ru. s as well. 2. You must sign in and out at the office each day. = 3. CONTRACTORS — DELIVERIES - MOVES: Unit owners and contractors are required to'contacAhe office at least ours p io to making arrangements of any kind concerning construction, move in's or, move out's,,.pr deliveries. This ne oes not mean we can uarantee our schedule at the re sted dat . Management will schedule a date with you and than outfit the larger elevator which is the only elevator approved for this use. All moving,must: begstarted and completed between the hours of 8:00am and 3:45pm Monday thru Friday. CI Fa * P.T+If)NS� 4. Contractors may work W[VR`da—LTfflRu1Fjf5da, fv ram B:OOam to 3:_45 All work must e e h 3:5 and all contractors off the property by 4:00pm. Work is not permitted on weekends by contractors or owners. , t) E{XCEI'.iiIUNSl 5. Vehicles must be parked on the north end of the building facing north. Do not backyour vehicle into the parking space provided. 6. If a contractor has a trailer that is used for TRASH removal or MATERIALS it can 'be parked by the north dumpster room until it is unloaded than move it to the contractor parking area. NO trailer or vehicle is .to be left there for"the entire day nor should a trailer be left there with no vehicle attached. 7. No vehicles can be parked and unloaded or loaded on the red brick in front of the building for any reason. If you have to load or unload your vehicle, see someone in the office and they will direct you on where to,park. 8. ontractors must se the service elevator You cannot keep the service. elevator locked on one floor with your tools etc... You must share with other contractors, employees and residents. Please request the use of the elevator to transport materials, tools etc. contact the office @ 772-229-2802 and we will have an escort for<you. *ontractors cart onl. use th servic ie ator to t e e t 9. Nothing can be leaned against the walls or left sitting in the lobby Na vwork will be pg"rforned in the lobby; walkways or balconies. Do not leave any materials tools etc.. on walkways when working.in the unit 10. All keys must be returned to the office if you leave for lunch and at the end of the day the office is closed for lunch slide the key under the door. 11. Do not leave the doors open in the unit You are working in 12. Tile cutting and drywall cutting is of ermine on the catwalks or the`balcontes&.. x 13. All work areas must be cleaned up at the end of each day. In front of the unit owfiWi doo -, walkway, elevator, stairs, parking lot, etc... sweep up the floors and or mop them. Do not leave any materials.1t6o1s etc... on the walkways.' S 14. Use of the Islandia H dumpsters is prohibited. If caught you will be charged' -for a -whole load, and not b&allowed back onto Islandia II property. k 15. If any contractors make a mess or damage any of the common areas they will-ba:billed accordingly. By signing the agreement below you are stating that you understand all the rules for working atlslandialI Condominium and agree to abide by them at all times, and you will hold harmless Islandia II Condominium Association, the-owneL and the :'representatives from' and against, any and all liability, loss, damage, claim or action, to the extent permissible by law, arising out of the operation, performed or services provided by the contractor under the contract. If a unit owner has supplied you with a key to their unit you as the contractor is resp6psible for any damages to the unit you are working in and any damages to the condominium complex. Please be sure your contractof & or workers can communicate with the Islandia II Employees. r. The contractorbelowalso understands no/work—will be performed after4:00pm Monday thru Friday;Holiday's or weekends. in/= Construction Company Name — 1- c Phone 3 Date 10 FF �� " ` 1 f/Ll'� 1ar3.^►%,�'i . J "ra6. Contractor Name- Please Print ell Phone Unit I�3nnlief `t r � �`,'� i n7x �✓ref '�• 04/01/2010 Y